ENPH-2014.12.31-10K
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
(Mark One)
| |
x | ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the fiscal year ended December 31, 2014
| |
o | TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the transition period from to
Commission File Number: 001-35480
(Exact name of registrant as specified in its charter)
|
| |
Delaware | 20-4645388 |
(State or other jurisdiction of incorporation or organization) | (I.R.S. Employer Identification No.) |
1420 N. McDowell Blvd
Petaluma, CA 94954
(Address of principal executive offices) (Zip Code)
(707) 774-7000
(Registrant’s telephone number, including area code)
Securities registered pursuant to Section 12(b) of the Act:
|
| |
Title of each class: | Name of each exchange on which registered |
Common Stock, par value $0.00001 per share | The NASDAQ Stock Market LLC |
Securities registered pursuant to Section 12(g) of the Act: None
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes o No x
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes o No x
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes x No o
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes x No o
Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. o
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in
Rule 12b-2 of the Exchange Act. (Check one):
|
| | | |
Large accelerated filer | o | Accelerated filer | x |
Non-accelerated filer | o (Do not check if a smaller reporting company) | Smaller reporting company | o |
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes o No x
The aggregate market value of the voting stock held by non-affiliates of the registrant on June 30, 2014, based upon the closing price of $8.55 of the registrant’s common stock as reported on the NASDAQ Global Market, was approximately $143.2 million. Excludes approximately 26.1 million shares of the registrant’s common stock held by current executive officers, directors, and holders of five percent or more of the outstanding common stock in that such persons may be deemed to be affiliates. This determination of affiliate status is not necessarily a conclusive determination for other purposes.
As of February 28, 2015, there were 43,914,728 shares of the registrant’s common stock outstanding.
DOCUMENTS INCORPORATED BY REFERENCE
Certain information called for by Part III of this Form 10-K is incorporated by reference to the Proxy Statement for the registrant’s 2015 Annual Meeting of Stockholders, which will be filed with the Securities and Exchange Commission not later than 120 days after December 31, 2014.
ENPHASE ENERGY, INC.
TABLE OF CONTENTS
|
| | |
| | Page |
| | |
Item 1. | | |
Item 1A. | | |
Item 1B. | | |
Item 2. | | |
Item 3. | | |
Item 4. | | |
| | |
Item 5. | | |
Item 6. | | |
Item 7. | | |
Item 7A. | | |
Item 8. | | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
Item 9. | | |
Item 9A. | | |
Item 9B. | | |
| | |
Item 10. | | |
Item 11. | | |
Item 12. | | |
Item 13. | | |
Item 14. | | |
| | |
Item 15. | | |
PART I
This Annual Report on Form 10-K contains “forward-looking statements” as defined under securities laws. Forward-looking statements include statements that are not historical facts and can be identified by terms such as “anticipates,” “believes,” “could,” “seeks,” “estimates,” “expects,” “intends,” “may,” “plans,” “potential,” “predicts, “projects,” “should,” “will,” “would” or similar expressions and the negatives of those terms. These forward-looking statements are contained principally in Item 1, Business; Item 1A, Risk Factors; Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations; and other sections of this Annual Report on Form 10-K. Our actual results or experience could differ significantly from the forward-looking statements. Factors that could cause or contribute to these differences include those discussed in Item 1A, Risk Factors, as well as those discussed elsewhere in this Annual Report on Form 10-K.
Forward-looking statements are inherently uncertain and you should not place undue reliance on these statements, which speak only as of the date that they were made. These cautionary statements should be considered in connection with any written or oral forward-looking statements that we may issue in the future. We do not undertake any obligation to release publicly any revisions to these forward-looking statements after completion of the filing of this Annual Report on Form 10-K to reflect later events or circumstances or to reflect the occurrence of unanticipated events.
In this report, unless otherwise indicated or the context otherwise requires, “Enphase Energy,” “Enphase,” “the Company,” “we,” “us,” and “our” refer to Enphase Energy, Inc., a Delaware corporation, and its subsidiaries.
Item 1. Business
Our Company
We deliver microinverter technology for the solar industry that increases energy production, simplifies design and installation, improves system uptime and reliability, reduces fire safety risk and provides a platform for intelligent energy management. Our semiconductor-based microinverter system converts direct current (DC) electricity to alternating current (AC) electricity at the individual solar module level, and brings a system-based, high technology approach to solar energy generation leveraging our design expertise across power electronics, semiconductors, networking and embedded and web-based software technologies. We are the market leader in the microinverter category and have grown rapidly. Since our first commercial shipment in mid-2008, we have sold over 7.2 million microinverters as of December 31, 2014, which represents over 1.6 gigawatt (AC) of solar PV generating capacity. We were the first company to commercially ship microinverter systems in volume. We currently offer microinverter systems targeting the residential and commercial markets in the United States, Canada, the United Kingdom, France, the Benelux region, certain other European markets, Australia and New Zealand.
We were incorporated as PVI Solutions, Inc. in March 2006 in the State of Delaware and changed our name to Enphase Energy, Inc. in July 2007.
Industry Background
Historically, traditional central inverters were the only inverter technology used for solar photovoltaic, or PV installations. In an installation consisting of a traditional central inverter, the solar PV modules are connected in series strings. In a large installation, there are multiple series strings connected in parallel. The aggregated voltage from each of these strings is then fed into a large central inverter. As compared to microinverter systems, we believe that traditional central inverters have a number of design and performance challenges limiting innovation and their ability to reduce the cost of solar systems, including the following:
| |
• | Productivity limits. If solar modules are wired using a traditional central inverter—group or “string” of modules are wired in series—an entire string’s output is limited by the output of the lowest-performing module. Because of its string design, there is a single point of failure risk with the traditional central inverter approach. |
| |
• | Reliability issues. Traditional central inverters are the single most common component of solar installations to fail, resulting in system downtime and adversely impacting total energy output. As a result, central inverters typically carry warranties of only 5 to 10 years. |
| |
• | Complex design and installation requirements. The central inverter-based solar PV installation requires greater effort on the part of the installer, both in terms of design and on-site labor. Central inverter installations require string design and calculations for safe and reliable operation, as well as specialized equipment such as DC combiners, conduits and disconnects. In addition, the use of high-voltage DC requires specialized knowledge and training and safety precautions to install central inverter technology. |
| |
• | Lack of monitoring. The majority of solar installations with central inverter technology offer limited monitoring capabilities. A failure of the central inverter will often go unnoticed for days or even weeks. If a module fails or is not performing to specification, the resulting loss of energy can go unnoticed for an extended period of time. |
| |
• | Safety issues. Central inverter solar PV installations have a wide distribution of high-voltage (600 volts to 1,000 volts) DC wiring. If damaged, DC wires can generate sustained electrical arcs, reaching temperatures of more than 5,000 °F. This creates the risk of fire for solar PV installation owners and injury for installers and maintenance personnel. |
These challenges of traditional central inverters have a direct impact on the cost and expected return on investment of solar installations to both installers and system owners:
| |
• | Installer. Solar PV installers aim for simple installation design, fast installation times and maximum system performance and predictability. The installation of high-voltage DC central inverter technology, however, requires significant preparation, precautionary safety measures, time-consuming string calculations, extensive design expertise and specialized installation equipment, training and knowledge. Together, these factors significantly increase complexity and cost of installation and limit overall productivity for the installer. |
| |
• | System owner. Solar system owners aim for high energy production, low cost, high reliability and low maintenance requirements, as well as reduced fire risks. With traditional central inverters, owners often are unable to optimize the size or shape of their solar PV installations due to string design limitations. As such, they experience performance loss from shading and other obstructions, can face frequent system failures and lack the ability to effectively monitor the performance of their solar PV installation. In addition, central inverter installations operate at high-voltage DC which bears significant fire risks. Further, due to their large size, central inverter installations can affect architectural aesthetics of the house or commercial building. |
Our Products
We design, develop, manufacture and sell a microinverter system for the solar PV industry. We have built from the ground up a semiconductor-based microinverter system that converts energy at the individual solar module level and, combined with our proprietary networking and software technologies, provides advanced energy monitoring and control. This is vastly different than the central inverter approach that can only convert energy of the entire array of solar modules from a single high voltage electrical unit, and lacks intelligence about the energy producing capacity of the solar array.
Our microinverter solution brings a system-based, high technology approach to solar energy generation leveraging our design expertise across power electronics, semiconductors, networking, and embedded and web-based software technologies. Our microinverter system consists of three key components: our Enphase microinverter, Envoy communications gateway and Enlighten web-based software:
| |
• | Our Enphase microinverter delivers efficient and reliable power conversion at the individual solar module level by introducing a digital architecture that incorporates custom application specific integrated circuits, or ASICs, specialized power electronics devices and an embedded software subsystem that optimizes energy production from each module and manages the core ASIC functions. A residential solar installation typically consists of 5 to 50 microinverters; a small commercial solar installation typically consists of 50 to 500 microinverters; and a medium or larger commercial solar installation typically consists of 500 to 10,000 microinverters, or more. |
| |
• | Our Envoy communications gateway is installed in the system owner’s home or business and serves as a networking hub that collects data from the microinverter array and sends the information to our hosted data center. One Envoy is typically sold with each solar installation and can support up to [500] Enphase microinverters. |
| |
• | Our Enlighten web-based software collects and analyzes this information to enable system owners to monitor and realize the highest performance of their solar PV system. In addition, Enlighten also provides an online portal specifically designed for installers to enable them to track and manage all of their Enphase enabled projects and monitor and analyze the performance of their installed systems. |
Together, our Enphase microinverter, Envoy communications gateway and Enlighten web-based software function as a single unified system that enhances energy production, simplifies design and installation, reduces costs, increases system uptime and reliability, reduces fire safety risk and provides the ability to monitor performance in real-time. With an Enphase microinverter system, we believe solar system owners can achieve a higher return on investment over the lifetime of the solar system than would be achieved using a traditional central inverter approach.
Key elements of our solution include:
Productive-Superior Energy Production. Our microinverter system enables the maximum possible energy production from each module, overcoming a fundamental design limitation of central inverters which are limited by the lowest performing module. We believe that our microinverter systems achieve higher energy production and can generate superior returns on investment relative to central inverter solutions for system owners.
Reliable-Longer Life and No Single Point of Failure. Reduction of component count, primarily through semiconductor integration in our microinverter, allows us to design a reliable system that can withstand harsh environmental conditions. In addition, because we process low voltages and power levels, our components experience less stress and last longer than traditional central inverters. Furthermore, the distributed architecture of our microinverter system translates into greater system uptime. If a microinverter unit fails, it results in lost energy production from a single solar module only and not the entire array. In addition, we offer a limited warranty of up to 25 years on our microinverters.
Simple-Ease of Design and Installation. Using microinverter technology, an installer can design a system of any size and any roof configuration with a simple modular approach. After initial installation, the system can be easily expanded by even a single module. Our single inverter per module approach converts directly to AC and enables a simpler, all AC design, eliminating the extra cost, training and complexity associated with typical high voltage DC implementation. Without these complexities, installation of microinverter technology is greatly simplified, improving installers’ productivity. This also enables a new class of solar installer, such as electricians and general contractors. Finally, our microinverters are installed on the roof and hidden from view, with minimal impact to the aesthetics of a home or building.
Smart-Module-Level Monitoring and Analytics. Our microinverter system allows us to collect energy production information in real time on a per solar module basis. This enables powerful system analytics and allows Enphase to offer installers visibility into how systems are performing and the ability to continuously optimize energy production-which is particularly important when operating commercial solar installations. Such services include system performance and diagnostics, benchmarking, as well as system and module alerts and fault statistics.
Safe-“All AC” Solution. Microinverters are safer because they process low DC voltages relative to central inverters. High voltage arc faults associated with traditional central inverter are the leading cause of fires of solar PV installations. Microinverter technology mitigates this safety risk.
Due to the benefits of our solution, we believe solar installers achieve greater productivity and competitive differentiation over installers of traditional central inverter solar PV installations, and the solar system owner achieves a higher return on investment with an Enphase microinverter system over the life of the solar system.
Our Strategy
Our objective is to continue to be the leading provider of microinverter systems for the solar industry worldwide and to accelerate the shift from traditional central inverters to microinverter technology. Key elements of our strategy include:
| |
• | Continue to Penetrate Our Core Markets. We intend to capitalize on our market leadership in the microinverter category and our momentum with installers and owners to expand our market share position in our core U.S. market. |
| |
• | Enter New Geographic Markets. We intend to further increase our market share in Europe and Asia Pacific region. In addition, we intend to expand into new markets with new and existing products and local go-to-market capabilities. |
| |
• | Expand Our Product Offering for Commercial Installations, Utility-Scale Installations and Microgrids. We intend to expand our product offering by introducing new microinverter systems targeted at larger commercial installations, utility-scale installations and microgrids. |
| |
• | Increase Power and Efficiency and Reduce Cost per Watt. Our engineering team is focused on continuing to increase average power conversion efficiency above 96.5% and AC output power beyond 250 watts. We intend to continue to leverage our semiconductor integration, power electronics expertise and manufacturing economies of scale to further reduce cost per watt. |
| |
• | Extend Our Technological Innovation. We distinguish ourselves from other inverter companies with our system- based and high-tech approach, and the ability to leverage strong research and development capabilities. As of December 31, 2014, we had 50 issued U.S. patents, 26 issued foreign patents, 89 pending U.S. patent |
applications and 159 pending foreign counterpart patent applications.
| |
• | Provide Enphase Energy Services. We are building out an asset management and operations and maintenance service organization to support the increasing demand for services in the residential, commercial and utility scale PV systems. |
| |
• | Develop a Software Management Platform. We intend to build upon our strong position as the leading supplier of microinverter systems to develop additional energy management services for our growing network of solar installers worldwide. |
Customers and Sales
We currently offer microinverter systems targeting the residential and commercial markets in the United States, Canada, the United Kingdom, France, the Benelux region, certain other European markets, Australia and New Zealand. We sell our microinverter systems primarily to solar distributors who resell to installers and integrators, who in turn integrate our products into complete solar PV installations for residential and commercial system owners. We work with many of the leading solar distributors. In 2014, Vivint Solar, Inc. and CED Greentech accounted for 24% and 16% of total net revenues, respectively. In addition to our distributors, we sell directly to large installers, OEMs and strategic partners. Our OEM customers include solar module manufacturers who bundle our products and solutions with their solar module products and resell to both distributors and installers. Strategic partners include a variety of companies and arrangements, including industrial equipment suppliers and providers of solar financing solutions. We also sell the Enphase-branded product directly to electrical contractor distributors in North America. Historically, revenues generated from the U.S. market have represented more than 80% of our total revenues, with the remainder from Canada, Europe and Asia Pacific region.
Manufacturing, Quality Control and Key Suppliers
We outsource the manufacturing of our products to two key manufacturing partners, Flextronics International Ltd. and Phoenix Contact GmbH & Co. KG. Flextronics assembles and tests our microinverter pursuant to a manufacturing services agreement. Prices for such services are mutually agreed to by the parties on a quarterly basis and we are obligated to purchase manufactured products and raw materials that cannot be resold upon the termination of the agreement. Flextronics’ assembly and test plants for our products are located in Fuyong, China. Flextronics also provides receiving, kitting, storage, transportation, inventory visibility and other value-added logistics services at locations managed by Flextronics pursuant to a logistics services agreement. Phoenix manufactures our custom AC cable pursuant to a cooperation agreement. Phoenix’s facilities are located in Poland and China. In addition, we rely on several unaffiliated companies to supply certain components used in the fabrication of our microinverter system.
Customer Service
We maintain high levels of customer engagement through our customer support group and the Enlighten web-based software portal, and have cultivated an organizational focus on customer satisfaction. Our dedicated customer support group focuses on responding to inbound inquiries regarding any of our products and services. As of December 31, 2014, our customer support staff consisted of 67 employees in the United States, 11 employees in Europe and 3 employees in Australia.
In addition, customized support programs are being developed for selected OEM partners, large direct installers and distributors to help prioritize and track support issues for key partners and to provide a single point of contact.
Research and Development
We devote substantial resources to research and development with the objective of developing new products and systems, adding new features to existing products and systems and reducing unit costs of our Enphase microinverter system. Our development strategy is to identify features, products and systems for both software and hardware that reduce the cost and optimize the effectiveness of our microinverter solutions for our customers. We measure the effectiveness of our research and development against metrics, including product unit cost, efficiency, reliability, power output and ease-of-use. As of December 31, 2014, our research and development staff consisted of 207 employees, of whom 184 were located in the United States and the remainder primarily located in New Zealand.
Our research and development expenses were $45.4 million, $34.5 million and $35.6 million for the years ended December 31, 2014, 2013 and 2012, respectively.
Intellectual Property
Our success depends, in part, on our ability to maintain and protect our proprietary technologies. We rely primarily on patent, trademark, copyright and trade secrets laws in the United States and similar laws in other countries, confidentiality agreements and procedures and other contractual arrangements to protect our technology. As of December 31, 2014, we had 50 issued U.S. patents, 26 issued foreign patents, 89 pending U.S. patent applications and 159 pending foreign counterpart patent applications. Our issued patents are scheduled to expire between years 2027 and 2032.
We license certain power line communications technology and software for integration into our ASICs pursuant to a fully-paid, royalty-free license, which includes the right for us to source directly from the licensor’s suppliers or manufacture certain ASIC hardware should the licensor fail, under certain conditions, to deliver such technology in the future. This license includes a limited exclusivity period during which the licensor has agreed not to license the licensed technology to any third party manufacturer of electronic components or systems for use in the solar energy market. The license carries a seventy-five year term, subject to earlier termination upon mutual agreement of the parties, or by us in connection with the insolvency of the licensor.
We also license digital intellectual property cores, or IP blocks, for integration into and distribution with certain electronic components built into our products, including our ASICs, complex programmable logic devices, or CPLDs, and field-programmable gate arrays, or FPGAs. This is a fully-paid, non-exclusive, non-transferrable, royalty-free license providing for the integration of such digital IP blocks in an unlimited number of electronic component designs and the distribution of such electronic components with our products. Other than in connection with the distribution of our products, our use of such digital IP blocks is limited to certain of our business sites. The license is perpetual, subject to earlier termination by either party upon the termination, suspension or insolvency of the other party’s business, or by the licensor upon a breach of the license agreement by us. In addition, we license open source software from third parties for integration into our Envoy products. Such open source software is licensed under open source licenses. These licenses are perpetual and require us to attribute the source of the software to the original software developer, which we provide via our website.
We continually assess appropriate occasions for seeking patent protection for those aspects of our technology, designs and methodologies and processes that we believe provide significant competitive advantages. A majority of our patents relate to DC to AC power conversion for alternative energy power systems, as well as power system monitoring, control and management systems.
With respect to, among other things, proprietary know-how that is not patentable and processes for which patents are difficult to enforce, we rely on trade secret protection and confidentiality agreements to safeguard our interests. We believe that many elements of our microinverter manufacturing process involve proprietary know-how, technology or data that are not covered by patents or patent applications, including technical processes, test equipment designs, algorithms and procedures.
All of our research and development personnel have entered into confidentiality and proprietary information agreements with us. These agreements address intellectual property protection issues and require our employees to assign to us all of the inventions, designs and technologies they develop during the course of employment with us.
We also require our customers and business partners to enter into confidentiality agreements before we disclose any sensitive aspects of our microinverter, technology or business plans.
Seasonality
Historically, sales of our products in the second, third and fourth quarters have been positively affected by seasonal customer demand trends, including solar economic incentives, weather patterns and construction cycles, followed by a seasonally softer first quarter. Although these seasonal factors are common in the solar sector, historical patterns should not be considered a reliable indicator of our future sales activity or performance.
Competition
The markets for our products are highly competitive, and we compete both with well-established traditional central inverter manufacturers and new technology start-ups. The principal areas in which we compete with other companies include:
| |
• | Product performance and features; |
| |
• | Total cost of ownership (usually measured by levelized cost of electricity, or LCOE); |
| |
• | Breadth of product line; |
| |
• | Local sales and distribution capabilities; |
| |
• | Module compatibility and interoperability; |
| |
• | Reliability and duration of product warranty; |
| |
• | Technological expertise; |
| |
• | Brand recognition and customer service and support; |
| |
• | Compliance with industry standards and certifications and local electrical code; |
| |
• | Size and financial stability of operations; |
| |
• | Size of installed base; and |
| |
• | Local manufacturing and product content. |
Currently, competitors in the inverter market range from large, international companies such as SMA Solar Technology AG, Fronius International GmbH and ABB to emerging companies offering alternative microinverter or other solar electronics products such as DC-to-DC optimizers. We principally compete with the large, incumbent solar inverter companies because traditional central inverter solutions can be used as alternatives to our microinverter solution. We believe, however, that our microinverter solutions offer significant advantages and competitive differentiation relative to traditional central or string inverter technology, even when traditional central or string inverter technology is supplemented by DC-to-DC optimizers. SMA Solar Technology AG and ABB have introduced microinverter products. In addition, several new entrants to the microinverter market have recently announced plans to ship or have already shipped products, including some of our OEM customers and partners.
Employees
As of December 31, 2014, we had 539 employees. Of the full-time employees, 207 were engaged in research and development, 203 in sales and marketing, 61 in a general and administrative capacity and 68 in manufacturing and operations. Of these employees, 469 were in the United States, 35 in Europe, 21 in New Zealand, 12 in Australia and two employees in Canada.
None of our U.S., New Zealand, U.K. and Australia employees are represented by a labor union with respect to his or her employment with us; however, our employees in France and Italy are represented by a collective bargaining agreement. We have not experienced any employment-related work stoppages, and we consider our relations with our employees to be good.
Available Information
We file electronically with the U.S. Securities and Exchange Commission, or SEC, our annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934, as amended, or the Exchange Act. We make available on our website at www.enphase.com (under “Investors-Financial Information-SEC Filings”), free of charge, copies of these reports as soon as reasonably practicable after filing these reports with, or furnishing them to, the SEC.
Item 1A. Risk Factors
We have identified the following risks and uncertainties that may have a material adverse effect on our business, financial condition or results of operations. The risks described below are not the only ones we face. Additional risks not presently known to us or that we currently believe are not material may also significantly impair our business operations. Our business could be harmed by any of these risks. The trading price of our common stock could decline due to any of these risks, and you may lose all or part of your investment. In assessing these risks, you should also refer to the other information contained in this Annual Report on Form 10-K, including our consolidated financial statements and related notes.
We have a history of losses which may continue in the future, and we cannot be certain that we will achieve or sustain profitability.
We have incurred significant losses since we began doing business. We incurred net losses of $8.1 million, $25.9 million and $38.2 million for 2014, 2013 and 2012, respectively. As of December 31, 2014, we had an accumulated deficit of $161.0 million. We have incurred substantial operating losses since our inception, and we may continue to incur additional losses in the future. Our revenue growth may slow or revenue may decline for a number of possible reasons, many of which are outside our control, including a decline in demand for our offerings, increased competition, a decrease in the growth of the solar industry or our market share, or our failure to continue to capitalize on growth opportunities. If we fail to generate sufficient revenue to support our operations, we may not be able to achieve or sustain profitability.
Our relatively short operating history makes it difficult to evaluate our current business and future prospects.
While we have been in existence since 2006 and began shipping our products in commercial quantities until mid-2008, much of our growth has occurred in recent periods. Our relatively short operating history makes it difficult to evaluate our current business and future prospects. We have encountered and will continue to encounter risks and difficulties frequently experienced by growing companies in rapidly changing industries, including increased expenses as we continue to grow our business. If we do not manage these risks and overcome these difficulties successfully, our business will suffer.
Since we began commercial shipments of our products, our revenue, gross profit and results of operations have varied and are likely to continue to vary from quarter to quarter due to a number of factors, many of which are not within our control. It is difficult for us to accurately forecast our future revenue and gross profit and plan expenses accordingly and, therefore, it is difficult for us to predict our future results of operations.
If demand for solar energy solutions does not continue to grow or grows at a slower rate than we anticipate, our business will suffer.
Our microinverter systems are utilized in solar photovoltaic, or PV, installations, which provide on-site distributed power generation. As a result, our future success depends on continued demand for solar energy solutions and the ability of solar equipment vendors to meet this demand. The solar industry is an evolving industry that has experienced substantial changes in recent years, and we cannot be certain that consumers and businesses will adopt solar PV systems as an alternative energy source at levels sufficient to continue to grow our business. Traditional electricity distribution is based on the regulated industry model whereby businesses and consumers obtain their electricity from a government regulated utility. For alternative methods of distributed power to succeed, businesses and consumers must adopt new purchasing practices. The viability and continued growth in demand for solar energy solutions, and in turn, our products, may be impacted by many factors outside of our control, including:
| |
• | market acceptance of solar PV systems based on our product platform; |
| |
• | cost competitiveness, reliability and performance of solar PV systems compared to conventional and non-solar renewable energy sources and products; |
| |
• | availability and amount of government subsidies and incentives to support the development and deployment of solar energy solutions; |
| |
• | the extent to which the electric power industry and broader energy industries are deregulated to permit broader adoption of solar electricity generation; |
| |
• | the cost and availability of key raw materials and components used in the production of solar PV systems; |
| |
• | prices of traditional utility-provided energy sources; |
| |
• | levels of investment by end-users of solar energy products, which tend to decrease when economic growth slows; and |
| |
• | the emergence, continuance or success of, or increased government support for, other alternative energy generation technologies and products. |
If demand for solar energy solutions fails to develop sufficiently, demand for our customers' products as well as demand for our products will decrease, which would have an adverse impact on our ability to increase our revenue and grow our business.
Short-term demand and supply imbalances, especially for solar module technology, have recently caused prices for solar technology solutions to decline rapidly. Furthermore, competition in the solar industry has increased due to the emergence of Asian manufacturers along the entire solar value chain causing further price declines, excess inventory and oversupply. These market disruptions may continue to occur and may increase pressure to reduce prices, which could adversely affect our business and financial results.
The reduction, elimination or expiration of government subsidies and economic incentives for on-grid solar electricity applications could reduce demand for solar PV systems and harm our business.
The market for on-grid applications, where solar power is used to supplement a customer's electricity purchased from the utility network or sold to a utility under tariff, depends in large part on the availability and size of government and economic incentives that vary by geographic market. Because our customers' sales are typically into the on-grid market, the reduction, elimination or expiration of government subsidies and economic incentives for on-grid solar electricity may negatively affect the competitiveness of solar electricity relative to conventional and non-solar renewable sources of electricity, and could harm or halt the growth of the solar electricity industry and our business.
In general, the cost of solar power currently exceeds retail electricity rates, and we believe this tendency will continue in the near term. As a result, national, state and local government bodies in many countries, most notably Australia, Canada, France, Belgium, Germany, Italy, Japan, the People's Republic of China, the United Kingdom, Spain and the United States, have provided incentives in the form of feed-in tariffs, or FiTs, rebates, tax credits and other incentives to system owners, distributors, system integrators and manufacturers of solar PV systems to promote the use of solar electricity in on-grid applications and to reduce dependency on other forms of energy. Many of these government incentives expire, phase out over time, terminate upon the exhaustion of the allocated funding, require renewal by the applicable authority or are being changed by governments due to changing market circumstances or changes to national, state or local energy policy.
Electric utility companies or generators of electricity from other non-solar renewable sources of electricity may successfully lobby for changes in the relevant legislation in their markets that are harmful to the solar industry. Reductions in, or eliminations or expirations of, governmental incentives in regions that we focus our sales efforts could result in decreased demand for and lower revenue from solar PV systems there, which would adversely affect sales of our products. In addition, our ability to successfully penetrate new geographic markets may depend on new countries adopting and maintaining incentives to promote solar electricity, to the extent such incentives are not currently in place. Additionally, electric utility companies may establish pricing structures or interconnection requirements that could adversely affect our sales and be harmful to the solar and distributed rooftop solar generation industry.
Our focus on a limited number of specific markets increases risks associated with the elimination or expiration of governmental subsidies and economic incentives for on-grid solar electricity applications.
To date, we have generated the majority of our revenues from North America and expect to continue to generate a substantial amount of our revenues from North America in the future. There are a number of important incentives that are expected to phase-out or terminate in the future, which could adversely affect sales of our products. A substantial majority of our revenues come from the United States, which has both federal and state incentives. The Renewable Energy and Job Creation Act of 2008 provides a 30% federal tax credit for residential and commercial solar installations, which expires on December 31, 2016. The American Recovery and Reinvestment Act of 2009, as amended, created a renewable energy grant program that offered cash payments in lieu of investment tax credits to renewable energy project developers for eligible property placed in service prior to December 31, 2011 or placed in service by the specified credit termination date if construction began prior to December 31, 2011. We believe the tax credit and grant programs have had a positive effect on our sales since inception. However, unless the tax credit program is further extended, the eventual phase-out of this program could adversely affect sales of our products in the future.
We derive a significant portion of our revenues from California, which is the largest single solar market in the United States. In 2007, the State of California launched its 10-year, $3 billion “Go Solar California” campaign, which encourages the installation of an aggregate of 3,000 MW of solar energy systems in homes and businesses by the end of 2016. The largest part of the campaign, the “California Solar Initiative,” provides rebates and performance-based incentives which decrease in intervals as installation thresholds are met. The “Go Solar California” program is scheduled to expire on December 31, 2016, but the pace of installations has been high and the program is likely to conclude sooner. Both Pacific Gas and Electric and San Diego Gas and Electric have surpassed all installation thresholds in the residential sector and are no longer accepting applications. Pacific Gas and Electric is placing all new applications for the commercial sector on a waiting list, and these applications may not be able to receive incentives. Programs for other utilities and market segments continue but could conclude prior to December 31, 2016 if installations continue at their current pace.
We also sell our products in Ontario, Canada. The Ontario Power Authority Green Energy and Green Economy Act of 2009 created two separate FiT programs for projects greater than 10kW and for projects less than 10kW. These FiT programs provide participants with a fixed price for electricity produced over a 20-year contract term. Both programs were temporarily suspended for further review. The program for projects less than 10kW was re-opened to new applications in July 2012 with a procurement target of 50 MW. The program for projects between 10kW and 500kW was re-opened for new applications between December 14, 2012 and January 18, 2013 with a procurement target of 200 MW. The Government of Ontario has announced plans for annual procurement targets of 50MW of projects under 10kW and 150MW of projects between 10kW and 500kW through 2017. However, all procurement occurs at the direction of the Government of Ontario, and these plans could change or market conditions could result in procurement targets not being met. Furthermore, the Government of Ontario has the authority to change the FiTs for future contracts at its discretion and has the authority to modify, suspend, or discontinue the program at any time. Suspension of the FiT program in Ontario directly impacted and could continue to impact our business. Furthermore, any future suspension or modification of the program could negatively affect our business, financial condition and results of operations.
We also sell our products in Europe. A number of European countries, including Germany, Belgium and the United Kingdom, have adopted reductions to their FiTs, Spain announced a suspension of its FiT for new renewable energy projects in January 2012 and Italy concluded its FiT program in July 2013. Certain countries, notably Greece and Spain, have proposed or enacted taxes levied on renewable energy. These and related developments have significantly impacted the solar industry in Europe and may adversely affect the future demand for the solar energy solutions in Europe. The reductions in European tariffs and subsidies and other requirements or incentives, including local content requirements or incentives, have negatively affected and may continue to negatively affect our business, financial condition and results of operations as we seek to increase our sales in Europe.
In the first quarter of 2013, we began selling our products in Australia. In 2012, Australia enacted a national price on carbon emissions intended to increase the cost of traditional energy sources, thereby making renewable energy sources more attractive. Beginning in 2012, several states in Australia began to gradually reduce their FiTs. Australia recently elected a new national government. The new leadership has pledged to revise national energy policy, including potentially reducing Australia's renewable energy target and revising certain renewable energy financing mechanisms. In July 2014, the new leadership successfully repealed the tax on carbon emissions. The reductions in incentives and uncertainty around future energy policy may negatively affect our business financial condition, and results of operations as we seek to increase our business in Australia. Additionally, as we further expand to other countries, changes in incentive programs or electricity policies could negatively affect returns on our investments in those countries as well as our business, financial condition, and results of operations.
Our gross profit may fluctuate over time, which could impair our ability to achieve or maintain profitability.
Our gross profit has varied in the past and is likely to continue to vary significantly from period to period. Our gross profit may be adversely affected by numerous factors, some of which are beyond our control, including:
| |
• | changes in customer, geographic or product mix; |
| |
• | increased price competition, including the impact of customer discounts and rebates; |
| |
• | ability to reduce and control product costs; |
| |
• | warranty costs and reserves, including changes resulting from changes in estimates related to the long-term performance of our products, product replacement costs and warranty claim rates; |
| |
• | loss of cost savings due to changes in component or raw material pricing or charges incurred due to inventory holding periods if product demand is not correctly anticipated; |
| |
• | introduction of new products; |
| |
• | ordering patterns from our distributors; |
| |
• | price reductions on older products to sell remaining inventory; |
| |
• | our ability to reduce production costs, such as through technology innovations, in order to offset price declines in older products over time; |
| |
• | changes in shipment volume; |
| |
• | changes in distribution channels; |
| |
• | excess and obsolete inventory and inventory holding charges; |
| |
• | expediting costs incurred to meet customer delivery requirements; and |
| |
• | fluctuations in foreign currency exchange rates. |
Fluctuations in gross profit may adversely affect our ability to manage our business or achieve or maintain profitability.
The inverter industry is highly competitive and we expect to face increased competition as new and existing competitors introduce microinverter products, which could negatively impact our results of operations and market share.
To date, we have competed primarily against central or string inverter manufacturers. Marketing and selling our microinverter systems against traditional inverter solutions is highly competitive. Currently, competitors in the inverter market range from large companies such as SMA Solar Technology AG, Fronius International GmbH and ABB to emerging companies offering alternative microinverter or other solar electronics products, including DC to DC optimizer products. Several of our existing and potential competitors are significantly larger, have greater financial, marketing, distribution, customer support and other resources, are more established than we are, and have significantly better brand recognition, especially in certain markets. Some of our competitors have more resources to develop or acquire, and more experience in developing or acquiring, new products and technologies and in creating market awareness for these products and technologies. Further, certain competitors may be able to develop new products more quickly than we can and may be able to develop products that are more reliable or that provide more functionality than ours. In addition, some of our competitors have the financial resources to offer competitive products at aggressive or below-market pricing levels, which could cause us to lose sales or market share or require us to lower prices for our microinverter systems in order to compete effectively. Suppliers of solar products, particularly solar modules, have experienced eroding prices over the last several years and as a result many have faced margin compression and declining revenues. If we have to reduce our prices by more than we anticipated, or if we are unable to offset any future reductions in our average selling prices by increasing our sales volume, reducing our costs and expenses or introducing new products, our revenues and gross profit would suffer.
Competition has intensified and we expect it to continue to intensify as new and existing competitors enter the microinverter market and additional add-on components like DC to DC optimizers that can be used with central or string inverters continue to gain more traction. SMA Solar Technology AG and ABB market and sell microinverter products. We believe that a number of companies have developed or are developing microinverters and other products that will compete directly with our microinverter systems. In addition, several new entrants to the microinverter market have recently announced plans to ship or have already shipped products.
We also may face competition from some of our customers or potential customers who evaluate our capabilities against the merits of manufacturing products internally. For instance, SunPower Corporation recently acquired SolarBridge Technologies, Inc., a microinverter manufacturer selling in small volumes. Other solar module manufacturers could also develop or acquire competing inverter technology or attempt to develop components that directly perform DC to AC conversion in the module itself. Due to the fact that such customers may not seek to make a profit directly from the manufacture of these products, they may have the ability to manufacture competitive products at a lower cost than we would charge such customers. As a result, these customers or potential customers may purchase fewer of our microinverter systems or sell products that compete with our microinverters systems, which would negatively impact our revenue and gross profit.
The threat of continuing global economic, capital markets and credit disruptions, including sovereign debt issues, pose risks for our business.
The threat of continuing global economic, capital markets and credit disruptions, including the sovereign debt issues in Europe, pose risks for our business. These risks include slower economic activity and investment in projects that make use of our products and services. These economic developments, particularly decreased credit availability, have reduced demand for
solar products. The European sovereign debt crisis has caused and may continue to cause European governments to reduce, eliminate or allow to expire government subsidies and economic incentives for solar energy, which could limit our growth or cause our net sales to decline and materially and adversely affect our business, financial condition, and results of operations. These conditions, including reduced incentives, continued decreases in credit availability, as well as continued economic instability, have and may continue to adversely impact our business, financial condition and results of operations as we seek to increase our sales in Europe.
Our microinverter systems may not achieve broader market acceptance, which would prevent us from increasing our revenue and market share.
If we fail to achieve broader market acceptance of our products, there would be an adverse impact on our ability to increase our revenue, gain market share and achieve and sustain profitability. Our ability to achieve broader market acceptance for our products will be impacted by a number of factors, including:
| |
• | our ability to timely introduce and complete new designs and timely qualify and certify our products; |
| |
• | whether installers, system owners and solar financing providers will continue to adopt our microinverter systems, which is a relatively new technology with a limited history with respect to reliability and performance; |
| |
• | whether installers, system owners and solar financing providers will be willing to purchase microinverter systems from us given our limited operating history; |
| |
• | the ability of prospective system owners to obtain long-term financing for solar PV installations based on our product platform on acceptable terms or at all; |
| |
• | our ability to produce microinverter systems that compete favorably against other solutions on the basis of price, quality, reliability and performance; |
| |
• | our ability to develop products that comply with local standards and regulatory requirements, as well as potential in-country manufacturing requirements; and |
| |
• | our ability to develop and maintain successful relationships with our customers and suppliers. |
In addition, our ability to achieve increased market share will depend on our ability to increase sales to established solar installers, who have traditionally sold central or string inverters. These installers often have made substantial investments in design, installation resources and training in traditional central or string inverter systems, which may create challenges for us to achieve their adoption of our microinverter systems.
Problems with product quality or product performance may cause us to continue to incur additional warranty expenses and may damage our market reputation and cause our revenue and gross profit to decline.
We have offered 15-year limited warranties for our first and second generation microinverters and offer a limited warranty of up to 25 years on our third and fourth generation microinverters. Our limited warranties cover defects in materials and workmanship of our microinverters under normal use and service conditions for up to 25 years following installation. As a result, we bear the risk of warranty claims long after we have sold the product and recognized revenue. Our estimated costs of warranty for previously sold products may change to the extent future products are not compatible with earlier generation products under warranty.
While we offer warranties of up to 25 years, our microinverters have only been in use since mid-2008, when we first commenced commercial sales of our products. Although we conduct accelerated life cycle testing to measure performance and reliability, our microinverter systems have not been tested over the full warranty cycle and do not have a sufficient operating history to confirm how they will perform over their estimated useful life. In addition, under real-world operating conditions, which may vary by location and design, as well as insolation, soiling and weather conditions, a typical solar PV installation may perform in a different way than under standard test conditions. If our products perform below expectations or have unexpected reliability problems, we may be unable to gain or retain customers and could face substantial warranty expense.
We are required to make assumptions and apply judgments, based on our accelerated life cycle testing and the limited operating history of our products, regarding a number of factors, including the durability and reliability of our products, our anticipated rate of warranty claims and the costs of replacement of defective products. Our assumptions have proven and could in the future prove to be materially different from the actual performance of our products, which has caused and may in the future cause us to incur substantial expense to repair or replace defective products. Increases in our estimates of future
warranty obligations due to actual product failure rates, field service obligations and rework costs incurred in correcting product failures have caused and could in the future cause us to materially increase the amount of warranty obligations, and have had and may have in the future a corresponding negative impact on our results of operations.
We also depend significantly on our reputation for reliability and high-quality products and services, exceptional customer service and our brand name to attract new customers and grow our business. If our products and services do not perform as anticipated or we experience unexpected reliability problems or widespread product failures, our brand and reputation could be significantly impaired and we may lose, or be unable to gain or retain, customers.
Defects and poor performance in our products could result in loss of customers, decreased revenue and unexpected expenses, and we may face warranty, indemnity and product liability claims arising from defective products.
Our products must meet stringent quality requirements and may contain undetected errors or defects, especially when first introduced or when new generations are released. Errors, defects or poor performance can arise due to design flaws, defects in raw materials or components or manufacturing difficulties, which can affect both the quality and the yield of the product. These errors or defects may be dangerous, as defective power components may cause power overloads, potentially resulting in explosion or fire. As we develop new generations of our products and enter new markets, we face higher risk of undetected defects because our testing protocols may not be able to fully test the products under all possible operating conditions. In the past, we have experienced defects in our products due to certain errors in the manufacturing and design process. Any actual or perceived errors, defects or poor performance in our products could result in the replacement or recall of our products, shipment delays, rejection of our products, damage to our reputation, lost revenue, diversion of our engineering personnel from our product development efforts in order to address or remedy any defects and increases in customer service and support costs, all of which could have a material adverse effect on our business and operations.
Furthermore, defective, inefficient or poorly performing power components may give rise to warranty, indemnity or product liability claims against us that exceed any revenue or profit we receive from the affected products. We could incur significant costs and liabilities if we are sued and if damages are awarded against us. We currently maintain a moderate level of product liability insurance, and there can be no assurance that this insurance will provide sufficient coverage in the event of a claim. Also, we cannot predict whether we will be able to maintain this coverage on acceptable terms, if at all, or that a product liability claim would not harm our business or financial condition. Costs or payments we may make in connection with warranty and product liability claims or product recalls may adversely affect our financial condition and results of operations.
Our Enlighten web-based monitoring service, which our customers use to track and monitor the performance of their solar PV systems based on our product platform, may contain undetected errors, failures, or bugs, especially when new versions or enhancements are released. We have from time to time found defects in our service and new errors in our existing service may be detected in the future. Any errors, defects, disruptions in service or other performance problems with our monitoring service could harm our reputation and may damage our customers' businesses.
If we are unable to effectively manage our growth, our business and operating results may suffer.
We have recently experienced, and expect to continue to experience, significant growth in our sales and operations. Our historical growth has placed, and planned future growth is expected to continue to place, significant demands on our management, as well as our financial and operational resources, to:
| |
• | manage a larger organization; |
| |
• | expand third-party manufacturing, testing and distribution capacity; |
| |
• | build additional custom manufacturing test equipment; |
| |
• | manage an increasing number of relationships with customers, suppliers and other third parties; |
| |
• | increase our sales and marketing efforts; |
| |
• | train and manage a growing employee base; |
| |
• | broaden our customer support capabilities; |
| |
• | implement new and upgrade existing operational and financial systems; and |
| |
• | enhance our financial disclosure controls and procedures. |
We cannot assure you that our current and planned operations, personnel, systems, internal procedures and controls will be adequate to support our future growth. If we cannot manage our growth effectively, we may be unable to take advantage of market opportunities, execute our business strategies or respond to competitive pressures, any of which could have a material adverse effect on our financial condition, results of operation, business or prospects.
Our recent and planned expansion into new markets could subject us to additional business, financial and competitive risks.
We currently offer microinverter systems targeting the residential and commercial markets in the United States, Canada, the United Kingdom, France, the Benelux region, certain other European markets, Australia and New Zealand. We also intend to expand into other international markets and to introduce new microinverter systems targeted at larger commercial and utility-scale installations. Our success in these new geographic and product markets will depend on a number of factors, such as:
| |
• | acceptance of microinverters in markets in which they have not traditionally been used; |
| |
• | our ability to compete in new product markets to which we are not accustomed; |
| |
• | our ability to manage an increasing manufacturing capacity and production; |
| |
• | willingness of our potential customers to incur a higher upfront capital investment than may be required for competing solutions; |
| |
• | our ability to develop solutions to address the requirements of the larger commercial and utility-scale markets; |
| |
• | timely qualification and certification of new products for larger commercial and utility-scale installations; |
| |
• | our ability to reduce production costs in order to price our products competitively over time; |
| |
• | availability of government subsidies and economic incentives for solar energy solutions; |
| |
• | accurate forecasting and effective management of inventory levels in line with anticipated product demand; and |
| |
• | our customer service capabilities and responsiveness. |
Further, new geographic markets and the larger commercial and utility-scale installation markets have different characteristics from the markets in which we currently sell products, and our success will depend on our ability to properly address these differences. These differences may include:
| |
• | differing regulatory requirements, including tax laws, trade laws, labor, safety, local content, recycling and consumer protection regulations, tariffs, export quotas, customs duties or other trade restrictions; |
| |
• | limited or unfavorable intellectual property protection; |
| |
• | risk of change in international political or economic conditions; |
| |
• | restrictions on the repatriation of earnings; |
| |
• | fluctuations in the value of foreign currencies and interest rates; |
| |
• | difficulties and increased expenses in complying with a variety of U.S. and foreign laws, regulations and trade standards, including the Foreign Corrupt Practices Act; |
| |
• | potentially longer sales cycles; |
| |
• | higher volume requirements; |
| |
• | increased customer concentrations; |
| |
• | warranty expectations and product return policies; and |
| |
• | cost, performance and compatibility requirements. |
Failure to develop and introduce these new products successfully, to generate sufficient revenue from these products to offset associated research and development, marketing and manufacturing costs, or to otherwise effectively anticipate and manage the risks and challenges associated with our potential expansion into new product and geographic markets, could adversely affect our revenues and our ability to achieve or sustain profitability.
A drop in the retail price of electricity derived from the utility grid or from alternative energy sources, or a change in utility pricing structures, may harm our business, financial condition and results of operations.
We believe that a system owner's decision to purchase a solar PV system is strongly influenced by the cost of electricity generated by solar PV installations relative to the retail price of electricity from the utility grid and the cost of other renewable energy sources, including electricity from solar PV installations using central inverters. Decreases in the retail prices of electricity from the utility grid would make it more difficult for all solar PV systems to compete. In particular, growth in unconventional natural gas production and an increase in global liquefied natural gas capacity are expected to keep natural gas prices relatively low for the foreseeable future. Persistent low natural gas prices, lower prices of electricity produced from other energy sources, such as nuclear power, or improvements to the utility infrastructure could reduce the retail price of electricity from the utility grid, making the purchase of solar PV systems less economically attractive and lowering sales of our microinverter systems. In addition, energy conservation technologies and public initiatives to reduce demand for electricity also could cause a fall in the retail price of electricity from the utility grid. Moreover, technological developments by our competitors in the solar components industry, including manufacturers of central inverters and DC to DC optimizers, could allow these competitors or their partners to offer electricity at costs lower than those that can be achieved from solar PV installations based on our product platform, which could result in reduced demand for our products. Additionally, as increasing adoption of distributed generation places pressure on traditional utility business models or utility infrastructure, utilities may change their pricing structures to make installation or operation of solar distributed generation more costly. Such measures can include grid access fees, costly or lengthy interconnection studies, limitations on distributed generation penetration levels, or other measures. If the cost of electricity generated by solar PV installations incorporating our microinverter systems is high relative to the cost of electricity from other sources, our business, financial condition and results of operations may be harmed.
If we do not forecast demand for our products accurately, we may experience product shortages, delays in product shipment, excess product inventory, or difficulties in planning expenses, which will adversely affect our business and financial condition.
We manufacture our products according to our estimates of customer demand. This process requires us to make multiple forecasts and assumptions relating to the demand of our distributors, their end customers and general market conditions. Because we sell most of our products to distributors, who in turn sell to their end customers, we have limited visibility as to end-customer demand. We depend significantly on our distributors to provide us visibility into their end-customer demand, and we use these forecasts to make our own forecasts and planning decisions. If the information from our distributors turns out to be incorrect, then our own forecasts may also be inaccurate. Furthermore, we do not have long-term purchase commitments from our distributors or end customers, and our sales are generally made by purchase orders that may be canceled, changed or deferred without notice to us or penalty. As a result, it is difficult to forecast future customer demand to plan our operations.
If we overestimate demand for our products, or if purchase orders are canceled or shipments are delayed, we may have excess inventory that we cannot sell. We may have to make significant provisions for inventory write-downs based on events that are currently not known, and such provisions or any adjustments to such provisions could be material. Conversely, if we underestimate demand, we may not have sufficient inventory to meet end-customer demand, and we may lose market share, damage relationships with our distributors and end customers and forgo potential revenue opportunities. Obtaining additional supply in the face of product shortages may be costly or impossible, particularly in the short term and in light of our outsourced manufacturing processes, which could prevent us from fulfilling orders in a timely and cost efficient manner or at all. In addition, if we overestimate our production requirements, our contract manufacturers may purchase excess components and build excess inventory. If our contract manufacturers, at our request, purchase excess components that are unique to our products and are unable to recoup the costs of such excess through resale or return or build excess products, we could be required to pay for these excess parts or products and recognize related inventory write-downs.
In addition, we plan our operating expenses, including research and development expenses, hiring needs and inventory investments, in part on our estimates of customer demand and future revenue. If customer demand or revenue for a particular period is lower than we expect, we may not be able to proportionately reduce our fixed operating expenses for that period, which would harm our operating results for that period.
Ordering patterns from our distributors may cause our revenue to fluctuate significantly from period to period.
Our distributors place purchase orders with us based on their assessment of end-customer demand and their forecasts. Because these forecasts may not be accurate, channel inventory held at our distributors may fluctuate significantly due to the difference between their forecasts and actual demand. As a result, distributors adjust their purchase orders placed with us in
response to changing channel inventory levels, as well as their assessment of the latest market demand trends. We have limited visibility into future end customer demand. A significant decrease in our distributors' channel inventory in one period may lead to a significant rebuilding of channel inventory in subsequent periods, or vice versa, which may cause our quarterly revenue and operating results to fluctuate significantly. This fluctuation may cause our results to fall short of analyst or investor expectations in a certain period, which may cause our stock price to decline.
Changes in current laws or regulations or the imposition of new laws or regulations, or new interpretations thereof, by federal or state agencies or foreign governments could impair our ability to compete in international markets.
Changes in current laws or regulations applicable to us or the imposition of new laws and regulations in the United States or other jurisdictions in which we do business, such as Australia, New Zealand, Canada, France, Italy, the United Kingdom, the Benelux region and China, could materially and adversely affect our business, financial condition and results of operations. In addition, changes in our products or changes in export and import laws and implementing regulations may create delays in the introduction of new products in international markets, prevent our customers from deploying our products internationally or, in some cases, prevent the export or import of our products to certain countries altogether.
For example, the Italian energy authority (AEEG) enacted a new set of interconnection standards for solar energy installations that became effective in July 2012, which has negatively impacted our sales in Italy. We continue to explore potential solutions to meet these requirements. However, in the event that we cannot implement a solution in the near term the total market available for our microinverter products in Italy, and our business as a result, may continue to be adversely impacted.
In addition, several states or territories, including California, Hawaii and Queensland, Australia, have either implemented or are considering implementing new restrictions on incentives or rules regulating the installation of solar systems that we may not be able to currently comply with. In the event that we cannot comply with these or other new regulations or implement a solution to such noncompliance as they arise, the total market available for our microinverter products in such states, and our business as a result, may be adversely impacted.
While we are not aware of any other current or proposed export or import regulations that would materially restrict our ability to sell our products in countries where we offer our products for sale, any change in export or import regulations or related legislation, shift in approach to the enforcement or scope of existing regulations, or change in the countries, persons or technologies targeted by these regulations, could result in decreased use of our products by, or in our decreased ability to export or sell our products to, existing or potential customers with international operations. In such event, our business and results of operations could be adversely affected.
We depend upon a small number of outside contract manufacturers. Our operations could be disrupted if we encounter problems with these contract manufacturers.
We do not have internal manufacturing capabilities, and rely upon a small number of contract manufacturers to build our products. In particular, we rely on contract manufacturers for the manufacture of microinverter products, cabling and our communications gateway related to our microinverter systems. Our reliance on a small number of contract manufacturers makes us vulnerable to possible capacity constraints and reduced control over component availability, delivery schedules, manufacturing yields and costs. We do not have long-term supply contracts with our other manufacturing partners. Consequently, these manufacturers are not obligated to supply products to us for any period, in any specified quantity or at any certain price.
The revenues that our contract manufacturers generate from our orders may represent a relatively small percentage of their overall revenues. As a result, fulfilling our orders may not be considered a priority in the event of constrained ability to fulfill all of their customer obligations in a timely manner. In addition, the facilities in which the vast majority of our microinverters, related cabling and communications gateway products are manufactured are located outside of the United States. We believe that the location of these facilities outside of the United States increases supply risk, including the risk of supply interruptions or reductions in manufacturing quality or controls.
If any of our contract manufacturers were unable or unwilling to manufacture our products in required volumes and at high quality levels or renew existing terms under supply agreements, we would have to identify, qualify and select acceptable alternative contract manufacturers. An alternative contract manufacturer may not be available to us when needed or may not be in a position to satisfy our quality or production requirements on commercially reasonable terms, including price. Any significant interruption in manufacturing would require us to reduce our supply of products to our customers, which in turn
would reduce our revenues, harm our relationships with our customers and damage our relationships with our distributors and end customers and cause us to forgo potential revenue opportunities.
Manufacturing problems could result in delays in product shipments to customers and could adversely affect our revenue, competitive position and reputation.
We may experience delays, disruptions or quality control problems in our manufacturing operations. Our product development, manufacturing and testing processes are complex and require significant technological and production process expertise. Such processes involve a number of precise steps from design to production. Any change in our processes could cause one or more production errors, requiring a temporary suspension or delay in our production line until the errors can be researched, identified and properly addressed and rectified. This may occur particularly as we introduce new products, modify our engineering and production techniques, and expand our capacity. In addition, our failure to maintain appropriate quality assurance processes could result in increased product failures, loss of customers, increased production costs and delays. Any of these developments could have a material adverse effect on our business, financial condition, and results of operations.
A disruption could also occur in our manufacturing partner's fabrication facility due to any number of reasons, such as equipment failure, contaminated materials or process deviations, which could adversely impact manufacturing yields or delay product shipments. As a result, we could incur additional costs that would adversely affect our gross profit, and product shipments to our customers could be delayed beyond the shipment schedules requested by our customers, which would negatively affect our revenue, competitive position and reputation.
Additionally, manufacturing yields depend on a number of factors, including the stability and manufacturability of the product design, manufacturing improvements gained over cumulative production volumes and the quality and consistency of component parts. Capacity constraints, raw materials shortages, logistics issues, labor shortages, changes in customer requirements, manufacturing facilities or processes, or those of some third-party contract manufacturers and suppliers of raw materials and components have historically caused, and may in the future cause, reduced manufacturing yields, negatively impacting the gross profit on, and our production capacity for, those products. Moreover, an increase in the rejection and rework rate of products during the quality control process before, during or after manufacture would result in our experiencing lower yields, gross profit and production capacity.
The risks of these types of manufacturing problems are further increased during the introduction of new product lines, which has from time to time caused, and may in the future cause, temporary suspension of production lines while problems are addressed or corrected. Since our business is substantially dependent on a limited number of product lines, any prolonged or substantial suspension of manufacturing production lines could result in a material adverse effect on our revenue, gross profit, competitive position, and distributor and customer relationships.
We depend on sole source and limited source suppliers for key components and products. If we are unable to source these components on a timely basis, we will not be able to deliver our products to our customers.
We depend on sole source and limited source suppliers for key components of our products. For example, our ASICs are purchased from a sole source supplier or developed for us by sole source suppliers. Any of the sole source and limited source suppliers upon whom we rely could experience quality and reliability issues, could stop producing our components, cease operations or be acquired by, or enter into exclusive arrangements with, our competitors. We generally do not have long-term supply agreements with our suppliers, and our purchase volumes may currently be too low for us to be considered a priority customer by most of our suppliers. As a result, most of these suppliers could stop selling to us at commercially reasonable prices, or at all. Any such quality or reliability issue, or interruption or delay may force us to seek similar components or products from alternative sources, which may not be available on commercially reasonable terms, including price, or at all. Switching suppliers may require that we redesign our products to accommodate new components, and may potentially require us to re-qualify our products, which would be costly and time-consuming. Any interruption in the quality or supply of sole source or limited source components for our products would adversely affect our ability to meet scheduled product deliveries to our customers and could result in lost revenue or higher expenses and would harm our business.
If we or our contract manufacturers are unable to obtain raw materials in a timely manner or if the price of raw materials increases significantly, production time and product costs could increase, which may adversely affect our business.
The manufacturing and packaging processes used by our contract manufacturers depend on raw materials such as copper, aluminum, silicon and petroleum-based products. From time to time, suppliers may extend lead times, limit supplies or increase prices due to capacity constraints or other factors. Certain of our suppliers have the ability to pass along to us
directly or through our contract manufacturers any increases in the price of raw materials. If the prices of these raw materials rise significantly, we may be unable to pass on the increased cost to our customers. While we may from time to time enter into hedging transactions to reduce our exposure to wide fluctuations in the cost of raw materials, the availability and effectiveness of these hedging transactions may be limited. Due to all these factors, our results of operations could be adversely affected if we or our contract manufacturers are unable to obtain adequate supplies of raw materials in a timely manner or at reasonable cost. In addition, from time to time, we or our contract manufacturers may need to reject raw materials that do not meet our specifications, resulting in potential delays or declines in output. Furthermore, problems with our raw materials may give rise to compatibility or performance issues in our products, which could lead to an increase in customer returns or product warranty claims. Errors or defects may arise from raw materials supplied by third parties that are beyond our detection or control, which could lead to additional customer returns or product warranty claims that may adversely affect our business and results of operations.
If potential owners of solar PV systems based on our product platform are unable to secure financing on acceptable terms, we could experience a reduction in the demand for our solar PV systems.
Many owners of solar PV systems depend on financing to purchase their systems. The limited use of microinverters to date, coupled with our limited operating history, could result in lenders refusing to provide the financing necessary to purchase solar PV systems based on our product platform on favorable terms, or at all. Moreover, in the case of debt financed projects, even if lenders are willing to finance the purchase of these systems, an increase in interest rates or a change in tax incentives could make it difficult for owners to secure the financing necessary to purchase a solar PV system on favorable terms, or at all. In addition, we believe that a significant percentage of owners purchase solar PV systems as an investment, funding the initial capital expenditure through a combination of upfront cash and financing. Difficulties in obtaining financing for solar PV systems on favorable terms, or increases in interest rates or changes in tax incentives, could lower an investor's return on investment in a solar PV system, or make alternative solar PV systems or other investments more attractive relative to solar PV systems based on our product platform. Any of these events could result in reduced demand for our products, which could have a material adverse effect on our financial condition and results of operations. In addition, an increasing share of residential solar installations has been provided through third party financing structures, such as power purchase or lease agreements. Our sales growth therefore increasingly depends on sales to developers of third party solar finance offerings who provide solar as a service via power purchase agreements or leasing structures. The third party finance market for residential solar in the United States and elsewhere is or may become highly concentrated, with a few significant finance companies and several smaller entrants. If we are unable develop relationships and gain a significant share of inverter sales to the major finance companies or new entrants, our overall sales growth will be constrained.
We rely primarily on distributors, large installers and providers of solar financing to assist in selling our products, and the failure of these customers to perform as expected could reduce our future revenue.
We sell our microinverter systems primarily through distributors, as well as through direct sales to solar equipment installers and sales to developers of third party solar finance offerings. In 2014, Vivint Solar, Inc. and CED Greentech accounted for 24% and 16% of total net revenues, respectively. In 2013, Vivint Solar, Inc., CED Greentech and Focused Energy, Inc. accounted for 15%, 14% and 11% of total net revenues, respectively. We do not have exclusive arrangements with these third parties and, as a result, many of our customers also market and sell products from our competitors, which may reduce our sales. Our customers may terminate their relationships with us at any time, or with short notice. Our customers may fail to devote resources necessary to sell our products at the prices, in the volumes and within the time frames that we expect, or may focus their marketing and sales efforts on products of our competitors. In addition, participants in the solar industry are becoming increasingly focused on vertical integration of the solar financing and installation process, which may lead to an overall reduction in the number of potential parties who may purchase and install our products.
Our future performance depends on our ability to effectively manage our relationships with our existing customers, as well as to attract additional customers that will be able to market and support our products effectively, especially in markets in which we have not previously distributed our products. Termination of agreements with current customers, failure by these customers to perform as expected, or failure by us to cultivate new customer relationships, could hinder our ability to expand our operations and harm our revenue and operating results.
Our success in an “AC module” version of our microinverter system may depend in part upon our ability to continue to work closely with leading solar module manufacturers.
We are currently working on variants of our microinverter system that will enable an “AC module” for direct attachment of the microinverter to the solar modules. The market success of such solutions will depend in part on our ability to continue to work closely with solar module manufacturers to design solar modules that are compatible with such direct
attachment of our microinverter. We may not be able to encourage solar module manufacturers to work with us on the development of such compatible solutions combining our microinverter system and solar modules for a variety of reasons, including differences in marketing or selling strategy, competitive considerations, lack of competitive pricing, and technological compatibility. In addition, our ability to form effective partnerships with solar module manufacturers may be adversely affected by the substantial changes faced by many of these manufacturers due to declining prices and revenues from sales of solar modules.
If we fail to retain our key personnel or if we fail to attract additional qualified personnel, we may not be able to achieve our anticipated level of growth and our business could suffer.
Our future success and ability to implement our business strategy depends, in part, on our ability to attract and retain key personnel, and on the continued contributions of members of our senior management team and key technical personnel, each of whom would be difficult to replace. All of our employees, including our senior management, are free to terminate their employment relationships with us at any time. Competition for highly skilled technical people is extremely intense, and we face challenges identifying, hiring and retaining qualified personnel in many areas of our business. If we fail to retain our senior management and other key personnel or if we fail to attract additional qualified personnel, we may not be able to achieve our strategic objectives and our business could suffer.
If we fail to protect, or incur significant costs in defending, our intellectual property and other proprietary rights, our business and results of operations could be materially harmed.
Our success depends to a significant degree on our ability to protect our intellectual property and other proprietary rights. We rely on a combination of patent, trademark, copyright, trade secret and unfair competition laws, as well as confidentiality and license agreements and other contractual provisions, to establish and protect our intellectual property and other proprietary rights. We have applied for patent and trademark registrations in the United States and in certain other countries, some of which have been issued. We cannot guarantee that any of our pending applications will be approved or that our existing and future intellectual property rights will be sufficiently broad to protect our proprietary technology, and any failure to obtain such approvals or finding that our intellectual property rights are invalid or unenforceable could force us to, among other things, rebrand or re-design our affected products. In countries where we have not applied for patent protection or where effective intellectual property protection is not available to the same extent as in the United States, we may be at greater risk that our proprietary rights will be misappropriated, infringed or otherwise violated.
To protect our unregistered intellectual property, including our trade secrets and know-how, we rely in part on trade secret laws and confidentiality and invention assignment agreements with our employees and independent consultants. We also require other third parties who may have access to our proprietary technologies and information to enter into non-disclosure agreements. Such measures, however, provide only limited protection, and we cannot assure that our confidentiality and non-disclosure agreements will prevent unauthorized disclosure or use of our confidential information, especially after our employees or third parties end their employment or engagement with us, or provide us with an adequate remedy in the event of such disclosure. Furthermore, competitors or other third parties may independently discover our trade secrets, in which case we would not be able to assert trade secret rights, copy or reverse engineer our products or portions thereof or develop similar technology. If we fail to protect our intellectual property and other proprietary rights, or if such intellectual property and proprietary rights are infringed, misappropriated or otherwise violated, our business, results of operations or financial condition could be materially harmed.
In the future, we may need to take legal action to prevent third parties from infringing upon or misappropriating our intellectual property or from otherwise gaining access to our technology. Protecting and enforcing our intellectual property rights and determining their validity and scope could result in significant litigation costs and require significant time and attention from our technical and management personnel, which could significantly harm our business. In addition, we may not prevail in such proceedings. An adverse outcome of any such proceeding may reduce our competitive advantage or otherwise harm our financial condition and our business.
Third parties may assert that we are infringing upon their intellectual property rights, which could divert management's attention, cause us to incur significant costs and prevent us from selling or using the technology to which such rights relate.
Our competitors and other third parties hold numerous patents related to technology used in our industry, and claims of patent or other intellectual property right infringement or violation have been litigated against certain of our competitors. From time to time we may also be subject to such claims and litigation. Regardless of their merit, responding to such claims can be time consuming, divert management's attention and resources and may cause us to incur significant expenses. While
we believe that our products and technology do not infringe in any material respect upon any valid intellectual property rights of third parties, we cannot be certain that we would be successful in defending against any such claims. Furthermore, patent applications in the United States and most other countries are confidential for a period of time before being published, so we cannot be certain that we are not infringing third parties' patent rights or that we were the first to conceive or protect inventions covered by our patents or patent applications. As we become more visible as a publicly traded company, the possibility that third parties may make claims of intellectual property infringement or other violations against us may grow. An adverse outcome with respect to any such claim could invalidate our proprietary rights and force us to do one or more of the following:
| |
• | obtain from a third party claiming infringement a license to sell or use the relevant technology, which may not be available on reasonable terms, or at all; |
| |
• | stop manufacturing, selling, incorporating or using our products that embody the asserted intellectual property; |
| |
• | pay substantial monetary damages; |
| |
• | indemnify our customers pursuant to indemnification obligations under some of our customer contracts; or |
| |
• | expend significant resources to redesign the products that use the infringing technology and to develop or acquire non-infringing technology. |
Any of these actions could result in a substantial reduction in our revenue and could result in losses over an extended period of time.
Our failure to obtain the right to use necessary third-party intellectual property rights on reasonable terms, or our failure to maintain, and comply with the terms and conditions applicable to these rights, could harm our business and prospects.
From time to time we have licensed, and in the future we may choose to or be required to license, technology or intellectual property from third parties in connection with the development of our products. We cannot assure that such licenses will be available to us on commercially reasonable terms, or at all, and our inability to obtain such licenses could require us to substitute technology of lower quality or of greater cost. In addition, we incorporate open source software code in our proprietary software. Use of open source software can lead to greater risks than use of third-party commercial software since open source licensors generally do not provide warranties or controls with respect to origin, functionality or other features of the software. Some open source software licenses require users who distribute open source software as part of their products to publicly disclose all or part of the source code in their software and make any derivative works of the open source code available for limited fees or at no cost. Although we monitor our use of open source software, open source license terms may be ambiguous, and many of the risks associated with the use of open source software cannot be eliminated. If we were found to have inappropriately used open source software, we may be required to release our proprietary source code, re-engineer our software, discontinue the sale of certain products in the event re-engineering cannot be accomplished on a timely basis or take other remedial action. Furthermore, if we are unable to obtain or maintain licenses from third parties or fail to comply with applicable open source licenses, we may be subject to costly third party claims of intellectual property infringement or ownership of our proprietary source code. Any of the foregoing could harm our business and put us at a competitive disadvantage.
Our business has been and could continue to be affected by seasonal trends and construction cycles.
We have been and could continue to be subject to industry-specific seasonal fluctuations, particularly in climates that experience colder weather during the winter months, such as northern Europe, Canada, and the United States. In general, we expect our products in the second, third and fourth quarters will be positively affected by seasonal customer demand trends, including solar economic incentives, weather patterns and construction cycles, preceded by a seasonally softer first quarter. In the United States, customers will sometimes make purchasing decisions towards the end of the year in order to take advantage of tax credits or for budgetary reasons. In addition, construction levels are typically slower in colder months. In European countries with FiTs, the construction of solar PV systems may be concentrated during the second half of the calendar year, largely due to the annual reduction of the applicable minimum FiT and the fact that the coldest winter months are January through March. Accordingly, our business and quarterly results of operations could be affected by seasonal fluctuations in the future.
Covenants in our credit facility may limit our flexibility in responding to business opportunities and competitive developments and increase our vulnerability to adverse economic or industry conditions.
We are a party to a loan and security agreements with Wells Fargo Bank, National Association (“Wells Fargo”). The loan and security agreement with Wells Fargo restricts our ability to take certain actions such as incurring additional debt, encumbering our tangible or intangible property, paying dividends, or engaging in certain transactions, such as mergers and acquisitions, investments and asset sales. Our loan and security agreement with Wells Fargo also requires us to maintain certain financial covenants, including liquidity ratios. These restrictions may limit our flexibility in responding to business opportunities, competitive developments and adverse economic or industry conditions. In addition, our obligations under our loan and security agreement with Wells Fargo is secured by substantially all of our assets (excluding intellectual property), which limits our ability to provide collateral for additional financing. A breach of any of these covenants, or a failure to pay interest or indebtedness when due under any of our credit facilities, could result in a variety of adverse consequences, including the acceleration of our indebtedness and the forfeiture of our assets subject to security interests in favor of the lenders.
We may fail to capture customers in the new markets that we are pursuing.
We are pursuing opportunities in energy management and energy storage. We have made and will continue to make investments in our infrastructure, increased our operating costs and forgone other business opportunities in order to seek opportunities in these areas. If these new potential business segments fail to translate into revenue in the quantities or timeline projected it could have a materially adverse impact on our revenue, operating results and financial stability. In addition, we are pursuing new geographic markets. The inability to capture new customers in the high-growth geographic markets could have a material adverse effect on our business, financial condition or results of operations.
We are an “emerging growth company,” and may elect to comply with reduced public company reporting requirements applicable to emerging growth companies, which could make our common stock less attractive to investors.
We are an “emerging growth company,” as defined in the Jumpstart Our Business Startups Act enacted in April 2012, or the JOBS Act, and, for as long as we continue to be an “emerging growth company,” we may choose to take advantage of exemptions from various reporting requirements applicable to other public companies but not to “emerging growth companies,” including, but not limited to, not being required to comply with the auditor attestation requirements of Section 404 of the Sarbanes-Oxley Act of 2002, or Sarbanes-Oxley Act, reduced disclosure obligations regarding executive compensation in our periodic reports and proxy statements, and exemptions from the requirements of holding a nonbinding advisory vote on executive compensation and stockholder approval of any golden parachute payments not previously approved. We could be an “emerging growth company” until December 31, 2017 (the last day of the fiscal year following the fifth anniversary of our initial public offering), although we could cease to be an “emerging growth company” earlier if certain events occur as specified in the JOBS Act, such as our achieving annual revenue of at least $1 billion or our becoming a “large accelerated filer” as defined in Rule 12b-2 of the Exchange Act. We cannot predict if investors will find our common stock less attractive if we choose to rely on these exemptions. If some investors find our common stock less attractive as a result of any choices to reduce future disclosure, there may be a less active trading market for our common stock and our stock price may be more volatile.
If we fail to maintain an effective system of internal controls or are unable to remediate any deficiencies in our internal controls, we might not be able to report our financial results accurately or prevent fraud; in that case, our stockholders could lose confidence in our financial reporting, which would harm our business and could negatively impact the price of our stock.
Effective internal controls are necessary for us to provide reliable financial reports and prevent fraud. In addition, Section 404 of the Sarbanes-Oxley Act requires us to establish and maintain internal control over financial reporting and disclosure controls procedures. The process of implementing our internal controls and complying with Section 404 of the Sarbanes-Oxley Act has required, and will continue to require, significant attention of management. Although we are currently not required to provide an auditor’s attestation report on management’s assessment of the effectiveness of our internal control over financial reporting, otherwise required by Section 404(b) of the Sarbanes-Oxley Act, this exemption will no longer be available to us beginning with our first Annual Report on 10-K for the year in which we cease to be an “emerging growth company,” as defined in the JOBS Act. If we or our independent registered public accounting firm discover a material weakness in the future, the disclosure of that fact, even if quickly remedied, could reduce the market's confidence in our financial statements and harm our stock price. In addition, a delay in compliance with Section 404 of the Sarbanes-Oxley Act could subject us to a variety of administrative sanctions, including SEC action, ineligibility for short form resale registration, the suspension or delisting of our common stock from the stock exchange on which it is listed and
the inability of registered broker-dealers to make a market in our common stock, which would further reduce our stock price and could harm our business. To the extent any material weaknesses in our internal control over financial reporting are identified in the future, we could be required to expend significant management time and financial resources to correct such material weaknesses or to respond to any resulting regulatory investigations or proceedings
Our ability to use net operating losses to reduce future tax payments may be limited by provisions of the Internal Revenue Code, and may be subject to further limitation as a result of future transactions.
Sections 382 and 383 of the Internal Revenue Code of 1986, as amended (the “Code”), contain rules that limit the ability of a company that undergoes an “ownership change,” generally defined as a more than 50 percentage point increase in the percentage of its stock owned by certain stockholders over a three-year period, to utilize its net operating loss and tax credit carryforwards and certain built-in losses recognized in the years after the ownership change. These rules generally operate by focusing on ownership changes involving stockholders who directly or indirectly own 5% or more of the stock of a company and any change in ownership arising from a new issuance of stock by the company. Generally, if an ownership change occurs, the yearly taxable income limitation on the use of net operating loss and tax credit carryforwards is equal to the product of the applicable long-term tax exempt rate and the value of the company's stock immediately before the ownership change. If these limitations apply, we may be unable to offset our taxable income with net operating losses, or our tax liability with credits, before these losses and credits expire. We recently completed a study to assess whether an ownership change has occurred or whether there have been multiple ownership changes since we became a loss corporation under the Code. However, we do not anticipate these limitations will significantly impact our ability to utilize the net operating losses and tax credit carryforwards.
In addition, it is possible that future transactions (including issuances of new shares of our common stock and sales of shares of our common stock) will cause us to undergo one or more additional ownership changes. In that event, we generally would not be able to use our net operating losses from periods prior to this ownership change to offset future taxable income in excess of the annual limitations imposed by Sections 382 and 383 and those attributes that are already subject to limitations (as a result of our prior ownership changes) may be subject to more stringent limitations.
We may not be able to raise additional capital to execute on our current or future business opportunities on favorable terms, if at all, or without dilution to our stockholders.
We believe that our existing cash and cash equivalents, available credit facilities and cash flows from our operating activities, will be sufficient to meet our anticipated cash needs for at least the next 12 months. However, we may need to raise additional capital to execute on our current or future business strategies, including to:
| |
• | invest in our research and development efforts by hiring additional technical and other personnel; |
| |
• | expand our operations into new product markets and new geographies; |
| |
• | acquire complementary businesses, products, services or technologies; or |
| |
• | otherwise pursue our strategic plans and respond to competitive pressures. |
We do not know what forms of financing, if any, will be available to us. If financing is not available on acceptable terms, if and when needed, our ability to fund our operations, expand our research and development, sales and marketing functions, develop and enhance our products, respond to unanticipated events, including unanticipated opportunities, or otherwise respond to competitive pressures would be significantly limited. In any such event, our business, financial condition and results of operations could be materially harmed, and we may be unable to continue our operations. Moreover, if we raise additional funds through the issuance of equity or convertible debt securities, the percentage ownership of our stockholders could be significantly diluted, and these newly issued securities may have rights, preferences or privileges senior to those of existing stockholders.
Natural disasters, terrorist or cyber attacks, or other catastrophic events could harm our operations.
Our worldwide operations could be subject to natural disasters and other business disruptions, which could harm our future revenue and financial condition and increase our costs and expenses. For example, our corporate headquarters in Petaluma, California is located near major earthquake fault lines. Further, a terrorist attack, including one aimed at energy or communications infrastructure suppliers or our web-based monitoring service, could hinder or delay the development and sale or performance of our products. In the event that an earthquake, tsunami, typhoon, terrorist or cyber attack, or other natural, manmade or technical catastrophe were to destroy any part of our facilities or those of our contract manufacturer,
destroy or disrupt vital infrastructure systems or interrupt our operations or services for any extended period of time, our business, financial condition and results of operations would be materially and adversely affected.
We may be subject to disruptions or failures in information technology systems and network infrastructures that could have a material adverse effect on our business and financial condition.
We rely on the efficient and uninterrupted operation of complex information technology systems and network infrastructures to operate our business. A disruption, infiltration or failure of our information technology systems as a result of software or hardware malfunctions, system implementations or upgrades, computer viruses, cyber attacks, third-party security breaches, employee error, theft or misuse, malfeasance, power disruptions, natural disasters or accidents could cause breaches of data security, loss of intellectual property and critical data and the release and misappropriation of sensitive competitive information and partner, customer and employee personal data. We may also be subject to fraud attempts from outside parties through our electronic systems (such as “phishing” e-mail communications to our finance, technical or other personnel), which could put us at risk for harm from fraud, theft or other loss if our internal controls do not operate as intended. Any of these events could harm our competitive position, result in a loss of customer confidence, cause us to incur significant costs to remedy any damages and ultimately materially adversely affect our business and financial condition.
We are dependent on ocean transportation to deliver our products in a cost efficient manner. If we are unable to use ocean transportation to deliver our products, our business and financial condition could be materially and adversely impacted.
We rely on commercial ocean transportation for the delivery of a large percentage of our products to our customers in North America. We also rely on more expensive air transportation when ocean transportation is not available or compatible with the delivery time requirements of our customers. Our ability to deliver our products via ocean transportation could be adversely impacted by shortages in available cargo capacity, changes by carriers and transportation companies in policies and practices, such as scheduling, pricing, payment terms and frequency of service or increases in the cost of fuel, taxes and labor; and other factors, such as labor strikes and work stoppages, not within our control. If we are unable to use ocean transportation and are required to substitute more expensive air transportation, our financial condition and results of operations could be materially and adversely impacted. Recently, contentious negotiations between the Pacific Maritime Association and the International Longshore & Warehouse Union have resulted in port slowdowns which have caused port congestion and major delays in the transfer of cargo in the United States West Coast. Accordingly, we have had to ship a higher percentage of our products to our customers in North America via air transportation. Material interruptions in service or stoppages in transportation, such as the aforementioned dispute, whether caused by strike, work stoppage, lock-out, slowdown or otherwise, could materially and adversely impact our business, results of operations and financial condition.
The market price of our common stock may be volatile or may decline regardless of our operating performance.
The market price of our common stock has been and could be subject to wide fluctuations in response to, among other things, the risk factors described in “Part I. Item 1A. Risk Factors” of this Annual Report on Form 10-K, and other factors beyond our control, such as fluctuations in the valuation of companies perceived by investors to be comparable to us. Furthermore, the stock markets have experienced price and volume fluctuations that have affected and continue to affect the market prices of equity securities of many companies. These fluctuations often have been unrelated or disproportionate to the operating performance of those companies. These broad market and industry fluctuations, as well as general economic, political and market conditions, such as recessions, interest rate changes or international currency fluctuations, may negatively affect the market price of our common stock. In the past, many companies that have experienced volatility in the market price of their stock have been subject to securities class action litigation. We may become the target of this type of litigation in the future. Securities litigation against us could result in substantial costs and divert our management's attention from other business concerns, which could seriously harm our business.
Our financial results may vary significantly from quarter to quarter due to a number of factors, which may lead to volatility in our stock price.
Our quarterly revenue and results of operations have varied in the past and may continue to vary significantly from quarter to quarter. This variability may lead to volatility in our stock price as research analysts and investors respond to these quarterly fluctuations. These fluctuations are due to numerous factors, including:
| |
• | fluctuations in demand for our products; |
| |
• | the timing, volume and product mix of sales of our products, which may have different average selling prices or profit margins; |
| |
• | changes in our pricing and sales policies or the pricing and sales policies of our competitors; |
| |
• | our ability to design, manufacture and deliver products to our customers in a timely and cost-effective manner and that meet customer requirements; |
| |
• | our ability to manage our relationships with our contract manufacturers, customers and suppliers; |
| |
• | quality control or yield problems in our manufacturing operations; |
| |
• | the anticipation, announcement or introductions of new or enhanced products by our competitors and ourselves; |
| |
• | reductions in the retail price of electricity; |
| |
• | changes in laws, regulations and policies applicable to our business and products, particularly those relating to government incentives for solar energy applications; |
| |
• | unanticipated increases in costs or expenses; |
| |
• | the amount and timing of operating costs and capital expenditures related to the maintenance and expansion of our business operations; |
| |
• | the impact of government-sponsored programs on our customers; |
| |
• | our exposure to the credit risks of our customers, particularly in light of the fact that some of our customers are relatively new entrants to the solar market without long operating or credit histories; |
| |
• | our ability to estimate future warranty obligations due to product failure rates, claim rates or replacement costs; |
| |
• | our ability to forecast our customer demand and manufacturing requirements, and manage our inventory; |
| |
• | fluctuations in our gross profit; |
| |
• | our ability to predict our revenue and plan our expenses appropriately; and |
| |
• | fluctuations in foreign currency exchange rates. |
The foregoing factors are difficult to forecast, and these, as well as other factors, could materially and adversely affect our quarterly and annual results of operations. Any failure to adjust spending quickly enough to compensate for a revenue shortfall could magnify the adverse impact of this revenue shortfall on our results of operations. Moreover, our results of operations may not meet our announced guidance or the expectations of research analysts or investors, in which case the price of our common stock could decrease significantly. There can be no assurance that we will be able to successfully address these risks.
If research analysts do not publish research about our business or if they issue unfavorable commentary or downgrade our common stock, our stock price and trading volume could decline.
The trading market for our common stock depends in part on the research and reports that research analysts publish about us and our business. The price of our common stock could decline if one or more research analysts downgrade our stock or if those analysts issue other unfavorable commentary or cease publishing reports about us or our business. If one or more of the research analysts ceases coverage of our company or fails to publish reports on us regularly, demand for our common stock could decrease, which could cause our stock price or trading volume to decline.
Our affiliated stockholders, executive officers and directors own a significant percentage of our stock, and they may take actions that our stockholders may not view as beneficial.
Our affiliated stockholders, executive officers and directors own approximately 50% of our common stock. This significant concentration of share ownership may adversely affect the trading price for our common stock because investors often perceive disadvantages in owning stock in companies with controlling stockholders. Also, as a result, these stockholders, acting together, may be able to control our management and affairs and matters requiring stockholder approval, including the election of directors and approval of significant corporate transactions, such as mergers, consolidations or the sale of substantially all of our assets. Consequently, this concentration of ownership may have the effect of delaying or preventing a change in control, including a merger, consolidation or other business combination involving us, or discouraging a potential acquirer from making a tender offer or otherwise attempting to obtain control, even if this change in control would benefit our other stockholders.
Sales of a substantial number of shares of our common stock in the public market by our existing stockholders could cause our stock price to fall.
Sales of a substantial number of shares of our common stock in the public market or the perception that these sales might occur, could depress the market price of our common stock and could impair our ability to raise capital through the sale of additional equity securities. We are unable to predict the effect that sales may have on the prevailing market price of our common stock. All outstanding shares of our common stock are eligible for sale in the public market, subject in some cases to the volume limitations and manner of sale requirements of Rule 144 under the Securities Act. Sales of stock by our stockholders could have a material adverse effect on the trading price of our common stock.
Certain holders of our securities are entitled to rights with respect to the registration of their shares under the Securities Act. Registration of these shares under the Securities Act would result in the shares becoming freely tradable without restriction under the Securities Act. Any sales of securities by these stockholders could have a material adverse effect on the trading price of our common stock.
We currently do not intend to pay dividends on our common stock and, consequently, your only opportunity to achieve a return on your investment is if the price of our common stock appreciates.
We currently do not plan to declare dividends on shares of our common stock in the foreseeable future. In addition, the terms of our bank loan agreement restrict our ability to pay dividends. Consequently, an investor's only opportunity to achieve a return on its investment in our company will be if the market price of our common stock appreciates and the investor sells its shares at a profit.
Our charter documents and Delaware law could prevent a takeover that stockholders consider favorable and could also reduce the market price of our stock.
Our certificate of incorporation and our bylaws contain provisions that could delay or prevent a change in control of our company. These provisions could also make it more difficult for stockholders to elect directors and take other corporate actions, including effecting changes in our management. These provisions include:
| |
• | providing for a classified board of directors with staggered, three-year terms, which could delay the ability of stockholders to change the membership of a majority of our board of directors; |
| |
• | not providing for cumulative voting in the election of directors, which limits the ability of minority stockholders to elect director candidates; |
| |
• | authorizing our board of directors to issue, without stockholder approval, preferred stock rights senior to those of common stock, which could be used to significantly dilute the ownership of a hostile acquiror; |
| |
• | prohibiting stockholder action by written consent, which forces stockholder action to be taken at an annual or special meeting of our stockholders; |
| |
• | requiring the affirmative vote of holders of at least 66 2/3% of the voting power of all of the then outstanding shares of voting stock, voting as a single class, to amend provisions of our certificate of incorporation relating to the management of our business, our board of directors, stockholder action by written consent, advance notification of stockholder nominations and proposals, forum selection and the liability of our directors, or to amend our bylaws, which may inhibit the ability of stockholders or an acquiror to effect such amendments to facilitate changes in management or an unsolicited takeover attempt; |
| |
• | requiring special meetings of stockholders may only be called by our chairman of the board, if any, our chief executive officer, our president or a majority of our board of directors, which could delay the ability of our stockholders to force consideration of a proposal or to take action, including the removal of directors; and |
| |
• | requiring advance notification of stockholder nominations and proposals, which may discourage or deter a potential acquiror from conducting a solicitation of proxies to elect the acquiror's own slate of directors or otherwise attempting to obtain control of us. |
In addition, the provisions of Section 203 of the Delaware General Corporate Law may prohibit large stockholders, in particular those owning 15% or more of our outstanding common stock, from engaging in certain business combinations, without approval of substantially all of our stockholders, for a certain period of time.
These provisions in our certificate of incorporation, our bylaws and under Delaware law could discourage potential takeover attempts, reduce the price that investors might be willing to pay for shares of our common stock in the future and result in the market price being lower than it would be without these provisions.
Item 1B. Unresolved Staff Comments
None.
Item 2. Properties
Our corporate headquarters occupy approximately 120,000 square feet in Petaluma, California under a lease that expires in April 2022 and accommodates our principal engineering, sales, marketing, operations and finance and administrative activities. In addition to our corporate headquarters in Petaluma, as of December 31, 2014, we leased office space in Boise, Idaho, Santa Clara and Berkeley, California, the United Kingdom, France, Australia, New Zealand and China. These regional facilities total over 160,000 square feet. At this time, we believe our facilities are adequate for our near term operational and business needs.
Item 3. Legal Proceedings
From time to time, we may be involved in litigation relating to claims arising out of our operations. We are not currently involved in any material legal proceedings. We may, however, be involved in material legal proceedings in the future. Such matters are subject to uncertainty and there can be no assurance that such legal proceedings will not have a material adverse effect on our business, results of operations, financial position or cash flows.
Item 4. Mine Safety Disclosures
Not applicable.
PART II
Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities
Our common stock has been traded on The NASDAQ Global Market under the symbol “ENPH” since March 30, 2012. The following table sets forth the range of intra-day high and low sales prices per share of our common stock as reported on the NASDAQ Global Market for the periods indicated.
|
| | | | | | | |
| Price Range |
| High | | Low |
Fiscal Year 2014 | | | |
First Quarter | $ | 8.75 |
| | $ | 6.26 |
|
Second Quarter | 9.00 |
| | 6.82 |
|
Third Quarter | 17.97 |
| | 8.49 |
|
Fourth Quarter | 15.82 |
| | 9.86 |
|
| | | |
Fiscal Year 2013 | | | |
First Quarter | $ | 6.70 |
| | $ | 3.50 |
|
Second Quarter | 10.00 |
| | 5.17 |
|
Third Quarter | 8.73 |
| | 5.50 |
|
Fourth Quarter | 9.37 |
| | 4.54 |
|
Holders
As of February 28, 2015, there were approximately 44 holders of record of our common stock.
Dividend Policy
We have never paid any cash dividends on our common stock. We currently anticipate that we will retain any available funds to finance the growth and operation of our business and we do not anticipate paying any cash dividends in the foreseeable future. Certain present or future agreements may limit or prevent the payment of dividends on our common stock. For example, our credit agreement with Wells Fargo prohibits the payment of dividends.
Stock Performance Graph
This section is not “soliciting material” and is not deemed “filed” for purposes of Section 18 of the Securities and Exchange Act of 1934 (the Exchange Act) or otherwise subject to the liabilities of that section, nor shall it be deemed incorporated by reference in any filing under the Securities Act of 1933 or the Exchange Act, regardless of any general incorporation language in such filing.
The graph depicted below shows a comparison of cumulative total stockholder returns for our common stock, the Russell 2000 and the Guggenheim Solar Index for the period from March 29, 2012 (the date before our common stock began trading on the NASDAQ Global Market) to December 31, 2014. An investment of $100 is assumed to have been made in our common stock and in each index on March 29, 2012 and its relative performance is tracked through December 31, 2014. The information shown is historical and is not necessarily indicative of future performance.
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 2012 | | 2013 | | 2014 |
| 3/29 | | 6/30 | | 9/30 | | 12/31 | | 3/31 | | 6/30 | | 9/30 | | 12/31 | | 3/31 | | 6/30 | | 9/30 | | 12/31 |
Enphase Energy, Inc. | $ | 100 |
| | $ | 104 |
| | $ | 69 |
| | $ | 61 |
| | $ | 103 |
| | $ | 129 |
| | $ | 135 |
| | $ | 106 |
| | $ | 123 |
| | $ | 143 |
| | $ | 250 |
| | $ | 238 |
|
Russell 2000 Index | $ | 100 |
| | $ | 96 |
| | $ | 101 |
| | $ | 102 |
| | $ | 114 |
| | $ | 117 |
| | $ | 129 |
| | $ | 140 |
| | $ | 141 |
| | $ | 143 |
| | $ | 132 |
| | $ | 145 |
|
Guggenheim Solar Index | $ | 100 |
| | $ | 74 |
| | $ | 67 |
| | $ | 75 |
| | $ | 77 |
| | $ | 111 |
| | $ | 158 |
| | $ | 165 |
| | $ | 205 |
| | $ | 207 |
| | $ | 190 |
| | $ | 166 |
|
Item 6. Selected Consolidated Financial Data
The information set forth below for the five years ended December 31, 2014 is not necessarily indicative of results of future operations, and should be read in conjunction with Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, and the consolidated financial statements and related notes thereto included in Item 8, Consolidated Financial Statements and Supplementary Data, of this Annual Report on Form 10-K to fully understand the factors that may affect the comparability of the information presented below.
|
| | | | | | | | | | | | | | | | | | | |
| Years Ended December 31, |
| 2014 | | 2013 | | 2012 | | 2011 | | 2010 |
| (in thousands, except per share data) |
Consolidated Statement of Operations Data: | | | | | | | | | |
Net revenues | $ | 343,904 |
| | $ | 232,846 |
| | $ | 216,678 |
| | $ | 149,523 |
| | $ | 61,661 |
|
Cost of revenues | 230,861 |
| | 165,430 |
| | 161,390 |
| | 120,454 |
| | 55,159 |
|
Gross profit | 113,043 |
| | 67,416 |
| | 55,288 |
| | 29,069 |
| | 6,502 |
|
Operating expenses: | | | | | | | | | |
Research and development | 45,386 |
| | 34,524 |
| | 35,601 |
| | 25,099 |
| | 14,296 |
|
Sales and marketing | 41,003 |
| | 31,080 |
| | 25,973 |
| | 17,454 |
| | 6,558 |
|
General and administrative | 31,083 |
| | 23,970 |
| | 24,875 |
| | 15,228 |
| | 6,365 |
|
Total operating expenses | 117,472 |
| | 89,574 |
| | 86,449 |
| | 57,781 |
| | 27,219 |
|
Loss from operations | (4,429 | ) | | (22,158 | ) | | (31,161 | ) | | (28,712 | ) | | (20,717 | ) |
Other income (expense), net: | | | | | | | | | |
Interest expense | (1,863 | ) | | (2,055 | ) | | (6,436 | ) | | (3,006 | ) | | (914 | ) |
Other income (expense) | (994 | ) | | (837 | ) | | 30 |
| | (572 | ) | | (146 | ) |
Total other income (expense), net | (2,857 | ) | | (2,892 | ) | | (6,406 | ) | | (3,578 | ) | | (1,060 | ) |
Loss before income taxes | (7,286 | ) | | (25,050 | ) | | (37,567 | ) | | (32,290 | ) | | (21,777 | ) |
Provision for income taxes | (766 | ) | | (863 | ) | | (651 | ) | | — |
| | — |
|
Net loss attributable to common stockholders | $ | (8,052 | ) | | $ | (25,913 | ) | | $ | (38,218 | ) | | $ | (32,290 | ) | | $ | (21,777 | ) |
Net loss per share attributable to common stockholders, basic and diluted | $ | (0.19 | ) | | $ | (0.62 | ) | | $ | (1.24 | ) | | $ | (25.73 | ) | | $ | (28.96 | ) |
Shares used in computing net loss per share attributable to common stockholders, basic and diluted | 42,903 |
| | 41,647 |
| | 30,740 |
| | 1,255 |
| | 752 |
|
|
| | | | | | | | | | | | | | | | | | | | |
| | As of December 31, |
| | 2014 | | 2013 | | 2012 | | 2011 | | 2010 |
| | (in thousands) |
Consolidated Balance Sheet Data: | | | | | | | | | | |
Cash and cash equivalents | | $ | 42,032 |
| | $ | 38,190 |
| | $ | 45,294 |
| | $ | 51,524 |
| | $ | 39,993 |
|
Total assets | | 152,192 |
| | 116,669 |
| | 122,291 |
| | 106,242 |
| | 59,504 |
|
Debt | | — |
| | 8,677 |
| | 11,061 |
| | 14,677 |
| | 6,903 |
|
Total stockholders’ equity | | 46,952 |
| | 40,206 |
| | 56,655 |
| | 13,974 |
| | 38,481 |
|
| | | | | | | | | | |
Additional Data: | | | | | | | | | | |
Working capital | | $ | 56,190 |
| | $ | 57,144 |
| | $ | 61,143 |
| | $ | 29,417 |
| | $ | 39,753 |
|
Gross margin percentage | | 32.9 | % | | 29.0 | % | | 25.5 | % | | 19.4 | % | | 10.5 | % |
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations
Forward-Looking Statements
The following discussion and analysis of our financial condition and results of operations should be read together with our consolidated financial statements and related notes appearing elsewhere in this Annual Report on Form 10-K. This discussion contains forward-looking statements reflecting our current expectations and involves risks and uncertainties. In some cases, you can identify forward-looking statements by terminology such as “may,” “will,” “should,” “expect,” “plan,” “anticipate,” “believe,” “estimate,” “predict,” “intend,” “potential” or “continue” or the negative of these terms or other comparable terminology. For example, statements regarding our expectations as to future financial performance, expense levels and liquidity sources are forward-looking statements. Our actual results and the timing of events may differ materially from those discussed in our forward-looking statements as a result of various factors, including those discussed below and those discussed in the section entitled “Risk Factors” and elsewhere in this report.
Overview
We deliver microinverter technology for the solar industry that increases energy production, simplifies design and installation, improves system uptime and reliability, reduces fire safety risk and provides a platform for intelligent energy management. We were founded in March 2006 and have grown rapidly to become the market leader in the microinverter category. Since our first commercial shipment in mid-2008, we have sold over 7.2 million microinverters as of December 31, 2014, which represents over 1.6 gigawatt (AC) of solar PV generating capacity. We currently offer microinverter systems targeting the residential and commercial markets in the United States, Canada, the United Kingdom, France, the Benelux region, certain other European markets, Australia and New Zealand.
We sell our microinverter systems primarily to distributors who resell them to solar installers. We also sell directly to large installers and through original equipment manufacturers (“OEMs”) and strategic partners. Historically, revenues generated from the U.S. market have represented more than 80% of our total revenues, with the remainder from Canada, Europe and Asia Pacific region.
We have experienced significant revenue growth since our first commercial shipment in mid-2008. Our net revenues were $343.9 million, $232.8 million and $216.7 million for 2014, 2013 and 2012, respectively, which reflects deeper market penetration and broader acceptance of microinverter technology. We incurred net losses of $8.1 million, $25.9 million and $38.2 million for 2014, 2013 and 2012, respectively, as we continued to invest substantial resources to support the growth of our business, including marketing and developing our products, expanding into new product markets and geographies, maintaining and enhancing our research and development operations and personnel-related costs due to growth in headcount. Our full-time employee headcount has grown from 384 at December 31, 2012 to 539 at December 31, 2014.
Recent Operating Results
In 2014, we grew our revenues, improved gross margin and operating margin and improved cash flows provided by operating activities.
We grew our net revenues to $343.9 million in 2014, as compared to $232.8 million in 2013, representing an increase of $111.1 million or 48%. Our net loss was $8.1 million in 2014, as compared to a net loss of $25.9 million in 2013, representing a decrease of $17.8 million or 69%. We generated cash flows from operations of $24.2 million in 2014 compared to approximately break-even in 2013.
Components of Consolidated Statements of Operations
Net Revenues
We generate net revenues from sales of our microinverter systems, which include microinverter units, an Envoy communications gateway device, and our Enlighten web-based monitoring service. We sell to distributors, large installers, OEMs and strategic partners.
Our revenue is affected by changes in the volume and average selling prices of our microinverter systems, driven by supply and demand, sales incentives, and competitive product offerings. Our revenue growth is dependent on our ability to develop and introduce new products to meet the changing technology and performance requirements of our customers, the diversification and expansion of our revenue base, and our ability to market our products in a manner that increases awareness for microinverter technology and differentiates us in the marketplace.
Cost of Revenues and Gross Profit
Cost of revenues is comprised primarily of product costs, warranty, manufacturing personnel and logistics costs, freight costs, depreciation and amortization of test equipment and hosting services costs. Our product costs are impacted by technological innovations, such as advances in semiconductor integration and new product introductions, economies of scale resulting in lower component costs, and improvements in production processes and automation. Certain costs, primarily personnel and depreciation and amortization of test equipment, are not directly affected by sales volume.
We outsource our manufacturing to third-party contract manufacturers and generally negotiate product pricing with them on a quarterly basis. We believe our contract manufacturing partners have sufficient production capacity to meet the growing demand for our products for the foreseeable future. However, shortages in the supply of certain key raw materials could adversely affect our ability to meet customer demand for our products.
In addition, third parties, including one of our contract manufacturers, serve as our logistics providers by warehousing and delivering our products in North America, Europe, Australia and New Zealand.
Gross profit may vary from quarter to quarter and is primarily affected by our average selling prices, product cost, product mix, warranty costs (including changes in estimates) and sales volume fluctuations resulting from seasonality.
Operating Expenses
Operating expenses consist of research and development, sales and marketing and general and administrative expenses. Personnel-related costs are the most significant component of each of these expense categories and include salaries, benefits, payroll taxes, recruiting costs, sales commissions, incentive compensation and stock-based compensation. We expect personnel costs to continue to increase as we hire new employees to support our anticipated growth. We expect that each of the categories of operating expenses discussed below will increase in absolute dollars, but will decline as a percentage of total revenues in the long term.
Research and development expense includes personnel-related expenses such as salaries, incentive compensation, stock-based compensation and employee benefits. Research and development employees are engaged in the design and development of power electronics, semiconductors, powerline communications and networking and software functionality. Research and development expense also includes third-party design and development costs, testing and evaluation costs, depreciation expense and other indirect costs. We devote substantial resources in ongoing research and development programs that focus on enhancements to and cost efficiencies in our existing products and timely development of new products that utilize technological innovation to drive down product costs, improve functionality, and enhance reliability. We intend to continue to invest substantial resources in our research and development efforts because we believe they are critical to maintaining our competitive position.
Sales and marketing expense consists primarily of personnel-related expenses such as salaries, commissions, incentive compensation, stock-based compensation, employee benefits and travel. It also includes trade shows, marketing, customer support and other indirect costs. We expect to continue to make the necessary investments to enable us to execute our strategy to increase our market penetration geographically and enter into new markets by expanding our customer base of distributors, large installers, OEMs and strategic partners. Historically, substantially all of our sales have been in the United States and Canada. We began selling into France, Italy and the Benelux region in the fourth quarter of 2011 and commenced volume shipments to such regions in the second quarter of 2012. In addition, we opened a sales office in the United Kingdom during the second quarter of 2012 and began shipping products to the United Kingdom in the third quarter of 2012. In late 2013, we expanded into the Australia and New Zealand markets by opening a sales office in Australia. We expect to continue to expand the geographic reach of our product offerings and explore new sales channels in addressable markets in the future.
General and administrative expense consists primarily of salaries, incentive compensation, stock-based compensation and employee benefits for personnel related to our executive, finance, human resources, information technology and legal organizations. General and administrative expense also includes facilities costs and fees for professional services. Professional services consist primarily of outside legal, accounting and information technology consulting costs.
Other Income (Expense), Net
Other income (expense), net includes interest expense on amounts outstanding under our term loans, convertible note facility and non-cash interest expense related to the amortization of debt discounts and deferred financing costs. Other income (expense), net also includes gains or losses upon conversion of non-U.S. dollar transactions into U.S. dollars and from foreign currency forward contracts.
Provision for Income Taxes
We are subject to income taxes in the countries where we sell our products. Historically, we have primarily been subject to taxation in the United States because we have sold the vast majority of our products to customers in the United States. As we have expanded the sale of products to customers outside the United States, we have become subject to taxation based on the foreign statutory rates in the countries where these sales took place. As sales in foreign jurisdictions increase in the future, our effective tax rate may fluctuate accordingly. Due to the history of losses the Company has generated in the United States since inception, the Company believes that it is more-likely-than-not that all of its U.S. and state deferred tax assets will not be realized as of December 31, 2014.
Summary Consolidated Statements of Operations
The following table sets forth a summary of our consolidated statements of operations for the periods presented (in thousands):
|
| | | | | | | | | | | |
| Years Ended December 31, |
| 2014 | | 2013 | | 2012 |
Net revenues | $ | 343,904 |
| | $ | 232,846 |
| | $ | 216,678 |
|
Cost of revenues | 230,861 |
| | 165,430 |
| | 161,390 |
|
Gross profit | 113,043 |
| | 67,416 |
| | 55,288 |
|
Operating expenses: | | | | | |
Research and development | 45,386 |
| | 34,524 |
| | 35,601 |
|
Sales and marketing | 41,003 |
| | 31,080 |
| | 25,973 |
|
General and administrative | 31,083 |
| | 23,970 |
| | 24,875 |
|
Total operating expenses | 117,472 |
| | 89,574 |
| | 86,449 |
|
Loss from operations | (4,429 | ) | | (22,158 | ) | | (31,161 | ) |
Other expense, net | (2,857 | ) | | (2,892 | ) | | (6,406 | ) |
Loss before income taxes | (7,286 | ) | | (25,050 | ) | | (37,567 | ) |
Provision for income taxes | (766 | ) | | (863 | ) | | (651 | ) |
Net loss | $ | (8,052 | ) | | $ | (25,913 | ) | | $ | (38,218 | ) |
Comparison of 2014, 2013 and 2012
Net Revenues
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Years Ended December 31, | | Change in | | Years Ended December 31, | | Change in |
| 2014 | | 2013 | | $ | | % | | 2013 | | 2012 | | $ | | % |
| (In thousands, except percentages) | | (In thousands, except percentages) |
Net revenues | $ | 343,904 |
| | $ | 232,846 |
| | $ | 111,058 |
| | 48 | % | | $ | 232,846 |
| | $ | 216,678 |
| | $ | 16,168 |
| | 7 | % |
2014 Compared to 2013. Net revenues increased by 48% to $343.9 million in 2014, as compared to 2013. The increase in net revenues was primarily driven by sales of our fourth generation microinverter, which was launched in mid-2013, and continued strength in our core U.S. residential market. The number of microinverter units sold increased by 59% from 1,625,000 units in 2013 to 2,580,000 units in 2014. Revenues grew year-over year at a slightly slower pace than units shipped due to a decline in the average selling price, which was consistent with trends in the solar industry.
2013 Compared to 2012. Net revenues increased by 7% to $232.8 million in 2013, as compared to 2012. The increase in net revenues was primarily due to the increase in microinverter units shipped as well as a larger mix of microinverter accessories. The number of microinverter units sold increased by 8% from 1,510,000 units in 2012 to 1,625,000 units in 2013. Substantially all units shipped in both years consisted of our third generation product. Revenues grew year-over year at a slightly slower pace than units shipped due a decline in the average selling price, which was consistent with trends in the solar industry.
Cost of Revenues and Gross Margin
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Years Ended December 31, | | Change in | | Years Ended December 31, | | Change in |
| 2014 | | 2013 | | $ | | % | | 2013 | | 2012 | | $ | | % |
| (In thousands, except percentages) | | (In thousands, except percentages) |
Cost of revenues | $ | 230,861 |
| | $ | 165,430 |
| | $ | 65,431 |
| | 40 | % | | $ | 165,430 |
| | $ | 161,390 |
| | $ | 4,040 |
| | 3 | % |
Gross profit | 113,043 |
| | 67,416 |
| | 45,627 |
| | 68 | % | | 67,416 |
| | 55,288 |
| | 12,128 |
| | 22 | % |
Gross margin | 32.9 | % | | 29.0 | % | | | | | | 29.0 | % | | 25.5 | % | | | | |
2014 Compared to 2013. Cost of revenues increased by 40% in 2014, as compared to 2013, while net revenues increased by 48%. The increase in cost of revenues was primarily due to an increase in the number of microinverter units sold to customers, consistent with the overall increase in net revenues as described above. Gross margin increased by 3.9 percentage points to 32.9% in 2014, as compared to 29.0% in 2013. Contributing to the increase was a larger proportion of sales from our higher-margin fourth generation microinverters sold in 2014 as compared to 2013. Also contributing to the increase in gross margin was lower warranty expense in 2014 as compared to 2013. Warranty expense, as a percentage of net revenues, decreased from 7.1% in 2013 to 3.6% in 2014 primarily due to a decrease in incremental provisions (as a percentage of net revenues) for changes in estimates. In 2014, incremental provisions for changes in estimates represented 2.4% of net revenues, as compared to 4.4% in 2013. In addition, our election to measure warranty obligations related to microinverters sold since January 1, 2014 at fair value improved gross margin by 1.5 percentage points. See Note 7, “Warranty Obligations” to the consolidated financial statements for further discussion.
2013 Compared to 2012. Cost of revenues increased by 3% in 2013, as compared to 2012, while net revenues increased by 7 %. The increase in cost of revenues was primarily due to an increase in the number of microinverter units sold to customers, consistent with the overall increase in net revenues as described above. Gross margin increased by 3.5 percentage points to 29.0% in 2013, as compared to 25.5% in 2012, primarily due to a lower cost per microinverter unit and larger mix of sales from microinverter accessories. While our third generation product represented substantially all of 2013 and 2012 sales, we were able to achieve lower per unit costs in 2013, as compared to 2012, due to production efficiencies gained through experience with the manufacturing process, which had a favorable impact on gross margin. Costs of revenues in 2013 and 2012 included warranty expense of $10.3 million and $7.6 million, respectively, resulting from net changes in estimates, which reduced gross margin by approximately 4.4 and 3.5 percentage points, respectively. See Note 7, “Warranty Obligations” to the consolidated financial statements for further discussion.
Research and Development
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Years Ended December 31, | | Change in | | Years Ended December 31, | | Change in |
| 2014 | | 2013 | | $ | | % | | 2013 | | 2012 | | $ | | % |
| (In thousands, except percentages) | | (In thousands, except percentages) |
Research and development | $ | 45,386 |
| | $ | 34,524 |
| | $ | 10,862 |
| | 31 | % | | $ | 34,524 |
| | $ | 35,601 |
| | $ | (1,077 | ) | | (3 | )% |
Percentage of net revenues | 13 | % | | 15 | % | | | | | | 15 | % | | 16 | % | | | | |
2014 Compared to 2013. Research and development expenses increased by $10.9 million in 2014 as compared to 2013. This increase was primarily due to a 29% increase in research and development headcount, which resulted in increased expense of $7.2 million from salaries, incentive compensation and stock-based compensation. In addition, there was an increase in outside contract services of $3.0 million to support the development of our next generation microinverter system. The remaining increase of $0.5 million was attributed to higher depreciation and amortization related to research and development equipment.
2013 Compared to 2012. Research and development expenses decreased by $1.1 million in 2013 as compared to 2012, primarily due to a $1.6 million decrease in outside contract services, offset by a $0.3 million increase in depreciation and amortization related to research and development equipment and a $0.2 million increase in personnel-related costs.
Sales and Marketing
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Years Ended December 31, | | Change in | | Years Ended December 31, | | Change in |
| 2014 | | 2013 | | $ | | % | | 2013 | | 2012 | | $ | | % |
| (In thousands, except percentages) | | (In thousands, except percentages) |
Sales and marketing | $ | 41,003 |
| | $ | 31,080 |
| | $ | 9,923 |
| | 32 | % | | $ | 31,080 |
| | $ | 25,973 |
| | $ | 5,107 |
| | 20 | % |
Percentage of net revenues | 12 | % | | 13 | % | | | | | | 13 | % | | 12 | % | | | | |
2014 Compared to 2013. Sales and marketing expenses increased by $9.9 million in 2014 as compared to 2013. This increase was primarily due to a 30% increase in sales and marketing headcount, which resulted in increased expense of $9.1 million from salaries, incentive compensation and stock-based compensation. In addition, increased marketing activities mostly from trade shows and use of outside consultants contributed $1.3 million to the increase. The increase was partially offset by $0.5 million in bad debt recoveries.
2013 Compared to 2012. Sales and marketing expenses increased by $5.1 million in 2013 as compared to 2012, primarily due to increases in customer service headcount and operations in domestic and international markets. Personnel-related costs increased by $4.0 million, which included a $0.6 million increase in non-cash stock-based compensation. Costs associated with establishing our presence in Australia contributed an additional $1.8 million to the increase in 2013. The increase was partially offset by a decrease in marketing expenses primarily attributable to lower expenditures on trade shows of $0.6 million.
General and Administrative
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Years Ended December 31, | | Change in | | Years Ended December 31, | | Change in |
| 2014 | | 2013 | | $ | | % | | 2013 | | 2012 | | $ | | % |
| (In thousands, except percentages) | | (In thousands, except percentages) |
General and administrative | $ | 31,083 |
| | $ | 23,970 |
| | $ | 7,113 |
| | 30 | % | | $ | 23,970 |
| | $ | 24,875 |
| | $ | (905 | ) | | (4 | )% |
Percentage of net revenues | 9 | % | | 10 | % | | | | | | 10 | % | | 11 | % | | | | |
2014 Compared to 2013. General and administrative expenses increased by $7.1 million in 2014 as compared to 2013. This increase was primarily due to an increase in personnel-related costs of $4.6 million related to modest headcount growth and increases in incentive and stock-based compensation for existing employees. In addition, an increase in the use of outside consultants including advisory services for our secondary offering and acquisition contributed $1.6 million to the increase. The remaining increase was attributable to facilities-related costs, information technology costs and other general corporate expenses.
2013 Compared to 2012. General and administrative expenses decreased by $0.9 million in 2013 as compared to 2012, primarily as a result of decreased use of outside consultants and professional services.
Other Income (Expense), Net
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Years Ended December 31, | | Change in | | Years Ended December 31, | | Change in |
| 2014 | | 2013 | | $ | | % | | 2013 | | 2012 | | $ | | % |
| (In thousands, except percentages) | | (In thousands, except percentages) |
Other income (expense), net | $ | (2,857 | ) | | $ | (2,892 | ) | | $ | 35 |
| | 1 | % | | $ | (2,892 | ) | | $ | (6,406 | ) | | $ | 3,514 |
| | 55 | % |
2014 Compared to 2013. Other expense remained flat at $2.9 million in 2014 and 2013, respectively, and primarily consisted of interest expense and foreign currency transaction losses. In December 2014, we recorded $0.3 million of interest expense related to the write-off of deferred financing costs and the unaccrued portion of the end of term fee in connection with the voluntary prepayment of our term loan with Hercules Technology Growth Capital, Inc.
2013 Compared to 2012. Other expense decreased by $3.5 million in 2013 as compared to 2012. The decrease was primarily attributable to the $2.8 million charge recorded as interest expense in 2012 upon conversion of our convertible facility at our IPO. In addition, interest expense related to outstanding debt balances was lower in 2013, as compared to 2012, due to lower average debt levels.
Liquidity and Capital Resources
As of December 31, 2014, we had $42.0 million in cash and cash equivalents and no debt. Cash and cash equivalents held in the United States were $37.0 million and consisted primarily of non-interest bearing checking deposits, with the remainder held in various foreign subsidiaries.
The following table summarizes our cash flows for the periods presented (in thousands):
|
| | | | | | | | | | | |
| Year Ended December 31, |
| 2014 | | 2013 | | 2012 |
Net cash provided by (used in) operating activities | $ | 24,222 |
| | $ | (872 | ) | | $ | (44,645 | ) |
Net cash used in investing activities | (16,534 | ) | | (6,257 | ) | | (12,990 | ) |
Net cash (used in) provided by financing activities | (3,342 | ) | | (58 | ) | | 51,436 |
|
Cash Flows from Operating Activities
For 2014, net cash provided by operating activities was $24.2 million. Our net loss of $8.1 million was more than offset by non-cash charges and net changes in operating assets and liabilities. Non-cash charges included $9.7 million of stock-based compensation, $8.3 million of depreciation and amortization and $1.4 million of other non-cash charges. In addition, cash provided by net changes in operating assets and liabilities was $12.8 million.
Sources of cash totaled $34.1 million resulting from an increase of $25.3 million in accounts payable, accrued and other liabilities, an increase of $5.3 million in deferred revenues and an increase of $3.5 million in warranty obligations. The increases in accounts payable, deferred revenues and warranty obligations were primarily attributable to higher sales volume and inventory purchases. Accrued and other liabilities increased primarily due to amounts due under our annual incentive compensation plan.
Uses of cash included a $13.7 million increase in accounts receivable, a $5.0 million increase in inventory and a $2.5 million increase in prepaid expenses and other assets. The increases were primarily attributable to higher sales volume and higher inventory requirements to support anticipated year-over-year sales growth in the first quarter of 2015.
For 2013, net cash used in operating activities was $0.9 million. Our net loss of $25.9 million was substantially offset by non-cash charges and net changes in operating assets and liabilities. Non-cash items included $7.0 million of depreciation and amortization, $6.9 million of stock-based compensation, a provision for doubtful accounts of $0.7 million and $0.4 million of non-cash interest expense. In addition, cash provided by net changes in operating assets and liabilities was $10.0 million.
For 2012, net cash used in operating activities was $44.6 million primarily resulting from a net loss of $38.2 million. The net loss was partially offset by non-cash items including, depreciation and amortization of $5.6 million, stock-based compensation of $4.8 million and interest expense of $4.8 million. In addition, the effect of changes in net operating assets and liabilities resulted in the use of cash totaling $22.2 million.
Cash Flows from Investing Activities
Net cash used in investing activities primarily relates to capital expenditures to support our growth.
For 2014, net cash used in investing activities of $16.5 million included purchases of test and assembly equipment and the development of software for internal use. In addition, we acquired substantially all of the assets of Next Phase Solar, Inc. (“NPS”) for an initial cash consideration of $2.5 million, which includes $0.3 million being held back to cover indemnification obligations of the selling party and recorded as restricted cash. In a separate transaction, we purchased certain patents related to system interconnection and photovoltaic AC module construction for $0.8 million.
For 2013, net cash used in investing activities of $6.3 million included purchases of test and assembly equipment and the development of software for internal use.
For 2012, net cash used in investing activities of $13.0 million included purchases of test equipment and expenditures on leasehold improvements and furniture and fixtures in connection with our relocation to a new headquarter facility.
Cash Flows from Financing Activities
For 2014, net cash used in financing activities consisted of $8.7 million related to repayment of all outstanding principal under our term loan and equipment financing facility, offset by $5.4 million received from common stock issuance pursuant to our equity incentive plans.
For 2013, net cash used by financing activities was insignificant. Cash received from common stock issuance pursuant to our equity incentive plans was $2.4 million. These inflows of cash were offset by principal repayments of term loans of $2.4 million.
For 2012, net cash provided by financing activities primarily consisted of net proceeds of $56.4 million received from our IPO, after deducting underwriting discounts and commissions and other offering costs paid during 2012. Cash used in financing activities consisted of $14.1 million in principal repayments of term loans and $1.0 million in financing costs associated with entering into new credit facilities in November 2012. This was partially offset by $10.0 million in proceeds from term loan borrowings.
Debt and Revolving Credit Facility
We ended 2014 with no debt and $42.0 million of cash and cash equivalents. As of and for the year ended December 31, 2014, we were in compliance with all financial and non-financial covenants under our credit facility.
Revolving Credit Facility
We have a $50.0 million revolving credit facility (the “Revolver”) with Wells Fargo Bank, N.A. (“Wells Fargo”) that was entered into in November 2012 and subsequently amended in February 2014 to extend the maturity date to November 2016. The amount of loans available to be drawn under the Revolver is subject to a borrowing base calculation that limits availability to a percentage of eligible domestic accounts receivable plus a percentage of the value of eligible domestic inventory, less certain reserves. Loans under the Revolver bear interest in cash at an annual rate equal to, at our option, either LIBOR or a “base rate” that is comprised of, among other things, the prime rate, plus a margin that is between 1.5% and 4.25% depending on the currency borrowed and the specific term of repayment. The Revolver contains customary affirmative and negative covenants and events of default, and requires us to maintain at least $15.0 million of liquidity at all times, of which at least $5.0 million must be undrawn availability. To date, we have not drawn on the Revolver and approximately $37.6 million was available for borrowing as of December 31, 2014 based on eligible accounts receivable and inventory balances pursuant to the agreement.
Full Repayment of Term Loan
On November 7, 2012, we entered into a Loan and Security Agreement (“Loan Agreement”) with Hercules Technology Growth Capital, Inc. (“Hercules”) and made an initial draw of $7.4 million. In addition, the Loan Agreement provided $15.6 million in additional borrowing capacity, which expired undrawn on March 31, 2014. Borrowings under the Loan Agreement bore interest at an annual rate equal to the higher of (i) the prime rate plus 8.25% or (b) 11.5%. Payments for the first 15 months were for interest-only and equal monthly payments thereafter through the maturity date of August 1, 2016 were for interest and principal. The Loan Agreement included a fixed $0.6 million back-end fee due on the earlier of prepayment in full or upon expiration of the Loan Agreement. Borrowings under the Loan Agreement were secured by a pledge of substantially all of our assets other than intellectual property. The Loan Agreement did not include any financial covenants.
On December 8, 2014, we repaid all of the $5.8 million in outstanding indebtedness including accrued interest and related fees thereon and terminated the Loan Agreement, which was scheduled to mature on August 1, 2016.
Full Repayment of Equipment Financing Facility
On June 13, 2011, we entered into a $5.0 million equipment financing facility with Hercules with a three year term. Borrowings under the equipment financing facility had a variable interest rate set at the higher of 5.75% above the prime lending rate and 9.0% annually. Borrowings were secured by the financed equipment and restricts our ability to pay dividends and take on certain types of additional liens. On July 1, 2014, the equipment financing facility expired in accordance with its terms and all remaining amounts outstanding were repaid in full.
Operating and Capital Expenditure Requirements
Our future capital requirements may vary materially in the future and will depend on many factors, including, but not limited to, our rate of revenue growth, the expansion of our sales and marketing activities and the timing and extent of spending to support product development efforts and other costs necessary to support our strategy.
We believe our current cash and cash equivalents of $42.0 million as of December 31, 2014, together with borrowings expected to be available under our Revolver with Wells Fargo, will be adequate to fund our planned capital expenditures and working capital requirements over the next 12 months.
If additional sources of liquidity were needed, we may consider new debt or equity offerings, but there is no assurance that such transactions could be consummated on acceptable terms or at all. Failure to raise sufficient capital when needed could have a material adverse effect on our business, results of operations and financial position.
Contractual Obligations
The following table summarizes our outstanding contractual obligations as of December 31, 2014:
|
| | | | | | | | | | | | | | | | | | | |
| Payments Due by Period |
| Total | | Less Than 1 Year | | 1-3 Years | | 4-5 Years | | More Than 5 Years |
| (in thousands) |
Operating leases | 15,074 |
| | 1,980 |
| | 4,038 |
| | 4,005 |
| | 5,051 |
|
Purchase commitments under agreements (1) | 36,804 |
| | 36,804 |
| | — |
| | — |
| | — |
|
Total | $ | 51,878 |
| | $ | 38,784 |
| | $ | 4,038 |
| | $ | 4,005 |
| | $ | 5,051 |
|
| |
(1) | Represents amounts associated with our contract manufacturers that are non-cancelable. Such purchase commitments are based on our forecasted manufacturing requirements and typically provide for fulfillment within agreed upon lead-times and/or commercially standard lead-times for the particular part or product. The timing and amount of payments represent our best estimate and may change due to changing business needs and other factors. Obligations under contracts that we can cancel without a significant penalty are not included in the table above. |
We have a contingent consideration arrangement which requires us to pay additional cash payments to the selling party of our business acquisition based on certain defined 2015 and 2016 revenue targets. The fair value of the contingent consideration arrangement at December 31, 2014 was $2.3 million. Amounts are payable in early 2016 and 2017. Depending on the attainment of the specified targets, the potential payment for each year ranges from zero to $2.8 million. As a result, the contingent consideration arrangement has not been included in the table above.
As of December 31, 2014, the liability recorded for uncertain tax positions, including associated interest and penalties, was approximately $0.7 million. Since the ultimate amount and timing of cash settlements cannot be predicted due to the high degree of uncertainty, liabilities for uncertain tax positions are excluded from the contractual obligations table. See Note 13, “Income Taxes” to the consolidated financial statements.
Off-Balance Sheet Arrangements
As of December 31, 2014 , we did not have any off-balance-sheet arrangements as defined in Item 303(a)(4)(ii) of Regulation S-K.
Critical Accounting Policies
The preparation of our consolidated financial statements and related notes requires us to make judgments, estimates and assumptions that affect the reported amounts of assets, liabilities, revenue and expenses, and related disclosure of contingent assets and liabilities. We have based our estimates on historical experience and on various other assumptions that are believed to be reasonable under the circumstances, the results of which form the basis for making judgments about the
carrying values of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates under different assumptions or conditions.
For a description of our significant accounting policies, see Note 2, “Summary of Significant Accounting Policies” to our consolidated financial statements. An accounting policy is considered to be critical if it requires an accounting estimate to be made based on assumptions about matters that are highly uncertain at the time the estimate is made, and if different estimates that reasonably could have been used, or changes in the accounting estimates that are reasonably likely to occur periodically, could materially impact the consolidated financial statements. We believe the following critical accounting policies reflect the more significant estimates and assumptions used in the preparation of our consolidated financial statements.
Revenue Recognition
We generate revenue from sales of our microinverter systems, which include microinverter units and related accessories, an Envoy communications gateway device, and an Enlighten web-based monitoring service, to distributors, large installers, OEMs and strategic partners. Enlighten service revenue represented less than 1% of the total revenues for all periods presented.
Revenues from sales of microinverters and related accessories, and communication gateways are recognized when: (i) persuasive evidence of an arrangement exists; (ii) delivery of the products has occurred in accordance with the terms of the sales agreement and title and risk of loss have passed to the customer; (iii) the sale price is fixed or determinable; and (iv) collection is reasonably assured. Provisions for rebates, sales incentives, and discounts to customers are accounted for as reductions in revenue in the same period the related sales are recorded.
Sales of an Envoy communications gateway device include the Enlighten web-based monitoring service. The allocation of revenue between the two deliverables is based on our best estimate of selling price determined by considering multiple factors including, internal costs, gross margin and historical pricing practices. After allocating the overall consideration from such sale to each deliverable using a best estimate of the selling price, (i) revenue from the sale of Envoy devices is recognized upon shipment, assuming all other revenue recognition criteria have been met and (ii) revenue from the web-based monitoring service is recognized ratably over the estimated economic life of the related Envoy devices of 10 years.
Inventory
Inventory is valued at the lower of cost or market. We determine cost on a first-in first-out basis. Certain factors could affect the realizable value of its inventory, including customer demand and market conditions. Management assesses the valuation on a quarterly basis and writes down the value for any excess and obsolete inventory based upon expected demand, anticipated sales price, effect of new product introductions, product obsolescence, customer concentrations, product merchantability and other factors. Inventory write-downs are equal to the difference between the cost of inventories and their estimated net realizable market value. In 2014 and 2013, write-downs of inventories were insignificant. In 2012, we recorded write-downs of inventories of $0.8 million.
Business Combinations
We allocate the fair value of purchase consideration to the tangible and intangible assets acquired, and liabilities assumed based on their estimated fair values at the acquisition date. We use judgment to estimate the fair value of contingent consideration (a component of the purchase consideration), identify all the tangible and intangible assets acquired, estimate the fair value of these assets, estimate the useful life of the assets, and assess the appropriate method for recognizing depreciation or amortization expense over the asset’s useful life. We believe that the accounting estimates related to purchase price allocations are critical accounting estimates because the assumptions impact the amounts and classifications of assets and liabilities presented in our consolidated balance sheets, the future amount of amortization and depreciation expense that will be recorded in our consolidated statements of operations, and the amount of goodwill which will be subject to impairment testing performed in subsequent periods. Critical estimates in valuing contingent consideration include but are not limited to probabilities applied to multiple payout scenarios and a risk-adjusted discount rate. Critical estimates in valuing intangible assets (i.e. customer relationships) include but are not limited to future expected cash flows from customer relationships and customer attrition rates. Management’s estimates of fair value are based upon assumptions believed to be reasonable, but which are inherently uncertain and unpredictable and, as a result, actual results may differ from estimates.
Warranty Obligations
Microinverters Sold Through December 31, 2013
Our warranty accrual provides for the replacement of microinverter units that fail during the product’s warranty term (15 years for first and second generation microinverters and up to 25 years for third and fourth generation microinverters). On a quarterly basis, we employ a consistent, systematic and rational methodology to assess the adequacy of its warranty liability. This assessment includes updating all key estimates and assumptions for each generation of product, based on historical results, trends and the most current data available as of the filing date. The key estimates and assumptions used in the warranty liability are thoroughly reviewed by management on a quarterly basis. The key estimates used by us to estimate its warranty liability are: (1) the number of units expected to fail over time (i.e. failure rate); (2) the number of failed units expected to result in warranty claims over time (i.e. claim rate); and (3) the per unit cost of replacement units, including outbound shipping and limited labor costs, expected to be incurred to replace failed units over time (i.e. replacement cost).
Estimated Failure Rates—Our Quality and Reliability department has primary responsibility to determine the estimated failure rates for each generation of microinverter. To establish initial failure rate estimates for each generation of microinverter, our quality engineers use a combination of industry standard MTBF (Mean Time Between Failure) estimates for individual components contained in its microinverters, third party data collected on similar equipment deployed in outdoor environments similar to those in which our microinverters are installed, and rigorous long term reliability and accelerated life cycle testing which simulates the service life of the microinverter in a short period of time. As units are deployed into operating environments, we continue to monitor product performance via our Enlighten monitoring platform. It typically takes three to nine months between the date of sale and date of end-user installation. Consequently, our ability to monitor actual failures of units sold similarly lags by three to nine months. When a microinverter fails and is returned, we performs diagnostic root cause failure analysis to understand and isolate the underlying mechanism(s) causing the failure. We then use the results of this analysis (combined with the actual, cumulative performance data collected on those units prior to failure via Enlighten) to draw conclusions with respect to how or if the identified failure mechanism(s) will impact the remaining units deployed in the installed base.
Estimated Claim Rates—Warranty claim rate estimates are based upon assumptions with respect to expected customer behavior over the warranty period. As the vast majority of our microinverters have been sold to end users for residential applications, we believe that warranty claim rates will be affected by changes over time in residential home ownership because we expect that subsequent homeowners are less likely to file claims than the homeowners who originally purchase the microinverters.
Estimated Replacement Costs—Three factors are considered in our analysis of estimated replacement cost: (1) the estimated cost of replacement microinverters; (2) the estimated cost to ship replacement microinverters to end users; and (3) the estimated labor reimbursement expected to be paid to third party installers performing replacement services for the end user. Because our warranty provides for the replacement of defective microinverters over long periods of time (either 15 or 25 years, depending on the generation of product purchased), the estimated per unit cost of current and future product generations is considered in the estimated replacement cost. Estimated costs to ship replacement units are based on observable, market-based shipping costs paid by us to third party freight carriers. We have a separate program that allows third-party installers to claim fixed-dollar reimbursements for labor costs they incur to replace failed microinverter units for a limited time from the date of original installation. Included in our estimated replacement cost is an analysis of the number of fixed-dollar labor reimbursements expected to be claimed by third party installers over the limited offering period.
If actual failure rates, claim rates, or replacement costs differ from our estimates in future periods, changes to these estimates would be required, resulting in increases or decreases in our warranty obligations. Such increases or decreases could be material.
Fair Value Option for Microinverters Sold Since January 1, 2014
Our warranty obligations related to microinverters sold since January 1, 2014 provide us the right, but not the requirement, to assign our warranty obligations to a third-party. Under Accounting Standards Codification (“ASC”) 825—Financial Instruments, (“fair value option”), an entity may choose to elect the fair value option for such warranties at the time it first recognizes the eligible item. We made an irrevocable election to account for all eligible warranty obligations associated with microinverters sold since January 1, 2014 at fair value. This election was made to reflect the underlying economics of the time value of money for an obligation that will be settled over an extended period of up to 25 years.
We estimate the fair value of warranty obligations by calculating the warranty obligations in the same manner as for sales prior to January 1, 2014 and applying an expected present value technique to that result. The expected present value technique, an income approach, converts future amounts into a single current discounted amount. In addition to the key estimates of failure rates, claim rates and replacement costs, we used certain inputs that are unobservable and significant to the overall fair value measurement. Such additional assumptions included compensation comprised of a profit element and risk premium required of a market participant to assume the obligation and a discount rate based on our credit-adjusted risk-free rate. See Note 8, (“Fair Value Measurements”) to the consolidated financial statements for additional information.
Recent Accounting Pronouncements Not Yet Effective
In May 2014, the Financial Accounting Standards Board (“FASB”) issued Accounting Standards Update (“ASU”) No. 2014-09 (Topic 606), Revenue from Contracts with Customers, which will replace most existing revenue recognition guidance under US GAAP. The updated standard’s core principle is that revenue is recognized when promised goods or services are transferred to customers in an amount that reflects the consideration to which an entity expects to be entitled in exchange for those goods or services. The standard generally requires an entity to identify performance obligations in its contracts, estimate the amount of variable consideration to be received in the transaction price, allocate the transaction price to each separate performance obligation, and recognize revenue as obligations are satisfied. In addition, the updated standard requires additional disclosure about the nature, amount, timing and uncertainty of revenue and cash flows arising from customer contracts. ASU 2014-09 is effective for annual and interim periods beginning after December 15, 2016. Early adoption is not permitted. Accordingly, the ASU will be effective for us beginning in the first quarter of 2017. We are currently evaluating the impact of the adoption on its consolidated financial statements.
No other new accounting pronouncement issued or effective in 2014 had or is expected to have a material impact on the consolidated financial statements.
Item 7A. Quantitative and Qualitative Disclosures about Market Risk
Foreign Currency Exchange Risk
We operate and conduct business in foreign countries where our foreign entities use the local currency as their respective functional currency and, as a result, are exposed to movements in foreign currency exchange rates. More specifically, we face foreign currency exposure from the effect of fluctuating exchange rates on payables and receivables relating to transactions that are denominated in Euros, British Pounds and Australian and New Zealand Dollars. These payables and receivables primarily arise from sales to customers and intercompany transactions. We also face currency exposure that arises from translating the results of our European, Australian and New Zealand operations, including sales and marketing and research and development expenses, to the U.S. dollar at exchange rates that have fluctuated from the beginning of a reporting period.
We utilize foreign currency forward contracts to reduce the impact of foreign currency fluctuations related to anticipated cash receipts from expected future revenues denominated in Euros and intercompany transaction gains or losses. The contracts we enter into typically have maturities of less than one year. We do not enter into derivative financial instruments for trading or speculative purposes. The foreign currency forward contracts are accounted for as derivatives whereby the fair value of the contracts is reported as other current assets or current liabilities in the accompanying consolidated balance sheets, and gains and losses resulting from changes in the fair value are reported in other income (expense), net, in the accompanying consolidated statements of operations.
The following table presents the fair values of our outstanding foreign currency forward contracts at December 31, 2014 and 2013 (in thousands):
|
| | | | | | | | |
| | December 31, 2014 | | December 31, 2013 |
Assets: | | | | |
Foreign currency forward contracts | | $ | 76 |
| | $ | 325 |
|
| | | | |
Liabilities: | | | | |
Foreign currency forward contracts | | $ | — |
| | $ | 605 |
|
As of December 31, 2014 and 2013, the aggregate gross notional amounts of outstanding foreign currency forward contracts, all with maturities of less than one year, were $1.5 million and $12.5 million, respectively. We recorded $0.3 million of net gains in 2014 and $0.4 million and $0.5 million of net losses in 2013 and 2012, respectively, related to foreign currency forward contracts.
The foreign currency exchange rate risk associated with our forward currency exchange contracts is limited as the exposure is substantially offset by exchange rate changes of the underlying hedged amounts. All outstanding open forward contracts at December 31, 2014 have maturities of less than one year.
Item 8. Financial Statements and Supplementary Data
ENPHASE ENERGY, INC.
INDEX TO CONSOLIDATED FINANCIAL STATEMENTS AS OF
DECEMBER 31, 2014 AND 2013, AND FOR THE YEARS ENDED
DECEMBER 31, 2014, 2013 AND 2012
|
| |
| Page |
Report of Independent Registered Public Accounting Firm | |
Consolidated Balance Sheets | |
Consolidated Statements of Operations | |
Consolidated Statements of Comprehensive Loss | |
Consolidated Statements of Stockholders’ Equity | |
Consolidated Statements of Cash Flows | |
Notes to Consolidated Financial Statements | |
| |
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To the Board of Directors and Stockholders of Enphase Energy, Inc.:
We have audited the accompanying consolidated balance sheets of Enphase Energy, Inc. and subsidiaries (the “Company”) as of December 31, 2014 and 2013, and the related consolidated statements of operations, comprehensive loss, stockholders’ equity, and cash flows for each of the three years in the period ended December 31, 2014. These financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on these consolidated financial statements based on our audits.
We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. Our audit includes consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company’s internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.
In our opinion, such consolidated financial statements present fairly, in all material respects, the financial position of Enphase Energy, Inc. and subsidiaries as of December 31, 2014 and 2013, and the results of their operations and their cash flows for each of the three years in the period ended December 31, 2014, in conformity with accounting principles generally accepted in the United States of America.
/s/ Deloitte & Touche LLP
San Jose, California
March 3, 2015
ENPHASE ENERGY, INC. Consolidated Balance Sheets (In thousands, except par value) |
| | | | | | | |
| December 31, |
| 2014 | | 2013 |
ASSETS | | | |
Current assets: | | | |
Cash and cash equivalents | $ | 42,032 |
| | $ | 38,190 |
|
Accounts receivable, net of allowances of $569 and $2,000 at December 31, 2014 and 2013, respectively | 45,119 |
| | 32,084 |
|
Inventory | 21,590 |
| | 16,580 |
|
Prepaid expenses and other | 6,155 |
| | 3,655 |
|
Total current assets | 114,896 |
| | 90,509 |
|
Property and equipment, net | 30,824 |
| | 24,853 |
|
Goodwill | 3,745 |
| | — |
|
Intangibles, net | 1,811 |
| | 286 |
|
Other assets | 916 |
| | 1,021 |
|
Total assets | $ | 152,192 |
| | $ | 116,669 |
|
LIABILITIES AND STOCKHOLDERS’ EQUITY | | | |
Current liabilities: | | | |
Accounts payable | $ | 22,316 |
| | $ | 7,363 |
|
Accrued liabilities | 26,036 |
| | 14,780 |
|
Deferred revenues | 2,747 |
| | 2,773 |
|
Warranty obligations, current portion (includes $1,125 and $0 measured at fair value at December 31, 2014 and 2013, respectively) | 7,607 |
| | 4,942 |
|
Current portion of term loans | — |
| | 3,507 |
|
Total current liabilities | 58,706 |
| | 33,365 |
|
Long-term liabilities: | | | |
Deferred revenues, noncurrent | 16,612 |
| | 11,284 |
|
Warranty obligations, noncurrent (includes $2,437 and $0 measured at fair value at December 31, 2014 and 2013, respectively) | 26,333 |
| | 25,490 |
|
Other liabilities | 3,589 |
| | 1,154 |
|
Term loans, noncurrent | — |
| | 5,170 |
|
Total long-term liabilities | 46,534 |
| | 43,098 |
|
Total liabilities | 105,240 |
| | 76,463 |
|
Commitments and contingencies |
| |
|
Stockholders’ equity: | | | |
Preferred stock, $0.00001 par value, 10,000 shares authorized; none issued and outstanding | — |
| | — |
|
Common stock, $0.00001 par value, 100,000 shares authorized; 43,756 and 42,123 shares issued and outstanding at December 31, 2014 and 2013, respectively | — |
| | — |
|
Additional paid-in capital | 208,022 |
| | 192,916 |
|
Accumulated deficit | (160,991 | ) | | (152,939 | ) |
Accumulated other comprehensive income (loss) | (79 | ) | | 229 |
|
Total stockholders’ equity | 46,952 |
| | 40,206 |
|
Total liabilities and stockholders’ equity | $ | 152,192 |
| | $ | 116,669 |
|
See Notes to Consolidated Financial Statements.
ENPHASE ENERGY, INC. Consolidated Statements of Operations (In thousands, except per share data) |
| | | | | | | | | | | |
| Years Ended December 31, |
| 2014 | | 2013 | | 2012 |
Net revenues | $ | 343,904 |
| | $ | 232,846 |
| | $ | 216,678 |
|
Cost of revenues | 230,861 |
| | 165,430 |
| | 161,390 |
|
Gross profit | 113,043 |
| | 67,416 |
| | 55,288 |
|
Operating expenses: | | | | | |
Research and development | 45,386 |
| | 34,524 |
| | 35,601 |
|
Sales and marketing | 41,003 |
| | 31,080 |
| | 25,973 |
|
General and administrative | 31,083 |
| | 23,970 |
| | 24,875 |
|
Total operating expenses | 117,472 |
| | 89,574 |
| | 86,449 |
|
Loss from operations | (4,429 | ) | | (22,158 | ) | | (31,161 | ) |
Other income (expense), net: | | | | | |
Interest expense | (1,863 | ) | | (2,055 | ) | | (6,436 | ) |
Other income (expense) | (994 | ) | | (837 | ) | | 30 |
|
Total other expense, net | (2,857 | ) | | (2,892 | ) | | (6,406 | ) |
Loss before income taxes | (7,286 | ) | | (25,050 | ) | | (37,567 | ) |
Provision for income taxes | (766 | ) | | (863 | ) | | (651 | ) |
Net loss attributable to common stockholders | $ | (8,052 | ) | | $ | (25,913 | ) | | $ | (38,218 | ) |
Net loss per share attributable to common stockholders, basic and diluted | $ | (0.19 | ) | | $ | (0.62 | ) | | $ | (1.24 | ) |
Shares used in computing net loss per share attributable to common stockholders, basic and diluted | 42,903 |
| | 41,647 |
| | 30,740 |
|
See Notes to Consolidated Financial Statements.
ENPHASE ENERGY, INC. Consolidated Statements of Comprehensive Loss (In thousands) |
| | | | | | | | | | | |
| Years Ended December 31, |
| 2014 | | 2013 | | 2012 |
Net loss attributable to common stockholders | $ | (8,052 | ) | | $ | (25,913 | ) | | $ | (38,218 | ) |
Other comprehensive income (loss): | | | | | |
Foreign currency translation adjustments | (308 | ) | | 177 |
| | (31 | ) |
Other comprehensive income (loss): | (308 | ) | | 177 |
| | (31 | ) |
Comprehensive loss attributable to common stockholders | $ | (8,360 | ) | | $ | (25,736 | ) | | $ | (38,249 | ) |
See Notes to Consolidated Financial Statements.
ENPHASE ENERGY, INC. Consolidated Statements of Stockholders’ Equity (In thousands, except per share data) |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Convertible Preferred Stock | | Common Stock | | Additional Paid-In Capital | | Accumulated Deficit | | Accumulated Other Comprehensive Income (Loss) | | Total Stockholders’ Equity |
| Shares | | Amount | | Shares | | Amount | | | | |
BALANCE—December 31, 2011 | 22,221 |
| | 93,596 |
| | 1,698 |
| | — |
| | 9,103 |
| | (88,808 | ) | | 83 |
| | 13,974 |
|
Issuance of common stock under employee stock plans | | | | | 138 |
| | — |
| | 255 |
| | | | | | 255 |
|
Stock-based compensation | | | | | | | | | 4,766 |
| | | | | | 4,766 |
|
Common stock issued upon initial public offering (“IPO”), net of offering costs | | | | | 10,315 |
| | — |
| | 53,826 |
| | | | | | 53,826 |
|
Conversion of convertible preferred stock into common stock upon IPO | (22,221 | ) | | (93,596 | ) | | 25,171 |
| | — |
| | 93,596 |
| | | | | | — |
|
Conversion of convertible notes and paid-in-kind interest into common stock upon IPO | | | | | 3,534 |
| | — |
| | 21,204 |
| | | | | | 21,204 |
|
Reclassification of preferred stock warrant liability to APIC upon IPO | | | | | | | | | 879 |
| | | | | | 879 |
|
Net loss | | | | | | | | | | | (38,218 | ) | | | | (38,218 | ) |
Foreign currency translation adjustment | | | | | | | | | | | | | (31 | ) | | (31 | ) |
BALANCE—December 31, 2012 | — |
| | — |
| | 40,856 |
| | — |
| | 183,629 |
| | (127,026 | ) | | 52 |
| | 56,655 |
|
Issuance of common stock under employee stock plans | | | | | 1,255 |
| | — |
| | 2,438 |
| | | | | | 2,438 |
|
Stock-based compensation | | | | | | | | | 6,849 |
| | | | | | 6,849 |
|
Issuance of common stock upon net exercise of warrants | | | | | 12 |
| | — |
| | — |
| | | | | | — |
|
Net loss | | | | | | | | | | | (25,913 | ) | | | | (25,913 | ) |
Foreign currency translation adjustment | | | | | | | | | | | | | 177 |
| | 177 |
|
BALANCE—December 31, 2013 | — |
| | $ | — |
| | 42,123 |
| | $ | — |
| | $ | 192,916 |
| | $ | (152,939 | ) | | $ | 229 |
| | $ | 40,206 |
|
Issuance of common stock under employee stock plans | | | | | 1,577 |
| | — |
| | 5,366 |
| | | | | | 5,366 |
|
Stock-based compensation | | | | | | | | | 9,740 |
| | | | | | 9,740 |
|
Issuance of common stock upon cashless exercise of warrants | | | | | 56 |
| | — |
| | — |
| | | | | | — |
|
Net loss | | | | | | | | | | | (8,052 | ) | | | | (8,052 | ) |
Foreign currency translation adjustment | | | | | | | | | | | | | (308 | ) | | (308 | ) |
BALANCE—December 31, 2014 | — |
| | $ | — |
| | 43,756 |
| | $ | — |
| | $ | 208,022 |
| | $ | (160,991 | ) | | $ | (79 | ) | | $ | 46,952 |
|
See Notes to Consolidated Financial Statements.
ENPHASE ENERGY, INC. Consolidated Statements of Cash Flows (In thousands) |
| | | | | | | | | | | |
| Years Ended December 31, |
| 2014 | | 2013 | | 2012 |
Cash flows from operating activities: | | | | | |
Net loss | $ | (8,052 | ) | | $ | (25,913 | ) | | $ | (38,218 | ) |
Adjustments to reconcile net loss to net cash used in operating activities: | | | | | |
Depreciation and amortization | 8,259 |
| | 6,981 |
| | 5,568 |
|
Provision for doubtful accounts | 711 |
| | 678 |
| | 1,068 |
|
Net loss on disposal of assets | 249 |
| | 82 |
| | 120 |
|
Non-cash interest expense | 483 |
| | 429 |
| | 4,777 |
|
Stock-based compensation | 9,740 |
| | 6,849 |
| | 4,766 |
|
Change in fair value of convertible preferred stock warrants | — |
| | — |
| | (520 | ) |
Changes in operating assets and liabilities (net of acquisition): | | | | | |
Accounts receivable | (13,746 | ) | | (5,019 | ) | | (11,040 | ) |
Inventory | (5,010 | ) | | 3,263 |
| | (8,615 | ) |
Prepaid expenses and other assets | (2,547 | ) | | (1,450 | ) | | (711 | ) |
Accounts payable, accrued and other liabilities | 25,325 |
| | (1,453 | ) | | 4,174 |
|
Warranty obligations | 3,508 |
| | 9,094 |
| | 12,600 |
|
Deferred revenues | 5,302 |
| | 5,587 |
| | (18,614 | ) |
Net cash provided by (used in) operating activities | 24,222 |
| | (872 | ) | | (44,645 | ) |
Cash flows from investing activities: | | | | | |
Purchases of property and equipment | (13,249 | ) | | (6,257 | ) | | (12,990 | ) |
Purchase of patents | (750 | ) | | — |
| | — |
|
Acquisition of a business | (2,235 | ) | | — |
| | — |
|
Change in restricted cash (See Note 5) | (300 | ) | | — |
| | — |
|
Net cash used in investing activities | (16,534 | ) | | (6,257 | ) | | (12,990 | ) |
Cash flows from financing activities: | | | | | |
Principal payments under capital leases | — |
| | (40 | ) | | (96 | ) |
Proceeds from borrowings under term loans | — |
| | — |
| | 10,000 |
|
Payments of financing costs | — |
| | — |
| | (1,031 | ) |
Repayments of term loans | (8,708 | ) | | (2,447 | ) | | (14,103 | ) |
Proceeds from issuance of common stock under employee stock plans | 5,366 |
| | 2,429 |
| | 255 |
|
Proceeds from issuance of common stock in IPO, net of underwriting discounts and commissions | — |
| | — |
| | 58,609 |
|
Payment of offering costs | — |
| | — |
| | (2,198 | ) |
Net cash (used in) provided by financing activities | (3,342 | ) | | (58 | ) | | 51,436 |
|
Effect of exchange rate changes on cash | (504 | ) | | 83 |
| | (31 | ) |
Net increase (decrease) in cash and cash equivalents | 3,842 |
| | (7,104 | ) | | (6,230 | ) |
Cash and cash equivalents — Beginning of period | 38,190 |
| | 45,294 |
| | 51,524 |
|
Cash and cash equivalents — End of period | $ | 42,032 |
| | $ | 38,190 |
| | $ | 45,294 |
|
Supplemental disclosures of cash flow information: | | | | | |
Cash paid for interest | $ | 1,389 |
| | $ | 1,391 |
| | $ | 1,681 |
|
Cash paid for income taxes | $ | 472 |
| | $ | 899 |
| | $ | — |
|
Non-cash financing and investing activities: | | | | | |
Purchases of property and equipment included in accounts payable | $ | 1,840 |
| | $ | 837 |
| | $ | 772 |
|
Conversion of convertible notes into common stock upon IPO | $ | — |
| | $ | — |
| | $ | 21,204 |
|
Acquisition-related contingent consideration liability | $ | 2,300 |
| | $ | — |
| | $ | — |
|
Reclassification of convertible preferred stock warrant liability to additional paid-in capital upon IPO | $ | — |
| | $ | — |
| | $ | 879 |
|
See Notes to Consolidated Financial Statements.
ENPHASE ENERGY, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
YEARS ENDED DECEMBER 31, 2014, 2013 and 2012
1. DESCRIPTION OF BUSINESS
Enphase Energy, Inc. and subsidiaries (the “Company”) designs, develops, and sells microinverter systems for the solar photovoltaic industry. The Company was incorporated in 2006 and began selling its products in 2008. The Company’s microinverter system consists of (i) an Enphase microinverter and related accessories that convert direct current (“DC”) power to grid-compliant alternating current (“AC”) power; (ii) an Envoy communications gateway device that collects and transmits performance information from each solar module to the Company’s hosted data center; and (iii) the Enlighten web-based software platform that collects and processes this information to enable customers to monitor and manage their solar power systems. The Company sells microinverter systems primarily to distributors who resell them to solar installers. The Company also sells directly to large installers as well as through original equipment manufacturers (“OEMs”) and strategic partners. The Company also offers operations and maintenance services for photovoltaic (“PV”) systems including preventive and corrective maintenance, solar panel cleaning and solar system commissioning.
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
Basis of Presentation and Consolidation
The accompanying consolidated financial statements are prepared in accordance with accounting principles generally accepted in the United States (“US GAAP”). The consolidated financial statements include the accounts of the Company and its wholly-owned subsidiaries. All intercompany balances and transactions have been eliminated in consolidation.
Certain amounts in the prior years' consolidated financial statements have been reclassified to conform to the current year presentation, including separately presenting balances for “Warranty obligations” in current liabilities on the consolidated balance sheets and under changes in operating assets and liabilities on the consolidated statements of cash flows. In addition, the balance for “Intangibles, net” which was combined with other current assets on the consolidated balance sheets in the prior year has been reclassified to a separate line item to conform with the current year presentation.
Use of Estimates
The preparation of the Company’s consolidated financial statements in conformity with US GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of income and expenses during the reporting period. These estimates are based on information available as of the date of the financial statements; therefore, actual results could differ materially from management’s estimates using different assumptions or under different conditions.
Revenue Recognition
The Company generates revenue from sales of its microinverter systems, which include microinverter units and related accessories, an Envoy communications gateway device, and an Enlighten web-based monitoring service, to distributors, large installers, OEMs and strategic partners. Enlighten service revenue represented less than 1% of the total revenues for all periods presented.
Revenues from sales of microinverters and related accessories, and communication gateways are recognized when: (i) persuasive evidence of an arrangement exists; (ii) delivery of the products has occurred in accordance with the terms of the sales agreement and title and risk of loss have passed to the customer; (iii) the sale price is fixed or determinable; and (iv) collection is reasonably assured. Provisions for rebates, sales incentives, and discounts to customers are accounted for as reductions in revenue in the same period the related sales are recorded.
Sales of an Envoy communications gateway device include the Enlighten web-based monitoring service. The allocation of revenue between the two deliverables is based on the Company’s best estimate of selling price determined by considering multiple factors including, internal costs, gross margin and historical pricing practices. After allocating the overall consideration from such sale to each deliverable using a best estimate of the selling price, (i) revenue from the sale of Envoy devices is recognized upon shipment, assuming all other revenue recognition criteria have been met and (ii) revenue from the
web-based monitoring service is recognized ratably over the estimated economic life of the related Envoy devices of 10 years.
Deferred revenues consist of payments received from customers in advance of revenue recognition for the Company’s products and services described above. As of December 31, 2014 and 2013, deferred revenues consist entirely of Enlighten service revenue.
Cost of Revenues
The Company includes the following in cost of revenues: product costs, warranty, manufacturing personnel and logistics costs, freight costs, inventory write-downs, hosting services costs related to the Company’s Enlighten service offering, and depreciation and amortization of manufacturing test equipment.
Cash and Cash Equivalents
The Company considers all highly liquid investments, such as certificates of deposit and money market instruments with maturities of three months or less at the time of acquisition to be cash equivalents. For all periods presented, its cash balances consist of amounts held in non-interest-bearing deposits and money market accounts.
Fair Value of Financial Instruments
The carrying amounts of the Company’s cash and cash equivalents, accounts receivable, accounts payable and accrued liabilities approximate fair value because of the short maturity of those instruments.
Foreign Currency Forward Contracts
The Company operates and conducts business in foreign countries where its foreign entities use the local currency as their respective functional currency. As a result, the Company is exposed to movements in foreign currency exchange rates. The Company utilizes foreign currency forward contracts to reduce the impact of foreign currency fluctuations related to anticipated cash receipts from expected future revenues denominated in Euros and British Pounds as well as from intercompany transaction gains or losses. The foreign currency forward contracts are accounted for as derivatives whereby the fair value of the contracts is reported as other current assets or current liabilities in the accompanying consolidated balance sheets, and gains and losses resulting from changes in the fair value are reported in other income (expense), net, in the accompanying consolidated statements of operations.
Allowances for Doubtful Accounts
The Company maintains allowances for doubtful accounts for uncollectible accounts receivable. Management estimates anticipated losses from doubtful accounts based on days past due, collection history and the financial health of customers. The allowance for doubtful accounts was $0.6 million and $2.0 million at December 31, 2014 and 2013, respectively. The following table sets forth activities in the allowance for doubtful accounts for the periods indicated:
|
| | | | | | | | | | | |
| December 31, |
| 2014 | | 2013 | | 2012 |
Balance, at beginning of year | $ | 2,000 |
| | $ | 1,177 |
| | $ | 144 |
|
Net charges to expenses | 196 |
| | 678 |
| | 1,068 |
|
Write-offs, net of recoveries | (1,627 | ) | | 145 |
| | (35 | ) |
Balance, at end of year | $ | 569 |
| | $ | 2,000 |
| | $ | 1,177 |
|
Inventory
Inventory is valued at the lower of cost or market. The Company determines cost on a first-in first-out basis. Certain factors could affect the realizable value of its inventory, including customer demand and market conditions. Management assesses the valuation on a quarterly basis and writes down the value for any excess and obsolete inventory based upon expected demand, anticipated sales price, effect of new product introductions, product obsolescence, customer concentrations, product merchantability and other factors. Inventory write-downs are equal to the difference between the cost of inventories and their estimated net realizable market value.
Property and Equipment
Property and equipment are stated at cost less accumulated depreciation. Cost includes amounts paid to acquire or construct the asset as well as any expenditure that substantially adds to the value of or significantly extends the useful life of an existing asset. Repair and maintenance costs are expensed as incurred. Depreciation and amortization is computed using the straight-line method over the estimated useful lives of the assets, which range from three to ten years. Leasehold improvements are amortized over the shorter of the lease term or expected useful life of the improvements.
Capitalized Software Costs
Internally used software, whether purchased or developed, is capitalized and amortized on a straight-line basis over its estimated useful life. Costs associated with internally developed software are expensed until the point at which the project has reached the development stage. Subsequent additions, modifications or upgrades to internal-use software are capitalized only to the extent that they provide additional functionality. Software maintenance and training costs are expensed in the period in which they are incurred. The capitalization of software requires judgment in determining when a project has reached the development stage and the period over which the Company expects to benefit from the use of that software.
Long-Lived Assets
Property, plant and equipment, including capitalized software costs, are recorded at cost. Property, plant and equipment amounts are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset (asset group) may not be recoverable. An impairment loss would be recognized when the carrying amount of an asset exceeds the estimated undiscounted future cash flows expected to result from the use of the asset and its eventual disposition. The amount of the impairment loss to be recorded is calculated by the excess of the asset's carrying value over its fair value. Fair value is generally determined using a discounted cash flow analysis. The Company did not record any significant impairments in any of the years presented.
Business Combinations
The Company allocates the fair value of purchase consideration (including contingent consideration) to the assets acquired and liabilities assumed based on their estimated fair values at the acquisition date. The excess of the fair value of purchase consideration over the fair value of these assets acquired and liabilities assumed in the acquisition is recorded as goodwill. The primary items that generate goodwill include the value of the synergies between the acquiree and the Company and the value of the acquired assembled workforce, neither of which qualifies for recognition as an intangible asset. Acquisition-related expenses are recognized separately from the business combination and are expensed as incurred. The results of operations of NPS have been included in the Company’s consolidated results prospectively from the date of acquisition. See Note 5, “Business Combination, Goodwill and Intangible Assets” to the consolidated financial statements for further discussion.
Goodwill
Goodwill is not amortized, but is assessed for potential impairment at least annually during the fourth quarter of each fiscal year or between annual tests if an event occurs or circumstances change that would indicate the carrying amount may be impaired.
Intangible Assets
Intangible assets include patents, customer relationships and other purchased intangible assets. Intangible assets with finite lives are amortized on a straight-line basis, with estimated useful lives ranging from 3 to 5 years. Indefinite-lived intangible assets are tested for impairment annually, and are tested for impairment between annual tests if an event occurs or circumstances change that would indicate that the carrying amount may be impaired. Intangible assets with a finite lives are tested for impairment whenever events or circumstances indicate that the carrying amount of an asset (asset group) may not be recoverable. An impairment loss is recognized when the carrying amount of an asset exceeds the estimated undiscounted cash flows used in determining the fair value of the asset. The amount of the impairment loss to be recorded is calculated by the excess of the asset's carrying value over its fair value. Fair value is generally determined using a discounted cash flow analysis. There has been no impairment of intangible assets in any of the years presented.
Warranty Obligations
Microinverters Sold Through December 31, 2013
The Company’s warranty accrual provides for the replacement of microinverter units that fail during the product’s warranty term (15 years for first and second generation microinverters and up to 25 years for third and fourth generation microinverters). On a quarterly basis, the Company employs a consistent, systematic and rational methodology to assess the adequacy of its warranty liability. This assessment includes updating all key estimates and assumptions for each generation of product, based on historical results, trends and the most current data available as of the filing date. The key estimates and assumptions used in the warranty liability are thoroughly reviewed by management on a quarterly basis. The key estimates used by the Company to estimate its warranty liability are: (1) the number of units expected to fail over time (i.e. failure rate); (2) the number of failed units expected to result in warranty claims over time (i.e. claim rate); and (3) the per unit cost of replacement units, including outbound shipping and limited labor costs, expected to be incurred to replace failed units over time (i.e. replacement cost).
Estimated Failure Rates—The Company’s Quality and Reliability department has primary responsibility to determine the estimated failure rates for each generation of microinverter. To establish initial failure rate estimates for each generation of microinverter, the Company’s quality engineers use a combination of industry standard MTBF (Mean Time Between Failure) estimates for individual components contained in its microinverters, third party data collected on similar equipment deployed in outdoor environments similar to those in which the Company’s microinverters are installed, and rigorous long term reliability and accelerated life cycle testing which simulates the service life of the microinverter in a short period of time. As units are deployed into operating environments, the Company continues to monitor product performance via its Enlighten monitoring platform. It typically takes three to nine months between the date of sale and date of end-user installation. Consequently, the Company’s ability to monitor actual failures of units sold similarly lags by three to nine months. When a microinverter fails and is returned, the Company performs diagnostic root cause failure analysis to understand and isolate the underlying mechanism(s) causing the failure. The Company then uses the results of this analysis (combined with the actual, cumulative performance data collected on those units prior to failure via Enlighten) to draw conclusions with respect to how or if the identified failure mechanism(s) will impact the remaining units deployed in the installed base.
Estimated Claim Rates—Warranty claim rate estimates are based upon assumptions with respect to expected customer behavior over the warranty period. As the vast majority of the Company’s microinverters have been sold to end users for residential applications, the Company believes that warranty claim rates will be affected by changes over time in residential home ownership because the Company expects that subsequent homeowners are less likely to file claims than the homeowners who originally purchase the microinverters.
Estimated Replacement Costs—Three factors are considered in the Company’s analysis of estimated replacement cost: (1) the estimated cost of replacement microinverters; (2) the estimated cost to ship replacement microinverters to end users; and (3) the estimated labor reimbursement expected to be paid to third party installers performing replacement services for the end user. Because the Company’s warranty provides for the replacement of defective microinverters over long periods of time (either 15 or 25 years, depending on the generation of product purchased), the estimated per unit cost of current and future product generations is considered in the estimated replacement cost. Estimated costs to ship replacement units are based on observable, market-based shipping costs paid by the Company to third party freight carriers. The Company has a separate program that allows third-party installers to claim fixed-dollar reimbursements for labor costs they incur to replace failed microinverter units for a limited time from the date of original installation. Included in the Company’s estimated replacement cost is an analysis of the number of fixed-dollar labor reimbursements expected to be claimed by third party installers over the limited offering period.
If actual failure rates, claim rates, or replacement costs differ from the Company’s estimates in future periods, changes to these estimates would be required, resulting in increases or decreases in the Company’s warranty obligations. Such increases or decreases could be material.
Fair Value Option for Microinverters Sold Since January 1, 2014
The Company’s warranty obligations related to microinverters sold since January 1, 2014 provide the Company the right, but not the requirement, to assign its warranty obligations to a third-party. Under Accounting Standards Codification (“ASC”) 825—Financial Instruments, (“fair value option”), an entity may choose to elect the fair value option for such warranties at the time it first recognizes the eligible item. The Company made an irrevocable election to account for all
eligible warranty obligations associated with microinverters sold since January 1, 2014 at fair value. This election was made to reflect the underlying economics of the time value of money for an obligation that will be settled over an extended period of up to 25 years.
The Company estimates the fair value of warranty obligations by calculating the warranty obligations in the same manner as for sales prior to January 1, 2014 and applying an expected present value technique to that result. The expected present value technique, an income approach, converts future amounts into a single current discounted amount. In addition to the key estimates of failure rates, claim rates and replacement costs, the Company used certain inputs that are unobservable and significant to the overall fair value measurement. Such additional assumptions included compensation comprised of a profit element and risk premium required of a market participant to assume the obligation and a discount rate based on the Company’s credit-adjusted risk-free rate. See Note 8, (“Fair Value Measurements”) for additional information.
Warranty obligations initially recorded at fair value at the time of sale will be subsequently re-measured to fair value at each reporting date. In addition, the fair value of the liability will be accreted over the corresponding term of the warranty of up to 25 years using the interest method. Any changes in fair value of the liability from period-to-period, including accretion expense, will be recognized in cost of revenues. As of December 31, 2014, warranty obligations associated with sales prior to January 1, 2014 were $30.0 million and warranty obligations associated with sales since January 1, 2014 were $3.9 million, of which $3.6 million were eligible for fair value accounting. The portion of warranty obligations arising from sales since January 1, 2014 that was not eligible for fair value accounting relates to sales of non-microinverter products. Periodic adjustments necessitated by actual experience of claims and any future changes in estimates to amounts not eligible for fair value accounting will continue to be accounted for on an undiscounted basis.
Research and Development Costs
The Company expenses research and development costs as incurred. Research and development costs totaled $45.4 million, $34.5 million and $35.6 million in 2014, 2013 and 2012, respectively.
Stock-Based Compensation
Share-based payments are required to be recognized in the Company’s consolidated statements of operations based on their fair values and the estimated number of shares expected to vest. The Company measures stock-based compensation expense for all share-based payment awards, including stock options made to employees and directors, based on the estimated fair values on the date of the grant. The fair value of stock options granted is estimated using the Black-Scholes option valuation model. The fair value of restricted stock units granted is determined based on the price of the Company’s common stock on the date of grant. Stock-based compensation, net of estimated forfeitures, is recognized on a straight-line basis over the requisite service period, which is typically four years.
Comprehensive Loss
Comprehensive loss consists of two components, net loss and other comprehensive income (loss). Other comprehensive income (loss) refers to gains and losses that are recorded as an element of stockholders’ equity but are excluded from net income. The Company’s other comprehensive income (loss) consists of foreign currency translation adjustments for all periods presented.
Income Taxes
The Company records income taxes using the asset and liability method, which requires the recognition of deferred tax assets and liabilities for the expected tax consequences of temporary differences between the tax bases of assets and liabilities for financial reporting purposes and amounts recognized for income tax purposes. In estimating future tax consequences, generally all expected future events other than enactments or changes in the tax law or rates are considered. Valuation allowances are provided when necessary to reduce deferred tax assets to the amount expected to be realized.
The Company operates in various tax jurisdictions and is subject to audit by various tax authorities. The Company follows accounting for uncertainty in income taxes which requires that the tax effects of a position be recognized only if it is “more likely than not” to be sustained based solely on its technical merits as of the reporting date. The Company considers many factors when evaluating and estimating its tax positions and tax benefits, which may require periodic adjustments and which may not accurately anticipate actual outcomes.
Contingent Consideration Liability
The estimated fair value of the contingent consideration liability, initially measured and recorded on the acquisition date, is reviewed at each reporting period and revalued to its then fair value until the contingency is resolved. Increases or decreases in the fair value of the contingent consideration liability subsequent to the acquisition date can result from changes in the assumed probabilities applied to the achievement of certain revenue targets and the corresponding payout amounts. These changes in the fair value will be recognized in the consolidated statements of operations for the period in which the estimated fair value changes.
Recent Accounting Pronouncements Not Yet Effective
In May 2014, the Financial Accounting Standards Board (“FASB”) issued Accounting Standards Update (“ASU”) No. 2014-09 (Topic 606), Revenue from Contracts with Customers, which will replace most existing revenue recognition guidance under US GAAP. The updated standard’s core principle is that revenue is recognized when promised goods or services are transferred to customers in an amount that reflects the consideration to which an entity expects to be entitled in exchange for those goods or services. The standard generally requires an entity to identify performance obligations in its contracts, estimate the amount of variable consideration to be received in the transaction price, allocate the transaction price to each separate performance obligation, and recognize revenue as obligations are satisfied. In addition, the updated standard requires additional disclosure about the nature, amount, timing and uncertainty of revenue and cash flows arising from customer contracts. ASU 2014-09 is effective for annual and interim periods beginning after December 15, 2016. Early adoption is not permitted. Accordingly, the ASU will be effective for the Company beginning in the first quarter of 2017. The Company is currently evaluating the impact of the adoption on its consolidated financial statements.
3. INVENTORY
Inventory as of December 31, 2014 and 2013, consists of the following (in thousands):
|
| | | | | | | |
| December 31, |
| 2014 | | 2013 |
Raw materials | $ | 3,429 |
| | $ | 1,428 |
|
Finished goods | 18,161 |
| | 15,152 |
|
Total inventory | $ | 21,590 |
| | $ | 16,580 |
|
4. PROPERTY AND EQUIPMENT, NET
As of December 31, 2014 and 2013, property and equipment consists of the following (in thousands):
|
| | | | | | | | | |
| Estimated Useful Life (Years) | | December 31, |
| | 2014 | | 2013 |
Equipment and machinery | 5 | | $ | 28,923 |
| | $ | 21,853 |
|
Furniture and fixtures | 5–7 | | 3,032 |
| | 2,837 |
|
Computer equipment | 3–5 | | 2,194 |
| | 1,842 |
|
Capitalized software | 3–5 | | 8,905 |
| | 7,343 |
|
Leasehold improvements | 4–10 | | 6,636 |
| | 5,881 |
|
Construction in progress | | | 4,911 |
| | 1,703 |
|
Total | | | 54,601 |
| | 41,459 |
|
Less accumulated depreciation and amortization | | | (23,777 | ) | | (16,606 | ) |
Property and equipment, net | | | $ | 30,824 |
| | $ | 24,853 |
|
Depreciation and amortization expense for property and equipment was $8.1 million, $7.0 million and $5.6 million, in 2014, 2013 and 2012, respectively.
As of December 31, 2014 and 2013, unamortized capitalized software costs were $3.3 million and $3.6 million, respectively.
5. BUSINESS COMBINATION, GOODWILL AND INTANGIBLE ASSETS
Acquisition
On December 12, 2014, the Company acquired substantially all of the assets of NPS. Founded in 2009 and based in Berkeley, California, NPS is a provider of services designed specifically for the solar industry. The acquisition is expected to complement the Company’s existing asset management and operations and maintenance service offering.
The following table summarizes the allocation of the total purchase price to acquired tangible and identifiable intangible assets based on their estimated fair values as of the date of acquisition (in thousands):
|
| | | | |
Cash consideration | | $ | 2,535 |
|
Contingent consideration | | 2,300 |
|
Total purchase consideration | | $ | 4,835 |
|
| | |
Property and equipment | | $ | 190 |
|
Customer relationships | | 900 |
|
Goodwill | | 3,745 |
|
Net assets acquired | | $ | 4,835 |
|
This acquisition has been accounted for as a business combination. The total purchase consideration of $4.8 million consisted of $2.5 million in cash (of which $0.3 million was held back for potential breaches of representations and warranties) and $2.3 million of contingent consideration (described below). The indemnity hold back will be paid one year from the date of closing of the acquisition subject to any deductions for indemnity conditions and was recorded as restricted cash with an offsetting obligation in other accrued liabilities.
The fair values assigned to the net assets acquired are based on management’s estimates and assumptions. The goodwill of $3.7 million is attributable to the value of the synergies expected to arise upon the integration of NPS into the Company’s operations and the value of the acquired workforce. A portion of goodwill related to this acquisition is deductible for income tax purposes.
The fair value of the acquired customer relationships was calculated by discounting the projected discrete after-tax cash flows from these existing customers (less an anticipated customer attrition rate) to its present value.
The purchase consideration includes a contingent consideration arrangement that requires additional cash payments by the Company based on certain defined 2015 and 2016 revenue targets. Amounts are payable in early 2016 and 2017. The range of the undiscounted amounts the Company could pay under the contingent consideration arrangement is between zero and $5.5 million. The fair value of the contingent consideration was estimated based on significant inputs not observed in the market and thus represents a Level 3 input as defined in connection with the fair value hierarchy. See Note 8, “Fair Value Measurements” for further discussion. Any future change in the estimated fair value of the contingent consideration will be recognized in the consolidated statements of operations for the period in which the estimated fair value changes.
The acquisition was not material to the Company’s financial position or results of operations, and therefore proforma operating results for NPS have not been presented. The results of operations of NPS have been included in the Company’s consolidated results prospectively from the date of acquisition. The Company recognized approximately $0.2 million of acquisition related costs in 2014, which were recorded in general and administrative expenses in the Company’s consolidated statements of operations.
Goodwill and Intangible Assets
|
| | | | | | | | | | | | | | | | | | | | | | | |
| December 31, 2014 | | December 31, 2013 |
| Gross | | Accumulated Amortization | | Net | | Gross | | Accumulated Amortization | | Net |
Goodwill | $ | 3,745 |
| | $ | — |
| | $ | 3,745 |
| | $ | — |
| | $ | — |
| | $ | — |
|
| | | | | | | | | | | |
Other indefinite-lived intangibles | $ | 286 |
| | $ | — |
| | $ | 286 |
| | $ | 286 |
| | $ | — |
| | $ | 286 |
|
Intangibles assets with finite lives: |
|
| | | |
| | | | | |
|
Customer relationships | 900 |
| | — |
| | 900 |
| | — |
| | — |
| | — |
|
Patents | 750 |
| | (125 | ) | | 625 |
| | — |
| | — |
| | — |
|
Total purchased intangibles | $ | 1,936 |
| | $ | (125 | ) | | $ | 1,811 |
| | $ | 286 |
| | $ | — |
| | $ | 286 |
|
In July 2014, the Company purchased certain patents related to system interconnection and photovoltaic AC module construction. The patents are being amortized over their legal life of 3 years. The customer relationship intangible resulted from the Company’s NPS acquisition and is being amortized on a straight-line basis over its estimated useful life of 5 years.
As of December 31, 2014, estimated future amortization expense related to finite-lived intangible assets was as follows:
|
| | | | |
Year | | (In thousands) |
2015 | | $ | 430 |
|
2016 | | 430 |
|
2017 | | 305 |
|
2018 | | 180 |
|
2019 | | 180 |
|
Total | | $ | 1,525 |
|
6. ACCRUED LIABILITIES
Accrued liabilities consisted of the following (in thousands):
|
| | | | | | | |
| December 31, |
| 2014 | | 2013 |
Salaries, commissions, incentive compensation and benefits | $ | 14,871 |
| | $ | 6,499 |
|
Customer rebates and sales incentives | 5,083 |
| | 2,818 |
|
Other | 6,082 |
| | 5,463 |
|
Total | 26,036 |
| | 14,780 |
|
7. WARRANTY OBLIGATIONS
The Company’s warranty activities during 2014, 2013 and 2012 were as follows (in thousands):
|
| | | | | | | | | | | |
| December 31, |
| 2014 | | 2013 | | 2012 |
Balance, at beginning of year | $ | 30,432 |
| | 21,338 |
| | $ | 8,738 |
|
Accruals for warranties issued during the year | 4,309 |
| | 6,303 |
| | 8,218 |
|
Changes in estimates | 8,391 |
| | 10,303 |
| | 7,607 |
|
Settlements | (8,793 | ) | | (7,512 | ) |
| (3,225 | ) |
Increase due to accretion expense | 195 |
| | — |
| | — |
|
Fair value adjustments | (594 | ) | | — |
| | — |
|
Balance, at end of year | 33,940 |
| | 30,432 |
| | 21,338 |
|
Less current portion | (7,607 | ) | | (4,942 | ) | | (6,078 | ) |
Long-term portion | $ | 26,333 |
| | $ | 25,490 |
| | $ | 15,260 |
|
The Company sold approximately 1.0 million second generation microinverters from 2009 through mid-2012. The Company has sold approximately 3.9 million third generation microinverters since mid-2012 and continues to sell such third generation microinverters. The Company has sold 2.3 million fourth generation microinverters since mid-2013.
Changes in Estimates
On a quarterly basis, the Company uses the best and most complete underlying information available, following a consistent, systematic and rational methodology to determine its warranty obligations. The Company considers all available evidence to assess the reasonableness of all key assumptions underlying its estimated warranty obligations for each generation of microinverter. The changes in estimates discussed below arose from new information available to management and subsequent developments, and accordingly, from better insight and improved judgment. Changes in estimates included in the table above were comprised of the following:
2014
In 2014, primarily in the second and fourth quarters, the Company experienced actual failures of its second generation microinverters that exceeded its then current failure rate estimate. Based on continuing analysis of field performance data and diagnostic root-cause failure analysis performed on returned units, the Company concluded that it was necessary to increase the estimated failure rates for its second generation product and recorded additional warranty expense $8.6 million in 2014. In addition, net changes in estimates related to replacement costs reduced warranty expense for all product generations by $0.2 million and were comprised of increased estimates of certain labor reimbursement costs expected to be paid to third party installers performing replacement services for its second generation product of $1.3 million, offset by a $1.5 million decrease to estimated costs of replacement microinverter units for all product generations.
2013
In 2013, primarily in the second, third and fourth quarters, the Company experienced actual failures of its second generation microinverters that exceeded its then current failure rate estimate. Based on continuing analysis of field performance data and diagnostic root-cause failure analysis performed on returned units, the Company concluded that it was necessary to increase the estimated failure rates for its second generation product and recorded additional warranty expense of $19.5 million in 2013. During the third quarter of 2013, the Company recorded a reduction to warranty expense of $3.1 million related to a decrease in the expected failure rate of the Company’s third generation product. The Company concluded that there was sufficient historical data of actual field performance of previously sold third generation products to support a lower estimated failure rate.
In addition, the Company updated its estimated claim rates for its second and third generation products resulting in a decrease to warranty expense of $4.2 million. The revision to estimated claim rates was based on the Company’s observed historical end user behavior and assumptions with respect to expected customer behavior over the 15 or 25 year warranty term.
Also, the Company decreased warranty expense by $1.9 million primarily to reflect estimated lower costs to produce fourth generation microinverters to fulfill warranty obligations for second and third generation microinverters.
2012
In 2012, primarily in the third and fourth quarters, the Company experienced actual failures of its second generation microinverters that exceeded its then current failure rate estimate. Based on continuing analysis of field performance data and diagnostic root-cause failure analysis performed on returned units, the Company concluded that it was necessary to increase the estimated failure rates for its second generation product and recorded additional warranty expense of $10.2 million in 2012.
In the fourth quarter of 2012, the Company revised its claim rate estimate to reflect a decrease in the percentage of end users who are able to access their system’s performance data using the Enlighten monitoring service. Approximately 80 to 90 percent of end users have purchased systems that include Enlighten. End users who have not purchased Enlighten do not have access to the same inverter-level performance data as end users using Enlighten and, consequently are less likely to make warranty claims. In 2012, based on observation of historical results, the Company confirmed that non-Enlighten end users had a lower claim rate than originally estimated. As a result, warranty expense decreased by $0.5 million to reflect this information.
In addition, the Company recorded a reduction to warranty expense of $2.1 million related to replacement costs, primarily comprised of a $1.9 million reduction in shipping costs. Beginning in the third quarter of 2012, the Company revised its business practice to utilize non-expedited shipping terms for future replacement units, resulting in the reduction in estimated future replacement costs.
8. FAIR VALUE MEASUREMENTS
The accounting guidance defines fair value as the price that would be received from selling an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. When determining the fair value measurements for assets and liabilities required to be recorded at fair value, the Company considers the principal or most advantageous market in which it would transact and considers assumptions that market participants would use when pricing the asset or liability, such as inherent risk, transfer restrictions, and risk of nonperformance.
The fair value hierarchy requires an entity to maximize the use of observable inputs and minimize the use of unobservable inputs when measuring fair value. An asset’s or liability’s categorization within the fair value hierarchy is based upon the lowest level of input that is significant to the fair value measurement. Three levels of inputs may be used to measure fair value:
| |
• | Level 1—Valuations based on quoted prices in active markets for identical assets or liabilities that the Company is able to access. Since valuations are based on quoted prices that are readily and regularly available in an active market, valuation of such assets or liabilities do not entail a significant degree of judgment. |
| |
• | Level 2—Valuations based on one or more quoted prices in markets that are not active or for which all significant inputs are observable, either directly or indirectly. |
| |
• | Level 3—Valuations based on inputs that are unobservable and significant to the overall fair value measurement. |
The following table presents the Company’s assets and liabilities that were measured at fair value on a recurring basis and its categorization within the fair value hierarchy at December 31, 2014 and 2013 (in thousands):
|
| | | | | | | | | |
| Fair Value Hierarchy | | December 31, 2014 | | December 31, 2013 |
Assets: | | | | | |
Foreign currency forward contracts | Level 2 | | $ | 76 |
| | $ | 325 |
|
| | | | | |
Liabilities: | | | | | |
Foreign currency forward contracts | Level 2 | | $ | — |
| | $ | 605 |
|
Warranty obligations | Level 3 | | 3,562 |
| | — |
|
Contingent consideration | Level 3 | | 2,300 |
| | — |
|
Foreign Currency Forward Contracts
The Company utilizes foreign currency forward contracts from time to time to reduce the impact of foreign currency fluctuations arising from both sales and purchases denominated in Euros and the British Pound Sterling.
As of December 31, 2014 and 2013, the aggregate gross notional amounts of outstanding foreign currency forward contracts, all with maturities of less than one year, were $1.5 million and $12.5 million, respectively.
The Company recorded $0.3 million of net gains in 2014 and $0.4 million and $0.5 million of net losses in 2013 and 2012, respectively, related to foreign currency forward contracts.
Fair Value Option for Warranty Obligations Related to Microinverters Sold Since January 1, 2014
The Company estimates the fair value of warranty obligations by calculating the warranty obligations in the same manner as for sales prior to January 1, 2014 and applying an expected present value technique to that result. The expected present value technique, an income approach, converts future amounts into a single current discounted amount. In addition to the key estimates of failure rates, claim rates and replacement costs, the Company used certain Level 3 inputs which are unobservable and significant to the overall fair value measurement. Such additional assumptions included a discount rate based on the Company’s credit-adjusted risk-free rate and compensation comprised of a profit element and risk premium required of a market participant to assume the obligation.
The following table provides a reconciliation of the beginning and ending balances of warranty obligations measured at fair value for the periods indicated (in thousands):
|
| | | |
Balance—December 31, 2013 | $ | — |
|
Accruals for warranties issued during period | 3,989 |
|
Changes in estimates | 26 |
|
Settlements | (54 | ) |
Increase due to accretion expense | 195 |
|
Fair value adjustments | (594 | ) |
Balance—December 31, 2014 | $ | 3,562 |
|
Contingent Consideration
The fair value of the contingent consideration recognized on the acquisition date of $2.3 million was estimated by applying the income approach. That measure is based on significant Level 3 inputs not observable in the market. Key assumptions include (1) probability adjusted level of revenues between $2.6 million and $17.0 million and the resultant payout; and (2) a risk-adjusted discount rate was estimated using a capital asset pricing model, which reflects an expected rate of return required by a market participant holding a similarly risky asset.
The following table provides a reconciliation of the beginning and ending balances of contingent consideration measured at fair value for the periods indicated (in thousands):
|
| | | |
Balance—December 31, 2013 | $ | — |
|
Fair value of contingent consideration—acquisition of NPS | 2,300 |
|
Fair value adjustment to contingent consideration | — |
|
Balance—December 31, 2014 | $ | 2,300 |
|
Quantitative and Qualitative Information about Level 3 Fair Value Measurements
As of December 31, 2014, the significant unobservable inputs used in the fair value measurement of the Company’s liabilities designated as Level 3 are as follows:
|
| | | | | | |
Item Measured at Fair Value | | Valuation Technique | | Description of Significant Unobservable Input | | Percent Used (Weighted-Average) |
Warranty obligations for microinverters sold since January 1, 2014 | | Discounted cash flows | | Profit element and risk premium | | 18% |
| | Credit-adjusted risk-free rate | | 18% |
| | | | | | |
Contingent consideration | | Probability-weighted discounted cash flows | | Risk-adjusted discount rate | | 18% |
Sensitivity of Level 3 Inputs
Warranty Obligations
Each of the significant unobservable inputs is independent of the other. The profit element and risk premium are estimated based on requirements of a third-party participant willing to assume the Company’s warranty obligations. The discount rate is determined by reference to the Company’s own credit standing at the fair value measurement date. Increasing (decreasing) the profit element and risk premium input by 100 basis points would not have a material impact on the fair value measurement of the liability. Increasing (decreasing) the discount rate by 100 basis points would result in a ($138,000) $152,000 (decrease) increase, respectively, to the fair value measurement of the liability.
Contingent Consideration
Changes in assumed probability adjustments with respect to achievement of target metric can materially impact the fair value measurement of contingent consideration as of the acquisition date and for each subsequent period. Assumptions about the probability and amount of payout will require less subjectivity over the course of the earnout period as management refines estimates based on actual events. Due to the short duration of the earnout period of two years, increasing (decreasing) the risk-adjusted discount rate by 100 basis points would not have a material impact on the fair value measurement of contingent consideration.
9. DEBT AND REVOLVING CREDIT FACILITY
The Company’s debt obligations were comprised of the following at December 31, 2014 and 2013 (in thousands):
|
| | | | | | | |
| December 31, |
| 2014 | | 2013 |
Term loan | $ | — |
| | $ | 7,400 |
|
Equipment financing facility, net of unamortized discount of $0 and $94, respectively | — |
| | 3,661 |
|
Total debt | — |
| | 11,061 |
|
Less current portion | — |
| | (2,384 | ) |
Long-term portion | $ | — |
| | $ | 8,677 |
|
Revolving Credit Facility
The Company has a $50.0 million revolving credit facility (the “Revolver”) with Wells Fargo Bank, N.A. (“Wells Fargo”) that was entered into in November 2012 and subsequently amended in February 2014 to extend the maturity date to November 2016. The amount of loans available to be drawn under the Revolver is subject to a borrowing base calculation that limits availability to a percentage of eligible domestic accounts receivable plus a percentage of the value of eligible domestic inventory, less certain reserves. Loans under the Revolver bear interest in cash at an annual rate equal to, at the Company’s option, either LIBOR or a “base rate” that is comprised of, among other things, the prime rate, plus a margin that is between 1.5% and 4.25% depending on the currency borrowed and the specific term of repayment. The Revolver contains customary affirmative and negative covenants and events of default, and requires the Company to maintain at least $15.0 million of liquidity at all times, of which at least $5.0 million must be undrawn availability. To date, the Company has not drawn on the Revolver and approximately $37.6 million was available for borrowing as of December 31, 2014 based on eligible accounts receivable and inventory balances pursuant to the agreement.
Full Repayment of Term Loan
On November 7, 2012, the Company entered into a Loan and Security Agreement (“Loan Agreement”) with Hercules Technology Growth Capital, Inc. (“Hercules”) and made an initial draw of $7.4 million. In addition, the Loan Agreement provided $15.6 million in additional borrowing capacity, which expired undrawn on March 31, 2014. Borrowings under the Loan Agreement bore interest at an annual rate equal to the higher of (i) the prime rate plus 8.25% or (b) 11.5%. Payments for the first 15 months were for interest-only and equal monthly payments thereafter through the maturity date of August 1, 2016 were for interest and principal. The Loan Agreement included a fixed $0.6 million back-end fee due on the earlier of prepayment in full or upon expiration of the Loan Agreement. Borrowings under the Loan Agreement were secured by a pledge of substantially all of the Company’s assets other than intellectual property. The Loan Agreement did not include any financial covenants.
On December 8, 2014, the Company repaid all of the $5.8 million in outstanding indebtedness including accrued interest and related fees thereon and terminated the Loan Agreement, which was scheduled to mature on August 1, 2016.
Full Repayment of Equipment Financing Facility
On June 13, 2011, the Company entered into a $5.0 million equipment financing facility with Hercules with a three year term. Borrowings under the equipment financing facility had a variable interest rate set at the higher of 5.75% above the prime lending rate and 9.0% annually. Borrowings were secured by the financed equipment and restricts the Company’s ability to pay dividends and take on certain types of additional liens. On July 1, 2014, the equipment financing facility expired in accordance with its terms and all remaining amounts outstanding were repaid in full.
10. COMMITMENTS AND CONTINGENCIES
Operating Leases—The Company leases office facilities under noncancelable operating leases that expire on various dates through 2022. The terms of the lease agreements generally provide for rental payments on a graduated basis, and certain leases require the Company to pay its portion of executory costs such as taxes, insurance, and operating expenses. The Company recognizes rent expense on a straight-line basis over the lease term.
Rent expense for 2014, 2013 and 2012 was $2.6 million, $2.6 million and $2.4 million, respectively.
The Company’s minimum lease payments under noncancelable operating leases, exclusive of executory costs, as of December 31, 2014 are as follows (in thousands):
|
| | | |
2015 | $ | 1,980 |
|
2016 | 2,120 |
|
2017 | 1,918 |
|
2018 | 1,973 |
|
2019 | 2,032 |
|
Thereafter | 5,051 |
|
Total minimum lease payments | $ | 15,074 |
|
Purchase Obligations—The Company has contractual obligations to purchase goods and services, which specify fixed or minimum quantities to be purchased; fixed, minimum, or variable price provisions; and the approximate timing of the transaction. Purchase obligations do not include contracts that may be canceled without significant penalty. As of
December 31, 2014, the Company had purchase obligations with third party manufacturers and suppliers totaling approximately $36.8 million.
Contingencies —From time to time, the Company may be involved in litigation relating to claims arising out of its operations. The Company is not currently involved in any material legal proceedings. The Company may, however, be involved in material legal proceedings in the future. Such matters are subject to uncertainty and there can be no assurance that such legal proceedings will not have a material adverse effect on its business, results of operations, financial position or cash flows.
11. STOCKHOLDERS' EQUITY
Initial Public Offering
On April 4, 2012, the Company completed its initial public offering (“IPO”), issuing 10,315,151 shares of common stock at an offering price of $6.00 per share. The net proceeds from the sale of the shares were $53.8 million, after deducting the underwriters’ discounts and commissions of $3.3 million and other offering costs of $4.8 million. Upon consummation of the IPO, the Company’s 22,220,856 outstanding shares of convertible preferred stock ($93.6 million carrying value) were automatically converted into 25,171,017 shares of common stock, and the $21.2 million outstanding balance of principal and accrued paid-in-kind interest in convertible notes were automatically converted into 3,533,988 shares of common stock at a conversion price equal to the IPO price of $6.00 per share. As a result, the Company recorded a charge of $2.8 million to interest expense in 2012 for the extinguishment of debt related to the unamortized debt issuance costs and debt discounts.
Common Stock Warrants
Prior to its IPO, the Company issued convertible preferred stock warrants in connection with several financing transactions. These warrants automatically converted into warrants to purchase common stock upon the consummation of the IPO.
As of December 31, 2014, warrants to purchase 111,183 shares of the Company’s common stock remained outstanding with a weighted average exercise price of $5.27. Such warrants are exercisable at any time and have expiration dates in 2016.
12. STOCK-BASED COMPENSATION
Description of Equity Incentive Plans
2006 Plan
Under the Company’s 2006 Equity Incentive Plan (the “2006 Plan”), equity awards granted generally vest over a four-year period from the date of grant with a contractual term of up to 10 years. As of December 31, 2014, there were 4.5 million shares of common stock outstanding under the 2006 Plan. No further stock options or other stock awards may be granted under the 2006 Plan.
2011 Plan
Under the 2011 Equity Incentive Plan (the “2011 Plan”), the Company may, initially, issue up to 2,643,171 shares of its common stock pursuant to stock options, stock appreciation rights, restricted stock awards, restricted stock unit awards, performance-based stock awards, and other forms of equity compensation, or collectively, stock awards, all of which may be granted to employees, including officers, and to non-employee directors and consultants. Options granted under the 2011 Plan before August 1, 2012 generally expire 10 years after the grant date and options granted thereafter generally expire 7 years after the grant date. Equity awards granted under the 2011 Plan generally vest over a four-year period from the date of grant based on continued employment. The number of shares of the Company’s common stock authorized for issuance under the 2011 Plan will automatically increase, on each January 1, by 4.5% of the total number of shares of the Company’s common stock outstanding on December 31 of the preceding calendar year, or such lesser number of shares of common stock as determined by the board of directors. As of December 31, 2014, 208,485 shares of common stock remained available for issuance pursuant to future grants under the 2011 Plan. On January 1, 2015, the shares authorized for issuance under the 2011 Plan automatically increased by 1,968,909 shares.
2011 Employee Stock Purchase Plan
The 2011 Employee Stock Purchase Plan (“ESPP”) became effective immediately upon the execution and delivery of the underwriting agreement for the Company’s IPO on March 29, 2012. The ESPP initially authorizes the issuance of 669,603 shares of the Company’s common stock pursuant to purchase rights granted to employees. The number of shares of common stock reserved for issuance will automatically increase, on each January 1, by 330,396 shares of the Company’s common stock or a lesser number of shares of common stock as determined by the Company’s board of directors.
The ESPP is implemented by concurrent offering periods and each offering period may contain up to four interim purchase periods. In general, offering periods consists of the 24 months periods commencing on each May 1 and November 1 of a calendar year.
Generally, all full time employees, including executive officers, are eligible to participate in the ESPP. The ESPP permits eligible employees to purchase the Company’s common stock through payroll deductions, which may not exceed 15% of the employee’s total compensation subject to certain limits. Stock may be purchased under the plan at a price equal to 85% of the fair market value of the Company’s stock on either the date of purchase or the first day of an offering period, whichever is lower. A two year look-back feature in the Company’s ESPP causes an offering period to reset if the fair value of the Company’s common stock on a purchase date is less than that on the initial offering date for that offering period. The reset feature, when triggered, will be accounted for as a modification to the original offering, resulting in additional expense to be recognized over the 24-month period of the new offering. During any calendar year, participants may not purchase shares of common stock having a value greater than $25,000, based on the fair market value per share of the common stock at the beginning of an offering period.
As of December 31, 2014, there were 534,674 shares of the Company’s common stock available for issuance under the ESPP. On January 1, 2015, the shares authorized for issuance under the ESPP automatically increased by 330,396 shares.
Valuation of Equity Awards
Stock Options
The fair value of each option granted was estimated on the date of grant using the Black-Scholes option-pricing model with the following assumptions:
| |
• | Expected term—The expected term of the option awards represents the period of time between the grant date of the option awards and the date the option awards are either exercised, converted or canceled, including an estimate for those option awards still outstanding. The Company used the simplified method, as permitted by the SEC for companies with a limited history of stock option exercise activity, to determine the expected term for its option grants. |
| |
• | Expected volatility—The expected stock price volatility for option awards granted prior to March 31, 2014 was determined based on an average of the historical volatilities of the common stock of several peer companies with characteristics similar to those of the Company. For option awards granted after March 31, 2014, the Company used a blended volatility estimate consisting of its own historical share price volatility (as the Company had at least two years of historical stock price data) augmented with historical volatility of peer companies for periods preceding the Company’s initial public offering such that the time period over which historical volatility data used was at least equal to the expected term of the option award. |
| |
• | Risk-free interest rate—The risk-free interest rate was based on the U.S. Treasury yield curve in effect at the time of grant and with a maturity that approximated the Company’s expected term. |
| |
• | Dividend yield—The dividend yield was based on the Company’s dividend history and the anticipated dividend payout over its expected term. |
A summary of the weighted-average assumptions used to estimate the fair values of the stock options granted during the periods presented is as follows:
|
| | | | | | | | | | | | |
| | Years Ended December 31, |
| | 2014 | | 2013 | | 2012 |
Expected term (in years) | | 4.5 |
| | 4.4 |
| | 5.7 |
|
Expected volatility | | 67.7 | % | | 68.4 | % | | 74.5 | % |
Annual risk-free rate of return | | 1.4 | % | | 1.0 | % | | 0.9 | % |
Dividend yield | | — | % | | — | % | | — | % |
Weighted-average fair value on grant date | | $ | 5.64 |
| | $ | 3.84 |
| | $ | 4.69 |
|
Restricted Stock Units
The fair value of restricted stock units granted is determined based on the price of the Company’s common stock on the date of grant.
Stock-Based Compensation Expense
The Compensation cost for all stock-based awards expected to vest is measured at fair value on the date of grant and recognized ratably over the requisite service period. The following table summarizes the components of total stock-based compensation expense included in the consolidated statements of operations for the periods presented (in thousands):
|
| | | | | | | | | | | | |
| | Years Ended December 31, |
| | 2014 | | 2013 | | 2012 |
Cost of revenues | | $ | 816 |
| | $ | 438 |
| | $ | 196 |
|
Research and development | | 3,127 |
| | 2,110 |
| | 1,728 |
|
Sales and marketing | | 2,487 |
| | 1,812 |
| | 1,254 |
|
General and administrative | | 3,310 |
| | 2,489 |
| | 1,588 |
|
Total stock-based compensation expense | | $ | 9,740 |
| | $ | 6,849 |
| | $ | 4,766 |
|
A summary of stock-based compensation expense associated with each type of award for the periods presented is as follows (in thousands):
|
| | | | | | | | | | | | |
| | Years Ended December 31, |
| | 2014 | | 2013 | | 2012 |
Stock options and restricted stock units | | $ | 8,845 |
| | $ | 6,314 |
| | $ | 4,519 |
|
ESPP | | 895 |
| | 535 |
| | 247 |
|
Total stock-based compensation expense | | $ | 9,740 |
| | 6,849 |
| | $ | 4,766 |
|
As of December 31, 2014, there was approximately $20.4 million of total unrecognized compensation cost related to unvested equity awards, net of expected forfeitures, which is expected to be recognized over a weighted-average period of 2.7 years.
No income tax benefit has been recognized relating to stock-based compensation expense and no tax benefits have been realized from exercised stock options.
Equity Awards Activity
Stock Options
A summary of the Company’s stock option activity for the periods presented is as follows (in thousands, except per share data):
|
| | | | | | |
| Shares | | Weighted- Average Exercise Price per Share |
Options outstanding — December 31, 2011 | 6,256 |
| | $ | 1.83 |
|
Granted | 2,478 |
| | 7.35 |
|
Exercised | (59 | ) | | 1.26 |
|
Canceled | (506 | ) | | 5.55 |
|
Options outstanding — December 31, 2012 | 8,169 |
| | 3.28 |
|
Granted | 1,506 |
| | 7.17 |
|
Exercised | (822 | ) | | 1.69 |
|
Canceled | (344 | ) | | 7.74 |
|
Options outstanding — December 31, 2013 | 8,509 |
| | 3.94 |
|
Granted | 1,311 |
| | 10.36 |
|
Exercised | (886 | ) | | 4.33 |
|
Canceled | (302 | ) | | 7.58 |
|
Options outstanding — December 31, 2014 | 8,632 |
| | 4.75 |
|
The following table summarizes information about stock options outstanding at December 31, 2014:
|
| | | | | | | | | | | | | | | | |
| | Options Outstanding | | Options Exercisable |
Range of Exercise Prices | | Number of Shares (in thousands) | | Weighted- Average Remaining Life (in years) | | Weighted- Average Exercise Price | | Number of Shares (in thousands) | | Weighted- Average Exercise Price |
$0.27 —– $0.27 | | 2,304 |
| | 4.5 | | $ | 0.27 |
| | 2,304 |
| | $ | 0.27 |
|
$0.64 —– $2.54 | | 1,730 |
| | 5.4 | | 1.66 |
| | 1,716 |
| | 1.66 |
|
$3.35 —– $7.44 | | 1,820 |
| | 6.1 | | 6.15 |
| | 965 |
| | 6.04 |
|
$7.50 —– $9.53 | | 1,839 |
| | 6.3 | | 8.21 |
| | 844 |
| | 8.35 |
|
$9.54 —– $16.01 | | 939 |
| | 6.7 | | 11.91 |
| | 127 |
| | 10.77 |
|
Total | | 8,632 |
| | 5.6 | | 4.75 |
| | 5,956 |
| | 2.96 |
|
The intrinsic value of options exercised in 2014, 2013 and 2012 was $5.5 million, $3.2 million and $0.3 million, respectively. As of December 31, 2014, there were 8.4 million options outstanding that were vested and expected to vest. Such options have a weighted-average exercise price of $4.66 and a weighted-average remaining contractual term of 5.6 years. As of December 31, 2014, the aggregate intrinsic value was $67.4 million for the 6.0 million exercisable shares. The intrinsic value is based on the Company’s common stock fair value of $14.29 per share as of December 31, 2014.
Restricted Stock Units
A summary of restricted stock unit activity for the periods presented is as follows: (in thousands, except per share data):
|
| | | | | | |
| Restricted Stock Units | | Weighted Average Fair Value per Share at Grant Date |
Outstanding at December 31, 2011 | — |
| | $ | — |
|
Granted | 282 |
| | 5.69 |
|
Vested | (20 | ) | | 2.00 |
|
Canceled | (14 | ) | | 6.90 |
|
Outstanding at December 31, 2012 | 248 |
| | 5.53 |
|
Granted | 285 |
| | 6.92 |
|
Vested | (107 | ) | | 6.08 |
Canceled | (8 | ) | | 7.07 |
Outstanding at December 31, 2013 | 418 |
| | 6.31 |
|
Granted | 1,250 |
| | 8.68 |
|
Vested | (281 | ) | | 7.38 |
|
Canceled | (42 | ) | | 7.56 |
|
Outstanding at December 31, 2014 | 1,345 |
| | 8.25 |
|
The intrinsic value of restricted stock units vested during 2014, 2013 and 2012 was $3.2 million, $0.8 million and $39,000, respectively. As of December 31, 2014, the restricted stock units outstanding had a weighted average remaining contractual term of 1.6 years with an intrinsic value of $19.2 million.
ESPP
A summary of ESPP activity for the years presented is as follows: (in thousands, except per share data):
|
| | | | | | | | | | | | |
| | Years Ended December 31, |
| | 2014 | | 2013 | | 2012 |
Proceeds from common stock issued under ESPP | | $ | 1,531 |
| | $ | 1,047 |
| | $ | 185 |
|
Shares of common stock issued | | 410 |
| | 327 |
| | 59 |
|
Weighted-average price per share | | $ | 3.73 |
| | $ | 3.20 |
| | $ | 3.14 |
|
13. INCOME TAXES
The domestic and foreign components of loss before provision for income taxes consisted of the following (in thousands): |
| | | | | | | | | | | |
| Years Ended December 31, |
| 2014 | | 2013 | | 2012 |
United States | $ | (8,732 | ) | | $ | (26,118 | ) | | $ | (38,539 | ) |
Foreign | 1,446 |
| | 1,068 |
| | 972 |
|
Total | $ | (7,286 | ) | | $ | (25,050 | ) | | $ | (37,567 | ) |
The provision for income taxes for the years presented is as follows (in thousands): |
| | | | | | | | | | | |
| Year Ended December 31, |
| 2014 | | 2013 | | 2012 |
Current: | | | | | |
Federal | $ | — |
| | $ | — |
| | $ | — |
|
State | 85 |
| | — |
| | — |
|
Foreign | 716 |
| | 865 |
| | 651 |
|
Total | 801 |
| | 865 |
| | 651 |
|
Deferred: |
| | | | |
Federal | — |
| | — |
| | — |
|
State | — |
| | — |
| | — |
|
Foreign | (35 | ) | | (2 | ) | | — |
|
Provision for income taxes | $ | 766 |
| | $ | 863 |
| | $ | 651 |
|
A reconciliation of the provision for income taxes and the amount computed by applying the statutory federal income tax rate of 34% to loss before income taxes for the years presented is as follows (in thousands):
|
| | | | | | | | | | | |
| Year Ended December 31, |
| 2014 | | 2013 | | 2012 |
Income tax benefit at statutory federal rate | $ | (2,477 | ) | | $ | (8,517 | ) | | $ | (12,773 | ) |
State taxes, net of federal benefit | (4,576 | ) | | (883 | ) | | (1,478 | ) |
Change in valuation allowance | 16,646 |
| | 8,353 |
| | 12,574 |
|
Foreign tax rate and tax law differential | (43 | ) | | 237 |
| | 147 |
|
Tax credits | (5,619 | ) | | — |
| | — |
|
Stock-based compensation | 957 |
| | 1,191 |
| | 1,128 |
|
Other permanent items | 231 |
| | 220 |
| | 860 |
|
Other nondeductible/nontaxable items | (4,586 | ) | | (2 | ) | | 20 |
|
Uncertain tax positions | 233 |
| | 264 |
| | 173 |
|
Provision for income taxes | $ | 766 |
| | $ | 863 |
| | $ | 651 |
|
A summary of significant components of the Company’s deferred tax assets and liabilities as of December 31, 2014 and 2013 is as follows (in thousands):
|
| | | | | | | |
| December 31, |
| 2014 | | 2013 |
Deferred Tax Assets | | | |
Allowances and reserves | $ | 18,771 |
| | $ | 14,521 |
|
Net operating loss and tax credit carryforwards | 28,511 |
| | 16,840 |
|
Stock-based compensation | 2,154 |
| | 1,531 |
|
Deferred revenue | 3,843 |
| | 2,730 |
|
Fixed assets and intangibles | 9,163 |
| | 11,670 |
|
Other | 2,023 |
| | 476 |
|
Total gross deferred tax assets | 64,465 |
| | 47,768 |
|
Less valuation allowance | (64,428 | ) | | (47,766 | ) |
Deferred tax assets, net of valuation allowance | 37 |
| | 2 |
|
Deferred tax liabilities | — |
| | — |
|
Net deferred tax assets, net of valuation allowance | $ | 37 |
| | $ | 2 |
|
Accounting for income taxes requires that companies assess whether valuation allowances should be established against their deferred tax assets based on consideration of all available evidence, both positive and negative, using a “more likely than not” standard. This assessment considers, among other matters, the nature, frequency and amount of recent losses, the duration of statutory carryforward periods, and tax planning strategies. In making such judgments, significant weight is given to evidence that can be objectively verified. Due to the history of losses the Company has generated in the United States since inception, the Company believes that it is more-likely-than-not that all of its U.S. and state deferred tax assets will not be realized as of December 31, 2014. Therefore, the Company has recorded a full valuation allowance on its U.S. and state deferred tax assets at December 31, 2014. Should the Company determine that it would be able to realize its deferred tax assets in the foreseeable future, an adjustment to the deferred tax assets may cause a material increase to income in the period such determination is made. Significant management judgment is required in determining the period in which the reversal of a valuation allowance should occur.
The Company considers the earnings of certain non-U.S. subsidiaries to be indefinitely invested outside the United States on the basis of estimates that future domestic cash generation will be sufficient to meet future domestic cash needs and the Company’s specific plans for reinvestment of those subsidiary earnings. Accordingly, the Company has not recorded a deferred tax liability related to the U.S. federal and state income taxes and foreign withholding taxes on approximately $2.6 million of undistributed earnings of foreign subsidiaries indefinitely invested outside the United States. If such earnings were repatriated, additional tax provisions may result.
The Company has net operating loss carryforwards for federal and California income tax purposes of approximately $52.9 million and $44.6 million, respectively, as of December 31, 2014. The federal and state net operating loss carryforwards, if not utilized, will expire beginning in 2026 and 2016, respectively. Utilization of the net operating loss carryforwards may be subject to a substantial annual limitation due to the ownership change limitations provided by the Internal Revenue Code of 1986, as amended (the “Code”), and similar state provisions. The annual limitation may result in the expiration of net operating losses before utilization. The Company has completed a study to assess whether an ownership change has occurred or whether there have been multiple ownership changes since the Company became a loss corporation under the Code. However, the Company does not anticipate these limitations will significantly impact its ability to utilize the net operating losses and tax credit carryforwards.
The Company has approximately $7.5 million of federal research credit and $7.2 million of state research credit carryforwards. The federal credits begin to expire in 2026 and the state credits can be carried forward indefinitely.
As a result of certain realization requirements under income tax accounting for stock-based compensation, the table of deferred tax assets and liabilities shown above does not include certain deferred tax assets as of December 31, 2014 and 2013 that arose directly from tax deductions related to equity compensation greater than compensation recognized for financial reporting. Equity will be increased by $1.3 million if and when such deferred tax assets are ultimately realized.
The accounting for uncertain tax positions prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken in a tax return. The Company is required to recognize in the financial statements the impact of a tax position, if that position is more-likely-than-not of being sustained on audit, based on the technical merits of the position. There were no significant unrecognized tax benefits recorded upon adoption and the change to the unrecognized tax benefits in 2014 was $4.0 million.
The Company does not have any tax positions for which it is reasonably possible the total amount of gross unrecognized tax benefits will increase or decrease over the next year. The unrecognized tax benefits may increase or change during the next year for items that arise in the ordinary course of business. The Company recognizes interest and penalties related to uncertain tax positions in income tax expense.
A tabular reconciliation of the total amounts of unrecognized tax benefits for the years presented is as follows (in thousands):
|
| | | | | | | | | | | |
| Year Ended December 31, |
| 2014 | | 2013 | | 2012 |
Unrecognized tax benefits—at beginning of year | $ | 376 |
| | $ | 160 |
| | $ | — |
|
Increases in balances related to tax positions taken in prior years | 1,895 |
| | 79 |
| | — |
|
Increases in balances related to tax positions taken in current year | 2,155 |
| | 137 |
| | 160 |
|
Unrecognized tax benefits—at end of year | 4,426 |
| | 376 |
| | 160 |
|
The Company’s tax returns continue to remain subject to examination by U.S. federal authorities for the years 2011 through 2014 and by California state authorities for the years 2010 through 2014.
14. CONCENTRATION OF CREDIT RISK AND MAJOR CUSTOMERS
The Company is potentially subject to financial instrument concentration of credit risk through its cash and cash equivalents and accounts receivable. The Company places its cash and cash equivalents with high quality institutions and performs periodic evaluations of their relative credit standing. Accounts receivable can be potentially exposed to a concentration of credit risk with its major customers. As of December 31, 2014, the Company had amounts due from two customers that represented 15% and 11% of the total accounts receivable balance. As of December 31, 2013, its two largest accounts receivable balances represented 16% and 10% of the total accounts receivable balance. In 2014, two customers accounted for 24% and 16% of total net revenues. In 2013, three customers accounted for 15%, 14% and 11% of total net revenues. In 2012, two customers accounted for 16% and 11% of total net revenues.
15. NET LOSS PER SHARE ATTRIBUTABLE TO COMMON STOCKHOLDERS
In April 2012, all of the Company’s then outstanding convertible preferred stock automatically converted into common stock in connection with its IPO. For periods that ended prior to the conversion, basic and diluted net income per common share were presented in conformity with the two-class method required for participating securities.
Under the two-class method, net loss is allocated between common shares and other participating securities to the extent that the securities are required to share in the losses. The Company’s convertible preferred stock did not meet the definition of a participating security in periods of net losses as the convertible preferred stockholders did not have a contractual obligation to share in the Company’s losses. Accordingly, net losses were attributable to common stockholders. Subsequent to the Company’s IPO and the automatic conversion of the outstanding convertible preferred stock, the Company had no other participating securities and the two-class method is no longer applicable.
Basic net loss per share attributable to common stockholders is calculated by dividing net loss attributable to common stockholders by the weighted average number of shares outstanding for the period. Diluted net loss per share attributable to common stockholders is calculated by dividing net loss attributable to common stockholders by the weighted average number of common shares and potential dilutive common share equivalents outstanding during the period if the effect is dilutive. The Company’s potentially dilutive common shares include convertible notes and convertible preferred stock prior to their conversion, outstanding stock options and warrants and non-vested restricted stock units.
The following table presents the potential common shares outstanding that were excluded from the computation of diluted net loss per share attributable to common stockholders for the periods presented because including them would have been anti-dilutive (in thousands):
|
| | | | | | | | |
| Years Ended December 31, |
| 2014 | | 2013 | | 2012 |
Stock options to purchase common stock | 8,502 |
| | 8,196 |
| | 8,174 |
|
Unvested restricted stock units | 1,258 |
| | 381 |
| | 248 |
|
Warrants to purchase common stock | 195 |
| | 308 |
| | 331 |
|
Total | 9,955 |
| | 8,885 |
| | 8,753 |
|
16. SEGMENT AND GEOGRAPHIC INFORMATION
The Company’s chief operating decision maker is the Chief Executive Officer. The Chief Executive Officer reviews financial information presented on a consolidated basis. The Company has one business activity, which entails the design, development, manufacture and sale of microinverter systems for the solar photovoltaic industry. There are no segment managers who are held accountable for operations, operating results or plans for levels or components below the consolidated unit level. Accordingly, management has determined that the Company has a single operating and reportable segment.
The following tables present net revenues (based on the destination of shipments) and long-lived assets by geographic region as of and for the periods presented (in thousands):
Net Revenues
|
| | | | | | | | | | | |
| Years Ended December 31, |
| 2014 | | 2013 | | 2012 |
United States | $ | 294,549 |
| | $ | 192,881 |
| | $ | 189,711 |
|
International | 49,355 |
| | 39,965 |
| | 26,967 |
|
Total | $ | 343,904 |
| | $ | 232,846 |
| | $ | 216,678 |
|
Long-Lived Assets
|
| | | | | | | | | | | |
| As of December 31, |
| 2014 | | 2013 | | 2012 |
United States | $ | 20,037 |
| | $ | 16,262 |
| | $ | 17,136 |
|
China | 9,585 |
| | 7,130 |
| | 6,642 |
|
Other | 1,202 |
| | 1,461 |
| | 1,763 |
|
Total | $ | 30,824 |
| | $ | 24,853 |
| | $ | 25,541 |
|
17. RELATED PARTY TRANSACTIONS
KPCB Holdings, Inc. (“KPCB”), as nominee for certain funds of Kleiner Perkins Caufield & Byers, owned approximately 9 percent of the Company’s outstanding stock as of December 31, 2014. Revenues recognized from sales of microinverters to entities that are majority-owned by KPCB entities in 2013 and 2012 were $2.7 million and $16.8 million respectively. There were no sales to these entities in 2014.
ENPHASE ENERGY, INC.
Quarterly Financial Information
(Unaudited)
(In thousands, except per share data)
|
| | | | | | | | | | | | | | | |
| Quarters Ended for Fiscal 2014 |
| March 31 | | June 30 | | September 30 | | December 31 |
| | | | | | | |
Net revenues | $ | 57,580 |
| | $ | 82,004 |
| | $ | 99,113 |
| | $ | 105,207 |
|
Cost of revenues | 38,925 |
| | 55,172 |
| | 66,592 |
| | 70,172 |
|
Gross profit | 18,655 |
| | 26,832 |
| | 32,521 |
| | 35,035 |
|
Operating expenses: | | | | | | | |
Research and development | 9,086 |
| | 11,148 |
| | 12,112 |
| | 13,040 |
|
Sales and marketing | 8,828 |
| | 10,493 |
| | 9,884 |
| | 11,798 |
|
General and administrative | 6,526 |
| | 7,679 |
| | 8,632 |
| | 8,246 |
|
Total operating expenses | 24,440 |
| | 29,320 |
| | 30,628 |
| | 33,084 |
|
Income (loss) from operations | (5,785 | ) | | (2,488 | ) | | 1,893 |
| | 1,951 |
|
Other expense, net | (342 | ) | | (428 | ) | | (953 | ) | | (1,134 | ) |
Income (loss) before income taxes | (6,127 | ) | | (2,916 | ) | | 940 |
| | 817 |
|
Provision for income taxes | (109 | ) | | (115 | ) | | (127 | ) | | (415 | ) |
Net income (loss) | $ | (6,236 | ) | | $ | (3,031 | ) | | $ | 813 |
| | $ | 402 |
|
Net income (loss) per share, basic | $ | (0.15 | ) | | $ | (0.07 | ) | | $ | 0.02 |
| | $ | 0.01 |
|
Net income (loss) per share, diluted | $ | (0.15 | ) | | $ | (0.07 | ) | | $ | 0.02 |
| | $ | 0.01 |
|
| | | | | | | |
| Quarters Ended for Fiscal 2013 |
| March 31 | | June 30 | | September 30 | | December 31 |
Net revenues | $ | 45,577 |
| | $ | 58,167 |
| | $ | 62,046 |
| | $ | 67,056 |
|
Cost of revenues | 33,376 |
| | 41,883 |
| | 44,611 |
| | 45,560 |
|
Gross profit | 12,201 |
| | 16,284 |
| | 17,435 |
| | 21,496 |
|
Operating expenses: | | | | | | | |
Research and development | 9,026 |
| | 8,484 |
| | 8,293 |
| | 8,721 |
|
Sales and marketing | 6,850 |
| | 7,365 |
| | 8,550 |
| | 8,315 |
|
General and administrative | 6,036 |
| | 5,926 |
| | 5,937 |
| | 6,071 |
|
Total operating expenses | 21,912 |
| | 21,775 |
| | 22,780 |
| | 23,107 |
|
Loss from operations | (9,711 | ) | | (5,491 | ) | | (5,345 | ) | | (1,611 | ) |
Other expense, net | (513 | ) | | (781 | ) | | (815 | ) | | (783 | ) |
Loss before income taxes | (10,224 | ) | | (6,272 | ) | | (6,160 | ) | | (2,394 | ) |
Provision for income taxes | (182 | ) | | (124 | ) | | (141 | ) | | (416 | ) |
Net loss | $ | (10,406 | ) | | $ | (6,396 | ) | | $ | (6,301 | ) | | $ | (2,810 | ) |
Net loss per share, basic | $ | (0.25 | ) | | $ | (0.15 | ) | | $ | (0.15 | ) | | $ | (0.07 | ) |
Net loss per share, diluted | $ | (0.25 | ) | | $ | (0.15 | ) | | $ | (0.15 | ) | | $ | (0.07 | ) |
Item 9. Changes in and Disagreements with Accountants on Accounting and Financial Disclosure
None.
Item 9A. Controls and Procedures
Evaluation of Disclosure Controls and Procedures
We carried out an evaluation required by the Exchange Act, under the supervision and with the participation of our principal executive officer and principal financial officer, of the effectiveness of the design and operation of our disclosure controls and procedures, as defined in Rule 13a-15(e) of the Exchange Act, as of the end of the period covered by this report. Based on this evaluation, our principal executive officer and principal financial officer concluded that our disclosure controls and procedures were effective to provide reasonable assurance that information required to be disclosed by us in the reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission’s rules and forms and to provide reasonable assurance that such information is accumulated and communicated to our management, including our principal executive officer and principal financial officer, as appropriate to allow timely decisions regarding required disclosures.
Management’s Report on Internal Control over Financial Reporting
Management is responsible for establishing and maintaining adequate internal control over financial reporting in providing reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles, as defined in Rule 13a-15(f) of the Exchange Act. Management has assessed the effectiveness of our internal control over financial reporting as of December 31, 2014 based on criteria set forth in Internal Control – Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013). As a result of this assessment, management concluded that, as of December 31, 2014, our internal control over financial reporting was effective.
We are an “emerging growth company” as defined in the Jumpstart Our Business Startups Act, or JOBS Act. As a result, we are exempt from the auditor attestation requirements related to internal controls over financial reporting pursuant to Section 404 of the Sarbanes-Oxley Act. In addition, for as long as we remain an “emerging growth company,” we will continue to be exempt from the auditor attestation requirement in the assessment of the effectiveness of our internal control over financial reporting through the end of fiscal 2017.
Changes in Internal Control over Financial Reporting
There were no changes in our internal control over financial reporting that occurred during the most recent fiscal quarter ended December 31, 2014 that materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
Limitations on Controls
Our disclosure controls and procedures and internal control over financial reporting are designed to provide reasonable assurance of achieving their objectives as specified above. Management does not expect, however, that our disclosure controls and procedures or our internal control over financial reporting will prevent or detect all errors and fraud. Any control system, no matter how well designed and operated, is based upon certain assumptions and can provide only reasonable, not absolute, assurance that its objectives will be met. Further, no evaluation of controls can provide absolute assurance that misstatements due to error or fraud will not occur or that all control issues and instances of fraud, if any, within the Company have been detected.
Item 9B. Other Information
None.
PART III
Item 10. Directors and Executive Officers and Corporate Governance
The information required regarding our directors is incorporated herein by reference from the information contained in the section entitled “Proposal 1-Election of Directors” in our definitive Proxy Statement for the 2015 Annual Meeting of Stockholders (our “Proxy Statement”), a copy of which will be filed with the Securities and Exchange Commission on or before April 30, 2015.
The information required regarding our executive officers is incorporated herein by reference from the information contained in the section entitled “Management” in our Proxy Statement.
The information required regarding Section 16(a) beneficial ownership reporting compliance is incorporated by reference from the information contained in the section entitled “Section 16(a) Beneficial Ownership Reporting Compliance” in our Proxy Statement.
The information required with respect to procedures by which security holders may recommend nominees to our board of directors, and the composition of our Audit Committee, and whether we have an “audit committee financial expert,” is incorporated by reference from the information contained in the section entitled “Information Regarding the Board of Directors and Corporate Governance” in our Proxy Statement.
Code of Conduct
We have a written code of conduct that applies to all our executive officers, directors and employees. Our Code of Conduct is available on our website at http://investor.enphase.com/governance.cfm. A copy of our Code of Conduct may also be obtained free of charge by writing to our Assistant Secretary, Enphase Energy, Inc., 1420 N. McDowell Blvd., Petaluma, CA 94954. If we make any substantive amendments to our Code of Conduct or grant any waiver from a provision of the Code of Conduct to any executive officer or director, we intend to promptly disclose the nature of the amendment or waiver on our website.
Item 11. Executive Compensation
The information required regarding the compensation of our directors and executive officers is incorporated herein by reference from the information contained in the sections entitled “Executive Compensation,” “Director Compensation,” “Compensation Committee Report” and “Compensation Committee Interlocks and Insider Participation” in our Proxy Statement.
Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters
The information required regarding security ownership of our 5% or greater stockholders and of our directors and management is incorporated herein by reference from the information contained in the section entitled “Security Ownership of Certain Beneficial Owners and Management” in our Proxy Statement.
Equity Compensation Plan Information
The information required regarding securities authorized for issuance under our equity compensation plans is incorporated herein by reference from the information contained in the section entitled “Employee Benefit Plans” in our Proxy Statement.
Item 13. Certain Relationships and Related Transactions, and Director Independence
The information required regarding related transactions is incorporated herein by reference from the information contained in the section entitled “Transactions With Related Persons” and, with respect to director independence, the section entitled “Proposal 1-Election of Directors” in our Proxy Statement.
Item 14. Principal Accounting Fees and Services
The information required is incorporated herein by reference from the information contained in the sections entitled “Principal Accountant Fees and Services” and “Pre-Approval Policies and Procedures” in the section entitled “Proposal 2-Ratification of Selection of Independent Registered Public Accounting Firm” in our Proxy Statement.
PART IV
Item 15. Exhibits, Financial Statement Schedules
Consolidated Financial Statements
The information concerning our consolidated financial statements, and Report of Independent Registered Public Accounting Firm required by this Item is incorporated by reference herein to the section of this Annual Report on Form 10-K in Item 8, Consolidated Financial Statements and Supplementary Data.
No schedules are provided because they are not applicable, not required under the instructions, or the requested information is shown in the financial statements or related notes thereto.
Exhibits
The exhibits listed in the accompanying index to exhibits are filed or incorporated by reference as part of this Annual Report on Form 10-K.
SIGNATURES
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized on March 3, 2015.
|
| | | |
| | Enphase Energy, Inc. |
| | | |
| | By: | /s/ PAUL B. NAHI |
| | | Paul B. Nahi President and Chief Executive Officer |
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS, that each person whose signature appears below constitutes and appoints Paul B. Nahi and Kris Sennesael, jointly and severally, as his true and lawful attorneys-in-fact and agents, with full power of substitution and resubstitution, for him and in his name, place and stead, in any and all capacities, to sign any and all amendments to this Annual Report on Form 10-K and to file the same, with all exhibits thereto, and other documents in connection therewith, with the Securities and Exchange Commission, granting unto said attorneys-in-fact and agents full power and authority to do and perform each and every act and thing requisite or necessary to be done in and about the premises hereby ratifying and confirming all that said attorneys-in-fact and agents, or his substitute or substitutes, may lawfully do or cause to be done by virtue hereof.
Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities on the dates indicated.
|
| | | | |
Signature | | Title | | Date |
| | | | |
/s/ PAUL B. NAHI | | President and Chief Executive Officer (Principal Executive Officer) | | March 3, 2015 |
Paul B. Nahi | | | |
| | | | |
/s/ KRIS SENNESAEL | | Vice President and Chief Financial Officer (Principal Financial and Accounting Officer) | | March 3, 2015 |
Kris Sennesael | | | |
| | | | |
/s/ NEAL DEMPSEY | | Director | | March 3, 2015 |
Neal Dempsey | | | | |
| | | | |
/s/ STEVEN J. GOMO | | Director | | March 3, 2015 |
Steven J. Gomo | | | | |
| | | | |
/s/ BENJAMIN KORTLANG | | Director | | March 3, 2015 |
Benjamin Kortlang | | | | |
| | | | |
/s/ JAMESON J. MCJUNKIN | | Director | | March 3, 2015 |
Jameson J. McJunkin | | | | |
| | | | |
/s/ RICHARD MORA | | Director | | March 3, 2015 |
Richard Mora | | | | |
| | | | |
/s/ ROBERT SCHWARTZ | | Director | | March 3, 2015 |
Robert Schwartz | | | | |
| | | | |
/s/ JOHN H. WEBER | | Director | | March 3, 2015 |
John H. Weber | | | | |
EXHIBIT INDEX
|
| | | | | | | | | | | | |
| | | | Incorporation by Reference |
Exhibit Number | | Exhibit Description | | Form | | SEC File No. | | Exhibit | | Filing Date | | Filed Herewith |
| | | | | | | | | | | | |
3.1 | | Amended and Restated Certificate of Incorporation of Enphase Energy, Inc. | | 8-K | | 001-35480 | | 3.1 | | 4/6/2012 | | |
| | | | | | | | | | | | |
3.2 | | Amended and Restated Bylaws of Enphase Energy, Inc. | | S-1/A | | 333-174925 | | 3.5 | | 3/12/2012 | | |
| | | | | | | | | | | | |
4.1 | | Specimen Common Stock Certificate of Enphase Energy, Inc. | | S-1/A | | 333-174925 | | 4.1 | | 3/12/2012 | | |
| | | | | | | | | | | | |
4.2 | | 2010 Amended and Restated Investors’ Rights Agreement by and between Enphase Energy, Inc. and the investors listed on Exhibit A thereto, dated March 15, 2010, as amended. | | S-1/A | | 333-174925 | | 4.2 | | 3/12/2012 | | |
| | | | | | | | | | | | |
4.3 | | Form of June 2011 Warrant to Purchase Common Stock of Enphase Energy, Inc., pursuant to that certain Amended and Restated Subordinated Convertible Loan Facility and Security Agreement. | | S-1/A | | 333-174925 | | 4.7 | | 3/12/2012 | | |
| | | | | | | | | | | | |
4.4 | | Form of November 2011 Warrant to Purchase Common Stock of Enphase Energy, Inc., pursuant to that certain Amended and Restated Subordinated Convertible Loan Facility and Security Agreement. | | S-1/A | | 333-174925 | | 4.8 | | 3/12/2012 | | |
| | | | | | | | | | | | |
10.1 | | Form of Indemnification Agreement by and between Enphase Energy, Inc. and each of its directors and officers. | | S-1/A | | 333-174925 | | 10.1 | | 3/12/2012 | | |
| | | | | | | | | | | | |
10.2 | | 2006 Equity Incentive Plan, as amended, and related documents. + | | S-8 | | 333-181382 | | 99.1 | | 5/14/2012 | | |
| | | | | | | | | | | | |
10.3+ | | 2011 Equity Incentive Plan and forms of agreement thereunder. + | | S-8 | | 333-181382 | | 99.2 | | 5/14/2012 | | |
| | | | | | | | | | | | |
10.4+ | | 2011 Employee Stock Purchase Plan. + | | S-8 | | 333-181382 | | 99.3 | | 5/14/2012 | | |
| | | | | | | | | | | | |
10.5+ | | Offer Letter by and between Enphase Energy, Inc. and Paul B. Nahi, dated January 1, 2007, as amended. | | S-1/A | | 333-174925 | | 10.5 | | 3/12/2012 | | |
| | | | | | | | | | | | |
10.6+ | | Offer Letter by and between Enphase Energy, Inc. and Jeff Loebbaka, dated April 19, 2010. | | S-1/A | | 333-174925 | | 10.8 | | 3/12/2012 | | |
| | | | | | | | | | | | |
10.7 | | Redwood Business Park NNN Lease by and between Enphase Energy, Inc. and Sequoia Center LLC, dated June 3, 2011 (1400 North McDowell Boulevard), as amended. | | S-1/A | | 333-174925 | | 10.14 | | 3/12/2012 | | |
| | | | | | | | | | | | |
10.8 | | First Amendment to Redwood Business Park NNN Lease (1400 North McDowell Blvd), between Enphase Energy, Inc. & Sequoia Center LLC dated January 12, 2012. | | | | | | | | | | X |
| | | | | | | | | | | | |
10.9 | | Second Amendment to Redwood Business Park NNN Lease (1400 North McDowell Blvd), between Enphase Energy, Inc. & Sequoia Center LLC dated January 13, 2014. | | | | | | | | | | X |
| | | | | | | | | | | | |
10.10 | | Third Amendment to Redwood Business Park NNN Lease (1400 North McDowell Blvd), between Enphase Energy, Inc. & Sequoia Center LLC dated September 25, 2014. | | | | | | | | | | X |
| | | | | | | | | | | | |
10.11 | | Fourth Amendment to Redwood Business Park NNN Lease (1400 North McDowell Blvd), between Enphase Energy, Inc. & Sequoia Center LLC dated December 30, 2014. | | | | | | | | | | X |
| | | | | | | | | | | | |
10.12 | | Redwood Business Park NNN Lease by and between Enphase Energy, Inc. and Sequoia Center LLC, dated June 3, 2011 (1420 North McDowell Boulevard), as amended. | | S-1/A | | 333-174925 | | 10.15 | | 3/12/2012 | | |
| | | | | | | | | | | | |
10.13 | | First Amendment to Redwood Business Park NNN Lease (1420 North McDowell Blvd), between Enphase Energy, Inc. & Sequoia Center LLC dated January 12, 2012. | | | | | | | | | | X |
| | | | | | | | | | | | |
10.14 | | Second Amendment to Redwood Business Park NNN Lease (1420 North McDowell Blvd), between Enphase Energy, Inc. & Sequoia Center LLC, dated July 3, 2012. | | 10-Q | | 001-35480 | | 10.4 | | 11/13/2012 | | |
| | | | | | | | | | | | |
10.15 | | Third Amendment to Redwood Business Park NNN Lease (1420 North McDowell Blvd), between Enphase Energy, Inc. & Sequoia Center LLC dated May 14, 2014. | | | | | | | | | | X |
| | | | | | | | | | | | |
10.16 | | Cooperation Agreement “AC cabling system for solar micro-inverter” by and among Enphase Energy, Inc., and Phoenix Contact GmbH & Co. KG and Phoenix Contact USA, Inc., dated December 7, 2010. † | | S-1 | | 333-174925 | | 10.16 | | 6/15/2011 | | |
| | | | | | | | | | | | |
10.17 | | Flextronics Logistics Services Agreement by and between Enphase Energy, Inc. and Flextronics America, LLC, dated May 1, 2009. †† | | S-1 | | 333-174925 | | 10.17 | | 6/15/2011 | | |
| | | | | | | | | | | | |
10.18 | | Flextronics Manufacturing Services Agreement by and between Enphase Energy, Inc. and Flextronics Industrial, Ltd., dated March 1, 2009, as amended. †† | | S-1 | | 333-174925 | | 10.18 | | 6/15/2011 | | |
| | | | | | | | | | | | |
10.19 | | Master Development and Production Agreement by and between Enphase Energy, Inc. and Fujitsu Microelectronics America, Inc., dated August 19, 2009. †† | | S-1 | | 333-174925 | | 10.19 | | 6/15/2011 | | |
| | | | | | | | | | | | |
10.20 | | License and Technology Transfer Agreement by and between Enphase Energy, Inc. and Ariane Controls, Inc., dated December 21, 2007. †† | | S-1 | | 333-174925 | | 10.20 | | 6/15/2011 | | |
| | | | | | | | | | | | |
10.21 | | Software License Agreement by and between PVI Solutions, Inc. (subsequently known as Enphase Energy, Inc.) and DCD, Digital Core Design, dated May 8, 2007, as amended. †† | | S-1 | | 333-174925 | | 10.21 | | 6/15/2011 | | |
| | | | | | | | | | | | |
10.22 | | Non-employee Director Compensation Policy. + | | S-1/A | | 333-174925 | | 10.28 | | 3/12/2012 | | |
| | | | | | | | | | | | |
10.23 | | Offer Letter by and between Enphase Energy, Inc. and Kris Sennesael, dated September 17, 2012. + | | 10-Q | | 001-35480 | | 10.43 | | 11/13/2012 | | |
| | | | | | | | | | | | |
10.24 | | Credit Agreement by and among the lenders identified on the signature pages thereof, Wells Fargo Bank, N.A., as an agent for the lenders, and Enphase Energy, Inc. dated November 7, 2012. | | 8-K | | 001-35480 | | 10.1 | | 11/13/2012 | | |
| | | | | | | | | | | | |
10.25 | | 2014 Performance Bonus Program Summary. + | | 8-K | | 001-35480 | | 10.1 | | 3/12/2014 | | |
| | | | | | | | | | | | |
10.26 | | Severance and Change in Control Benefit Plan. | | 10-Q | | 001-35480 | | 10.49 | | 5/8/2013 | | |
| | | | | | | | | | | | |
10.27 | | Amendment No. 1 to Credit Agreement by and between Enphase Energy, Inc. and Wells Fargo Bank, National Association, dated February 14, 2014. | | 8-K | | 001-35480 | | 10.51 | | 2/18/2014 | | |
| | | | | | | | | | | | |
10.28 | | Long Term Product Supply Agreement, by and between the Company and Vivint Solar Developer LLC dated August 11, 2014. † | | 10-Q | | 001-35480 | | 10.1 | | 11/5/2014 | | |
| | | | | | | | | | | | |
21.1 | | List of subsidiaries of the Registrant | | | | | | | | | | X |
| | | | | | | | | | | | |
23.1 | | Consent of Deloitte & Touche LLP, Independent Registered Public Accounting Firm | | | | | | | | | | X |
| | | | | | | | | | | | |
24.1 | | Power of Attorney (incorporated by reference to the signature page of this Annual Report on Form 10-K). | | | | | | | | | | X |
| | | | | | | | | | | | |
31.1 | | Certification of Chief Executive Officer pursuant to Rule 13a-14(a)/15d-14(a). | | | | | | | | | | X |
| | | | | | | | | | | | |
31.2 | | Certification of Chief Financial Officer pursuant to Rule 13a-14(a)/15d-14(a). | | | | | | | | | | X |
| | | | | | | | | | | | |
32.1 | | Certification of Chief Executive Officer and Chief Financial Officer pursuant to 18 U.S.C. Section 1350 as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.* | | | | | | | | | | X |
| | | | | | | | | | | | |
101.INS | | XBRL Instance Document. | | | | | | | | | | X |
| | | | | | | | | | | | |
101.SCH | | XBRL Taxonomy Extension Schema Document. | | | | | | | | | | X |
| | | | | | | | | | | | |
101.CAL | | XBRL Taxonomy Extension Calculation Linkbase Document. | | | | | | | | | | X |
| | | | | | | | | | | | |
101.DEF | | XBRL Taxonomy Extension Definition Linkbase Document. | | | | | | | | | | X |
| | | | | | | | | | | | |
101.LAB | | XBRL Taxonomy Extension Label Linkbase Document. | | | | | | | | | | X |
| | | | | | | | | | | | |
101.PRE | | XBRL Taxonomy Extension Presentation Document. | | | | | | | | | | X |
| | | | | | | | | | | | |
| |
+ | Management compensatory plan or arrangement. |
| |
† | Material in the exhibit marked with a “***” has been omitted pursuant to a request for confidential treatment filed with the Securities and Exchange Commission. Omitted portions have been filed separately with the Securities and Exchange Commission. |
| |
†† | Portions of this Exhibit have been omitted and filed separately with the Securities and Exchange Commission as part of an application for confidential treatment. |
| |
* | The certifications attached as Exhibit 32.1 accompany this quarterly report on Form 10-K pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, and shall not be deemed “filed” by Enphase Energy, Inc. for purposes of Section 18 of the Securities Exchange Act of 1934, as amended. |
ENPH-2014.12.31-10K-EX10.08
FIRST AMENDMENT TO LEASE
(1400 N. McDowell Blvd.)
THIS FIRST AMENDMENT TO LEASE (this “Amendment”) dated as of January 12, 2012, is entered into between SEQUOIA CENTER LLC, a California limited liability company (“Landlord”) and ENPHASE ENERGY, INC., a Delaware corporation (“Tenant”).
THE PARTIES ENTER INTO THIS AMENDMENT based upon the following facts, understandings and intentions:
A. Landlord and Tenant previously entered into that certain Redwood Business Park NNN Lease dated as of June 3, 2011 (together with all exhibits thereto, the “Lease”) pursuant to which Tenant leases from Landlord the first floor of the building commonly known as 1400 N. McDowell Boulevard, Petaluma, California. Capitalized terms used herein and not defined herein shall have the meanings set forth in the Lease (including the Work Letter Agreement attached as Exhibit B thereto) in connection therewith.
B. Landlord and Tenant desire to make certain changes to the Lease as further provided herein.
NOW, THEREFORE, IN CONSIDERATION of the mutual covenants and promises of the parties, the receipt and adequacy of which are hereby acknowledged, the parties hereto agree as follows:
1. Estimated Commencement Date. The Estimated Commencement Date is hereby extended to April 10, 2012. Tenant acknowledges that Landlord may deliver the Premises to Tenant in the condition required by the Lease prior to the Estimated Commencement Date, and that in such event the Commencement Date shall occur prior to the Estimated Commencement Date on the date the Premises are Substantially Completed as defined in Section 13 of the Work Letter Agreement.
2. Approved Working Drawings. Landlord and Tenant hereby agree that the Working Drawings listed on Schedule 1 attached hereto shall be deemed the “Approved Working Drawings” under Section 2 of the Work Letter Agreement. Tenant shall either (a) modify the Approved Working Drawings to restore the roof access that would be eliminated per the Approved Working Drawings, or (b) install roof walking pads as reasonably determined by Landlord to allow full roof access from other access points, with such changes constituting a Tenant requested Change Order at Tenant's sole cost. Landlord shall have the right to direct changes to the Approved Working Drawings to effectuate the Change Order Requests listed on Exhibit C (the "COR's"). Such changes shall be subject to Tenant's approval, which shall not be unreasonably withheld, conditioned or delayed. Such changes directed by Landlord shall not constitute Tenant requested Change Orders. By way of example, Landlord shall specify the mesh material
contemplated in COR No. 31, and Tenant may suggest alternative materials but may not require a material that does not result in the savings contemplated in COR No. 31 .
3. Approved Budget. This Section 3 of this Amendment replaces and supersedes Section .3 of the Work Letter Agreement with respect to Tenant's budget approval for the Tenant Improvements to be constructed in the Premises, but the mechanism set forth in Section 3 of the Work Letter Agreement shall apply with respect to the construction of Tenant Improvements in the Expansion Space in the event Tenant exercises its expansion rights pursuant to Section 24 of the Lease. Tenant hereby approves the Tenant Improvement Summary attached hereto as Exhibit A (the “Approved Budget”), which is based on the Proposal from Vila Construction dated November 16, 2011 attached hereto as Exhibit B and the Approved Working Drawings referenced therein, as modified by the COR's (as so modified, the “Contractor Proposal”). In no event shall Tenant's Contribution (defined below) be increased because the Tenant Improvement Summary attached hereto as Exhibit A failed to include an item expressly and unambiguously required in the Approved Working Drawings, as modified by the COR's. For the purposes of clarity, the parties hereby agree that the Approved Working Drawings did not expressly and unambiguously require a water proofing membrane on the concrete slab on the first floor. The Approved Budget applies to the Premises as well as an additional 72,000 square feet of space located in the adjacent building having an address of 1420 N. McDowell Boulevard, Petaluma, California (the “Neighboring Building”).
4. Tenant Payment for Tenant Improvements. This Section 4 of this Amendment replaces and supersedes Section 6 of the Work Letter Agreement with respect to Tenant’s payment for Tenant Improvements to be constructed in the Premises, but the mechanism set forth in Section 6 of the Work Letter Agreement shall apply with respect to the construction of Tenant Improvements in the Expansion Space in the event Tenant exercises its expansion rights pursuant to Section 24 of the Lease. Tenant shall pay to Landlord $381,840.55, which represents Tenant's contribution to the portion of the Tenant Improvements described in the Approved Working Drawings and the COR's applicable to the Premises (i.e., 25% X $l,527,362.21) as more particularly set forth in the Approved Budget ("Tenant's Contribution"). Tenant shall pay such amount on the following schedule: 50% upon the mutual execution and delivery of this Amendment, 25% within ten (10) days following the delivery of the second and third floors of the Neighboring Building to Tenant in the condition required by the lease between Landlord and Tenant governing the Neighboring Building, and 25% within ten (10) days following the delivery of the Premises to Tenant in the condition required by the Lease. Notwithstanding anything to the contrary contained in the Work Letter Agreement, Landlord shall be responsible for any and all costs to perform such work in excess of Tenant's Contribution; provided (a) that (i) any changes by Tenant to the Approved Working Drawings or the COR's listed in Exhibit C, including without limitation changes contemplated in change order requests previously approved by Tenant but not included in the COR's listed in Exhibit C, and (ii) any additional costs resulting from errors or omissions in the Approved Working Drawings, shall constitute Change Orders per Section 8 of the Work Letter Agreement, and (b) that Tenant shall be solely responsible for the cost of procuring and installing any trade fixtures, equipment,
appliances, furniture, furnishings, telephone or computer equipment or wiring or other personal property. As provided in Section 9 of the Work Letter Agreement, all delays in Substantial Completion of the Tenant Improvements beyond the Estimated Commencement Date caused by Tenant requested Change Orders (including Change Orders resulting from errors or omissions in the Approved Working Drawings) shall constitute Tenant Delays. Notwithstanding the foregoing, Landlord shall be responsible for delays and costs resulting from an error or omission in the Approved Working Drawings that both (A) would not have been avoided by a licensed architect applying the standard of care customary in the industry, and (B) Vila Construction, applying the standard of care customary in the industry, should have nonetheless taken into account when preparing the estimate reflected in the Approved Budget. As an example, the following omission in the COR's would be the responsibility of Landlord: COR No. 12 calls for the removal of perimeter column drywall encasements, which resulted in exposure of the window side of the columns to daylight. Due to the opaque quality of glass and the original condition of the drywall encasement having a dark paint finish, this condition was not contemplated by Axia as warranting application of finish paint to that side of the columns despite Axia exercising customary care in the industry with respect to such encasement removal. When direct daylight is applied, however, the columns are somewhat apparent from the exterior, and Vila Construction, exercising customary care in estimating the cost of COR No. 12, should have included (and did include) the painting of the backside of the columns. Haley Recio, Matt Rudie, Russ Sweeney and Paul Nahi shall have authority to approve Change Orders and any Change Order approved in writing or by email by any such representative shall be binding upon Tenant. As an accommodation to Tenant, Landlord shall require payment for Change Orders for which Tenant is responsible within five (5) days following Tenant's notice to proceed with a Change Order rather than requiring prepayment as previously required by the Work Letter Agreement.
5. Toilet Partitions. Notwithstanding the allocation of responsibilities for costs set forth in Section 4 above, Landlord and Tenant agree that so long as Tenant does not make any improvements or other modifications to the restrooms serving the Premises, Landlord shall be responsible, at its sole cost, for all work in the restrooms required by the City of Petaluma to comply with the Americans with Disabilities Act (the "ADA"). If Tenant elects to make any improvements or other modifications to the restrooms that trigger any work to comply with ADA, such work shall constitute a Change Order at Tenant's sole cost.
6. Additional Drawings. On December 15, 2011, Tenant delivered to Landlord drawings and specifications dated December 13, 2011 prepared by Axia Architects (the "December 13 Drawings"), subject to review and approval by Landlord in accordance with Section 2 of the Work Letter Agreement. Tenant acknowledges that, subject to Landlord's timely compliance with the provisions of the Work Letter Agreement requiring Landlord to respond to drawings and specifications submitted for approval, any delays in Substantial Completion of the Tenant Improvements beyond the Estimated Commencement Date caused by any changes from the Approved Working Drawings or COR's that are required in the December 13 Drawings or caused by errors or omissions in either the Approved Working Drawings or the December 13 Drawings
shall constitute Tenant requested Change Orders as more fully set forth in Section 4 above.
7. Tenant Payment for Delay. Landlord and Tenant disagree as to who is responsible for the delay in the Estimated Commencement Date referenced in Section 1 above. Without either party admitting fault or liability, the parties have agreed to resolve such disagreement by Tenant paying to Landlord $88,199.01 concurrently with the execution and delivery of this Amendment. Such amount represents fifty percent (50%) of the rent that would have been payable under the Lease had the Commencement Date occurred on the original Estimated Commencement Date of November 1, 2012 rather than on the revised Estimated Commencement Date. Such calculation is set forth in Exhibit D. Tenant acknowledges that such payment is a fixed amount and shall not be subject to change if Landlord delivers the Premises to Tenant prior to the Estimated Commencement Date.
8. Tenant Payment of Advanced Base Rent. Tenant was required under Section 4.1 of the Lease to pay $26,400 in Advanced Base Rent concurrently with the mutual execution and delivery of the Lease, but through an oversight did not pay such Advanced Base Rent to Landlord until January 6, 2012, and Landlord hereby accepts such payment and waives any default in connection with such late payment.
9. Phased Termination of 201 1st Street Lease. At the time the Lease was executed, the parties anticipated Tenant relocating from its premises at 201 First Street in Petaluma, California (the “201 First Street Premises”) to the Premises and the Neighboring Building all at one time. With the staggered delivery of the Premises and portions of the Neighboring Building now anticipated, the parties anticipate Tenant moving from the 201 First Street Premises in two phases. Accordingly, Landlord shall, if requested by Tenant, deliver the termination agreement described in Section 3.1 of the Lease with respect to discrete portions of the 201 First Street Premises rather than the entire 201 First Street Premises. Portions of the 201 First Street Premises requested for termination shall be readily leasable to third parties with direct access to the common areas of the 201 First Street building and without the need for any demising walls. In the event that Landlord shall delay delivery of a fully executed termination agreement, Landlord shall pay Tenant's rent for the applicable portion of the 201 First Street Premises directly to the owner of such Premises on a day for day basis for each day Landlord's failure to deliver the termination agreement continues.
10. Condition Precedent. Tenant making the payments required upon execution of this Amendment in Sections 4 and 7 above is a condition precedent to the effectiveness of this Amendment, and this Amendment shall be of no force or effect if such payments are not delivered by Tenant concurrently with Landlord's delivery to Tenant of a fully executed original of this Amendment.
11. Entire Agreement. This Amendment represents the entire understanding between Landlord and Tenant concerning the subject matter hereof, and there are no understandings or agreements between them relating to the Lease or the Premises not set forth in writing and signed by the parties hereto. No party hereto has
relied upon any representation, warranty or understanding not set forth herein, either oral or written, as an inducement to enter into this Amendment.
12. Continuing Obligations. Except as expressly set forth to the contrary in this Amendment, the Lease remains unmodified and in full force and effect. To the extent of any conflict between the terms of this Amendment and the terms of the Lease, the terms of this Amendment shall control.
[SIGNATURES ON FOLLOWING PAGE]
IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year first above written.
|
| | | | | |
"LANDLORD" | "TENANT" | |
| | | | | |
| | | | | |
SEQUOIA CENTER LLC, | ENPHASE ENERGY, INC., |
| |
a California limited liability company | a Delaware corporation |
| | |
By: | G&W Ventures, LLC, | By: | /s/ Paul Nahi |
| a California limited liability company, | | Name: Paul Nahi |
| its Manager | | Its: President/CEO |
| | | | | |
| | | | | |
| By: | /s/ Matthew T. White | | | |
| | Matthew T. White, Manager | | | |
Schedule 1
LIST OF APPROVED WORKING DRAWINGS
| |
1. | The following sheets by Axia dated September 7, 2011 |
T1,T2,T3,T4;A1.1,A1.2, A.2.0.1A, A2.0.2A,A2.1 A, A2.2 A, A2.3 A, A4.1 A,
A5.1 A, A.2.0.1B, A2.0.2B, A2.0.3B, A2.0.4B,A2.0.5B, A2.0.6B, A2.0.7B, A2.1
B, A2.2 B, A2.3 B, A3.3 B, A3.4 B, A3.5 B, A4.1 B, A4.2 B, A4.3 B, A4.4 B, A4.5 B, A4.6B, A4.7 B, A4.8 B, A4.9 B, A5.1 B, A5.2 B, A5.3 B, A5.4 B, A8.1, A9.1, A9.2, A9.3, A9.4, A9.5
| |
2. | The following sheets by ATM Engineering dated August 31, 2011: |
S1.1, S2.1, S3.1, S3.2
| |
3. | The following sheets by Indoor Environmental Services dated August 31, 2011: |
M0.1, M0.2, M0.3, M0.4, M1.1A, M1.1B, M1.2A, M1.2B, M1.2A, M1.2B, M1.3A, M1.3B, M1.4A, M1.4B, M2.1
| |
4. | The following sheets by O’Rourke Electric Inc. dated August 10 2011: |
E0.1, E2.1, E3.1, E6.1, E6.3, E6.4, E6.5, E6.6, E6.7, E2.2, E2.3, E2.4, E3.2
E3.3, E3.4, E6.2, E6.8, E6.11
| |
5. | Responses to Requests for Information Nos. 1-10 |
EXHIBIT A
|
| | | | |
Tenant Improvement Summary | 12/15/2011 |
|
| | |
Enphase | | |
1400, 1420 N. McDowell Blvd. | Square Foot | 96,000 |
|
Petaluma, CA 94954 | | |
| | |
Description TI Expansion Costs | | Cost |
| | |
Tenant Improvements Per Vila’s 11.16.11 Bid Letter | | $ | 6,001,417.00 |
|
Reductions for Approved COR’s: | | |
COR’s #: 6,8,9,12,19,21,22,23,24,26,28,31,37, | | |
38,39,40,41,43,44,45,48,59,62,63 | | $ | (457,387.00 | ) |
Addition of “Code Only” Fire Alarm Work per Alternate: | | $ | 4,280.00 |
|
Total Contact Amount | | $ | 5,548,290.00 |
|
| | |
Less Overlaps from Prior Approvals: | | |
Ceiling Tile Removal | | $ | (5,000.00 | ) |
Demolition Costs | | $ | 113,203.00 |
|
Other Adjustments, BSP to Pay: | | |
Power during construction: BSP to cover expense | | $ | (7,500.00 | ) |
Temporary toilets: BSP to cover expense | | $ | (2,400.00 | ) |
Code only Fire alarm work | | $ | (4,260.00 | ) |
| | |
Other: | | |
BSP to perform landscape screening at transformers on balcony and one exterior considering unit (note: this cost is NOT included in the Bid Letter; no adjustment req;d) | | $ | — |
|
EMON system work to be performed as part of future TI’s, 2nd and 3rd floor of 1400 as req’d (Note: this cost is not included in Bid Letter; no adjustment req’d) | | $ | — |
|
| | |
Building Permit Fee - (Assumes no Impact Fees) | | by Tenant |
|
CM Fee | | waived |
|
1400 Handicap Parking Improvements - to be charged to | | |
2nd, 3rd Flr. TI Allowance | | $ | — |
|
Structural Engineering Re -Design Proposal - Chiller | | $ | 2,700.00 |
|
Total Costs, This Summary | | $ | 5,418,627.00 |
|
| | |
Prior Authorizations: | | |
10.20.11 1400 Demo, excl. Ceiling Tile Removal Direct Costs | | |
Plan Check Fee | | |
Furniture Mock Up Costs | | |
7.19.11 Ceiling Tile Removal/Slab Moisture Tests | | |
7.15.11 MEP Coordinator & Structural Engineer | | |
7.28.11 Demo for 1420, excluding Cell Tile Removal Costs Approved Separately | | |
7.28.11 Demo Permit costs, w/o Mark up | | $ | 1,216.47 |
|
Total TI Costs Approved to Date: | | $ | 5,590,821.21 |
|
| | |
Tenant Improvement Allowance: $40/sf | | $ | 3,840,000.00 |
|
| | |
Amount Over Tenant Improvement Allowance | | $ | 1,750,821.21 |
|
Agreed Cost Sharing By BSP | | $ | (223,459.00 | ) |
Total Construction and Other Costs Payable | | $ | 1,527,326.21 |
|
EXHBIT B
VILA PROPOSAL - 11/16/11
[attached]
|
| | | |
| Exhibit B Vila Construction Co. GENERALCONTRACTORS 590 South 33rd Street Richmond, California 94804 | |
Office Phone | |
(510) 236-9111 | |
| |
Fax | Contractor’s |
(510) 236-4979 | Lic. No. 300454 |
www.vilaconstruction.com
November16, 2011
Basin Street Properties
1383 North McDowell Blvd., suite 200
Petaluma, CA 94954
Attn: Matt Sherrill
RE: Enphase Tenant Improvement
1400 / 1420 North McDowell
Petaluma, CA
Matt,
The followinq is Our Cost Breakdown for the Enphase Tenant Improvement at 1400/1420 North McDowell Blvd., Petaluma. The costs are based on the Construction Documents from AXIA Architects, dated 5eptember7, 2011.
|
| | | | | |
| | | |
1. | General Conditions | $ | 173,600.00 |
| |
2. | Demo Work | 118,203.00 |
| |
3 | Concrete Work | 5,940.00 |
| |
4. | Pre Cast Concrete Countertops | 65,112.00 |
| *see Line item 34 |
5. | Structural Steel / Metal Fabrications | 164,814.00 |
| |
6. | Carpentry | 90,000.00 |
| |
7. | Millwork | 77,085.00 |
| |
8. | Wood Veneer Paneling | 47,522.00 |
| |
9. | Roof Patching (allowance) | 20,000.00 |
| |
10. | Doors, Frames, Hardware | 132,768.00 |
| |
11. | Glass/Glazing | 264,000.00 |
| |
12. | Glass/ Stainless Steel Railings | 80,360.00 |
| |
13. | Accordian Door | 19,930.00 |
| |
14. | Gypsum Board | 587,917.00 |
| |
15. | Ceramic Tile | 65,049.00 |
| |
16. | Acoustical Ceilings | 58,995.00 |
| |
17. | Floor Covering | 490,385.00 |
| |
18 | Painting | 163,652.00 |
| |
19. | Whiteboards (backing only) | 2,850.00 |
| |
20. | Toilet Partitions/Accesories | 29,060.00 |
| |
21. | Projector Mounts | 21,688.00 |
| |
22. | Access Floor Repair | 20,130.00 |
| |
23. | Signage | by tenant | |
| | | |
| Page 2 | | |
| | | |
24. | Interior Blinds/Motorized Shades | 33,599.00 |
| |
25. | Roof Hatches/Ships Ladders | 24,114.00 |
| |
26. | Elevator Upgrades | 5,940.00 |
| |
27. | Fire Sprinklers | 65,308.00 |
| |
28. | HVAC | 981,776.00 |
| |
29. | Hydronic Piping | 18,590.00 |
| |
30. | Plumbing | 59,205.00 |
| |
31 | Electric | 1,534,862.00 |
| |
32. | Fire Alarm System | 41,095.00 |
| |
33. | Wire Mesh Ceiling | 120,248.00 |
| |
34. | Granite Stone, Lobbles & Stairs 1&2 | 51,336.00 |
| |
| Sub Total | $ | 5,635,133.00 |
| |
| OH & P | 366,284.00 |
| |
| TOTAL LINE ITEMS | $ | 6,001,417.00 |
| |
| | | |
34. | COR #6 | 2,205.00 |
| |
35. | COR #8 | 2,327.00 |
| |
36. | COR #9 | 7,326.00 |
| |
37. | COR #12 | (7,743.00 | ) | |
|
| | | | | |
38. | COR #19 | 145.00 |
| |
39. | COR #21 | — |
| pending engineering |
40 | COR #22 | — |
| pending re-design |
41. | COR #23 | 3,972.00 |
| |
42. | COR #24 | 817.00 |
| |
43. | COR #26 | (4,350.00 | ) | |
44. | COR #28 | (134,519.00 | ) | |
45. | COR #37 | (8,288.00 | ) | |
46. | COR #38 | (34,340.00 | ) | |
47. | COR #39 | (18,813.00 | ) | |
48. | COR #40 | (14,377.00 | ) | |
49. | COR #41 | (69,522.00 | ) | |
50. | COR #43 | (35,770.00 | ) | |
51. | COR #44 | (2,455.00 | ) | |
52. | COR #45 | (5,242.00 | ) | |
53 | COR #48 | (25,246.00 | ) | |
53. | COR #59 | deducted $12,100 from the electric line item (both bldgs) |
54. | COR #63 (allowance) | (4,000.00 | ) | |
| Sub Total | $ | (339,873.00 | ) | |
| OH & P | included | |
| TOTAL COR’s | $ | 339,873.00 |
| |
| | | |
| GRAND TOTAL | $ | 5,661,544.00 |
| |
Page 3
Clarifications & Alternates
1. We do not Include any permit, architectural, or utility company fees.
2. The alternate listed below are Just a few obvious ones. We can review all VE options in our
meeting.
3. Alternate#1; Per the specification, Install R·11 insulation above the acoustical ceiling; ADD $6,805.00
4. Alternate #2; Provide and install a FM 200 fire System In the Server Room; ADD $37,625.00
5. We have not Included changing the wall texture in the exterior stairwells.
6. Electrical Items not Included in above costs, without GC markup;
|
| | |
1. | Restroom lighting over sinks, 1420, allowance | $2,600 |
| | |
2. | Training Room Upgrades | $8,000 |
| | |
3. | Fire alarm system boxes, conduit, & cabling | $55,000 |
7. Cleaning of the existing mini blinds on the exterior windows is NIC.
8. Alternate #3; Fire alarm check, if required:Add $4,260.00
Respectfully Submitted
VILA CONSTRUCTION COMPANY
Robert P. Vila
Vice President
EXHIBIT C
LIST OF CHANGE ORDER REQUESTS
[attached]
|
| | | | | |
Vila Bld Letter Line # | | Accepted CORs # | Description | COR Cost | |
34 | | 6 | move sprinkler valves in lobby | 2,205.00 | |
35 | | 8 | expose steel beam @ Stairs 3 and 4 | 2,327.00 | remove sheet rock from steel beam and paint steel |
36 | | 9 | sheet rock over small windows at Stair #4 | 7,326.00 | |
37 | | 12 | Remove sheet rock from exterior columns | (7,743.00) | |
38 | | 19 | remove sheet rock from inter. Column @wnd floor stair #2 | 145.00 | |
39 | | 21 | increase air flow at relocated board room | — | pending engineering |
40 | | 22 | rotate sodering area and move against Row A | — | pending re-design |
41 | | 23 | change wall at gridline C @ gridline 2-5 to full height wall | 3,972.00 | |
42 | | 24 | Add 230V/50Hz outlet in Engineering Chambers | 817.00 | |
43 | | 26 | Remove sheet rock from interior columns | (4,350.00) | |
44 | | 28 | delete new toilet partitions and tile work | (134,519.00) | This will delete new toilet partitions, replacement of plumbing fixtures and new tile work. ADA shower will remain |
| | | | | |
| | 31 | Delete steel mesh ceiling and install grid mesh | (73,748.00) | this will delete the custom metal mesh ceiling and add metal mesh panels in t-bar grid; new means to support glass wall is required |
| | | | | |
45 | | 37 | change roof hatch to manual | (8,288.00) | this changes the roof hatch door (1 only) to a manual operation in lieu of having an electric motor and switch |
| | | | | |
46 | | 38 | change precast concrete counters to p-lam | (34,340.00) | this will delete the precast concrete countertops at restroom replace them with P-lam |
| | | | | |
47 | | 39 | change door hardware to Dorma | (18,813.00) | |
48 | | 40 | Delete fry reglet and use L metal at sheet rock | (14,377.00) | this will delete the decorative trim at sheet rock locations |
| | | | | |
49 | | 41 | Delete steel canopy at Entry | (69,522.00) | |
50 | | 43 | Delete drywall trim detail at steel bin and metal kickers at exterior walls;run | (35,770.00) | this will delete work shown on Axia SK-1 at perimeter walls |
| | | drywall straight up wall behind beam | | |
|
| | | | | |
| | | | | |
51 | | 44 | Paint corridor walls above metal ceiling and eliminate patching of corridor walls | (2,455.00) | this will eliminate patching of fire caulking and penetrators |
52 | | 45 | change motorized shades to manual | (5,242.00) | this will change the motorized shades at the Training room to manually operated |
| | | | | |
53 | | 48 | delete 1 roof latch and ships ladder at 1400 | (25,246.00) | this will delete roof access at 1400 |
53 | | 59 | cable tray | n/a | deducted $12,100 from the electric line item (both bldgs) |
| | 62 | change the fire alarm scope to code minimus | (43,766.00) | |
54 | | 63 | Add structural steel to roof for chiller | 4,000.00 | Allowance; add structural steel to roof for chiller paint |
| | Sub Total | | (457,387.00) | |
| | OH & P | | included | |
| | TOTAL COR’s | | $(457,387.00) | |
EXHIBIT D
Base Rent and CAM
Labs on Ground Floor - 162 day delay/2=81 days
|
| | | | | | | | | | | | | | | |
Bldg | Sq. ft | Base Rent | CAM | Rent + Cam per day | Office Base Rent and CAM Owed Now |
| | | | | |
1,400 |
| 24,000 |
| $ | 1.10 |
| $ | 0.28 |
| $ | 1,088.88 |
| $ | 88,199.01 |
|
| | | | | |
| | Total Rent and CAM Owed | $ | 88,199.01 |
|
ENPH-2014.12.31-10K-EX10.09
SECOND AMENDMENT TO LEASE
(1400 N. McDowell Blvd.)
THIS SECOND AMENDMENT TO LEASE (this “Amendment”) dated January 13, 2014, is entered into between SEQUOIA CENTER LLC, a California limited liability company (“Landlord”) and ENPHASE ENERGY, INC., a Delaware corporation (“Tenant”).
THE PARTIES ENTER INTO THIS AMENDMENT based upon the following facts, understandings and intentions:
A.Landlord and Tenant previously entered into that certain Redwood Business Park NNN Lease dated as of June 3, 2011 and that certain First Amendment to Lease dated as of June 12, 2012 (collectively, the “Lease”) pursuant to which Tenant leases from Landlord 24,000 rentable square feet of space in the building commonly known as 1400 N. McDowell Boulevard, Petaluma, California. Capitalized terms used herein and not defined herein shall have the meanings set forth in the Lease in connection therewith.
B. Landlord and Tenant desire to amend the Lease as provided herein.
NOW, THEREFORE, IN CONSIDERATION of the mutual covenants and promises of the parties, the receipt and adequacy of which are hereby acknowledged, the parties hereto agree as follows:
1.Storage Space. Landlord hereby grants to Tenant a revocable license (the “Storage License”) to use the storage space located on the second floor of the Building depicted on Exhibit A attached hereto (the “Storage Space”). Tenant’s use of the Storage Space shall be limited solely to the storage of Tenant’s belongings, and Landlord shall not be required to provide utility, HVAC or janitorial service to the Storage Space. Except as provided in this Amendment, Tenant’s use of the Storage Space shall be subject to the terms and conditions of the Lease as if the Storage Space were a part of the Premises.
2. Antennae License. Landlord hereby grants to Tenant a revocable license (the “Antennae License”) (but only to the extent permitted by the City of Petaluma and all agencies and governmental authorities having jurisdiction thereof), at Tenant’s sole cost and expense, to install and operate two (2) antennas (“Antennas”) along with any necessary cables (“Cables”) on a portion of the roof of the Building to be designated by Landlord (“Roof Space”) (the Antennas and Cables are hereinafter collectively referred to as the “Antenna Equipment”) solely for Tenant’s internal, administrative purposes in the Project, and Tenant shall not use the Antenna Equipment for the provision of data transmission or telecommunications services to any third party or as a part of a telecommunications network that is used to provide data transmission or telecommunications services to any third party. Tenant shall not re-sell or lease the
communications capacity of the Antenna Equipment to any provider of data transmission or telecommunications services, nor shall Tenant co-locate any additional telecommunications facilities or capacity within the Roof Space. The precise location, size and configuration of the Antenna Equipment shall (a) be subject to Landlord’s prior written approval, not to be unreasonably withheld and (b) promote the safety, aesthetics and efficiency of the Antenna Equipment; provided, all of the Antenna Equipment and any maintenance or modifications thereto or placement thereof and all utilities used in connection therewith shall be at Tenant’s sole cost and expense, contained visually within a roof screen, installed and operated to Landlord’s reasonable specifications, and installed, maintained, operated and removed in accordance with the terms of the Lease, all applicable federal, state and local laws, regulations, ordinances, rules, orders, and requirements (collectively, “Laws”), any and all documents, easements, covenants, conditions and restrictions, and similar instruments, together with any and all amendments and supplements thereto made from time to time, each of which has been or hereafter is recorded in any official or public records with respect to the Building or any other portion of the Project (collectively, the “Recorded Matters”), and the prior rights of any other Tenant, Tenant or occupant in the Project. In no event shall Tenant puncture the roof membrane, impair the integrity of the roof system or invalidate any warranty related to the roof of the Building when installing, maintaining, repairing, modifying, operating or taking any other action with respect to the Antenna Equipment or Roof Space. Tenant shall, at its sole cost and expense, obtain all licenses and permits necessary to install and operate the Antenna Equipment within the Roof Space prior to performing any work related to the Antenna Equipment or Roof Space. Landlord shall cooperate reasonably with Tenant to modify the roof screen placement (subject to all applicable Laws, Recorded Matters and the prior rights of any other Tenant, Tenant or other occupant of the Project) if required for signal quality, reconfiguration due to the installation of any HVAC systems and other reasonable considerations; provided, the cost of all such modifications shall be the sole and exclusive responsibility of Tenant. All modifications to the Building, including the Roof Space, if any, shall be reasonably approved by Landlord in writing prior to commencement of any work or maintenance with respect to the Antenna Equipment. Tenant shall be solely responsible to pay for all utilities, including without limitation electricity, used in connection with the Antenna Equipment and Roof Space. The Antenna Equipment shall remain the property of Tenant and Tenant shall remove the Antenna Equipment upon the expiration or earlier termination of the Lease. Tenant shall restore the Roof Space and any other portion of the Building affected by the Antenna Equipment to its original condition upon the removal of the Antenna Equipment, excepting ordinary wear and tear. Tenant shall promptly repair any damage to the Building caused by Tenant or the use, operation, installation, repair, maintenance, alteration or removal of the Antenna Equipment. Tenant may not assign, lease, rent, sublet or otherwise transfer any of its interest in the Roof Space or the Antenna Equipment. The Antenna Equipment shall comply with all-non-interference rules of the Federal Communications Commission. If applicable, Tenant shall provide to Landlord a copy of (x) the Federal Communications Commission (or other agency) grant which has awarded frequencies to Tenant and (y) a list of Tenant’s frequencies. Anything to the contrary contained herein notwithstanding, if, during the Term, as such Term may be extended, Landlord, in its reasonable judgment,
believes that the Antenna Equipment poses a human health or environmental hazard that cannot be remediated or has not been remediated within ten (10) days after Tenant has been notified thereof, then Tenant shall immediately cease all operation of the Antenna Equipment and Tenant shall remove all of the Antenna Equipment within thirty (30) days thereafter. To the best of Tenant’s knowledge, Tenant represents to Landlord that the Antenna Equipment shall not emit any electro-magnetic fields which pose a human health or environmental hazard. Tenant shall not use the Antenna Equipment, the Roof Space or any other portion of the Project in any way which interferes with the use of the Project by Landlord, or other Tenants or Tenants of Landlord or any other occupant of the Building or Project. Such interference shall be deemed a material breach by the Tenant under the Lease, and Tenant shall, within five (5) days of written notice from Landlord, be responsible for terminating said interference. In the event any such interference does not cease within five (5) days of Landlord’s written notice, Tenant acknowledges that continuing interference may cause irreparable injury and, Tenant shall immediately cease all operation of the Antenna Equipment and Tenant shall remove all of the Antenna Equipment within thirty (30) days thereafter. In addition, Tenant shall be responsible for insuring the Antenna Equipment and Landlord shall have no responsibility therefor. Tenant shall indemnify, defend (by counsel reasonably acceptable to Landlord) and hold harmless Landlord and Landlord’s officers, directors, partners, employees, joint venturers, members, trustees, owners, shareholders, principals, agents, representatives successors and assigns (collectively, “Landlord’s Parties”) from any and all claims, demands, liabilities, damages, judgments, costs and expenses (including reasonable attorneys’ fees) any of such Landlord’s Parties may suffer or incur arising out of or related to the installation, use, operation, maintenance, modification, replacement and/or removal of the Antenna Equipment or any portion thereof.
3. License Fees; Duration of Licenses. Tenant shall to pay to Landlord three hundred fifty dollars ($350.00) per month for the Antennae License and one thousand two hundred dollars ($1,200.00) per month for the Storage License. No additional fees shall apply, and Tenant’s Building Percentage Share shall not increase as a result of the Antennae License or the Storage License. Either party may terminate the Antennae License or the Storage License upon fifteen (15) days prior written notice to the other party.
4. Condition of Roof Space and Storage Space. Tenant accepts the Roof Space and the Storage Space in their current “AS-IS” and “WITH ALL FAULTS” condition. Except with respect to any representations or warranties that may be expressly set forth herein, Tenant acknowledges that neither Landlord nor any agent of Landlord has made any representations or warranties, express or implied, with respect to the Roof Space or the Storage Space, including, without limitation, the suitability or fitness of the same for the conduct of Tenant’s activities or for any other purpose.
5. Entire Agreement. This Amendment represents the entire understanding between Landlord and Tenant concerning the subject matter hereof, and there are no understandings or agreements between them relating to the Lease, the Premises, the Roof Space or the Storage Space not set forth in writing and signed by the parties hereto. No
party hereto has relied upon any representation, warranty or understanding not set forth herein, either oral or written, as an inducement to enter into this Amendment.
6. Continuing Obligations. Except as expressly set forth to the contrary in this Amendment, the Lease remains unmodified and in full force and effect. To the extent of any conflict between the terms of this Amendment and the terms of the Lease, the terms of this Amendment shall control.
[SIGNATURES ON FOLLOWING PAGE]
IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year first above written.
|
| | | | | |
“LANDLORD” | “TENANT” | |
| | | | | |
| | | | | |
SEQUOIA CENTER LLC, | ENPHASE ENERGY, INC., |
| |
a California limited liability company | a Delaware corporation |
| | |
By: | G&W Ventures, LLC, | By: | /s/ Paul Nahi |
| a California limited liability company, | | Name: Paul Nahi |
| its Manager | | Its: President/CEO |
| | | | | |
| | | | | |
| By: | /s/ Matthew T. White | | | |
| | Matthew T. White, Manager | | | |
EXHIBIT A
DEPICTION OF STORAGE SPACE
ENPH-2014.12.31-10K-EX10.10
THIRD AMENDMENT TO LEASE
(1400 N. McDowell Blvd.)
THIS THIRD AMENDMENT TO LEASE (this "Amendment") dated September 25, 2014, is entered into between SEQUOIA CENTER LLC, a California limited liability company ("Landlord") and ENPHASE ENERGY, INC., a Delaware corporation (“Tenant").
THE PARTIES ENTER INTO THIS AMENDMENT based upon the following facts, understandings and intentions:
A.Landlord and Tenant previously entered into that certain Redwood Business Park NNN Lease dated as of June 3, 2011, as amended by that certain First Amendment to Lease dated as of June 12, 2012 and as amended by that certain Second Amendment to Lease dated January 13, 2014 (collectively, the "Lease") pursuant to which Tenant leases from Landlord 24,000 rentable square feet of space in the building commonly known as 1400 N. McDowell Boulevard, Petaluma, California. Capitalized terms used herein and not defined herein shall have the meanings set forth in the Lease in connection therewith.
B. Landlord and Tenant desire to amend the Lease as provided herein.
NOW, THEREFORE, IN CONSIDERATION of the mutual covenants and promises of the parties, the receipt and adequacy of which are hereby acknowledged, the parties hereto agree as follows:
1.Expansion of Premises. Tenant agrees to add to the Premises and lease from Landlord, and Landlord agrees to add to the Premises and lease to Tenant, on the terms and conditions set forth in the Lease as modified by this Amendment, an additional 24,000 rentable square feet of space on the second floor of the Building (the “Expansion Space”) as shown on Exhibit A.
2. Delivery of Expansion Space; Condition. Landlord shall deliver the Expansion Space to Tenant upon the mutual execution and delivery of this Amendment. Tenant has inspected the Expansion Space and, except for any obligations of Landlord under this Amendment and the Work Letter Agreement referenced in Section 4 below, agrees to accept the Expansion Space in its existing "as is" condition, with all faults and defects and without any representation or warranty of any kind, express or implied.
3. Work Letter Agreement. Landlord and Tenant shall each perform the work required to be performed by it as described in the Work Letter Agreement attached hereto as Exhibit B regarding the construction of Landlord Work in the lobby, and the Tenant Improvements in the Expansion Space. Landlord and Tenant shall each perform such work in accordance with the terms and conditions contained therein.
4. Expansion Space Rent Commencement. With respect to the Expansion Space, Tenant’s obligation to pay Rent shall commence on the earlier to occur of (a) the date the Tenant Improvements constructed pursuant to the Work Letter Agreement are substantially completed in the Expansion Space except for minor punch list work, and (b) April 1, 2015 (such earlier date being referred to herein as the “ES Rent Commencement Date”).
5. Expansion Space Base Rent. Commencing on the ES Rent Commencement Date, the Base Rent for the Expansion Space shall be as set forth in the chart below:
|
| | |
Period | Rate | Monthly Base Rent |
ES Rent Commence- ment Date – 4/30/15 | $1.17 | $28,080.00 |
5/1/2015 – 4/30/16 | $1.20 | $28,800.00 |
5/1/2016 – 4/30/17 | $1.24 | $29,760.00 |
5/1/2017 – 4/30/18 | $1.27 | $30,480.00 |
5/1/2018 – 4/30/19 | $1.31 | $31,440.00 |
5/1/2019 – 4/30/20 | $1.35 | $32,400.00 |
5/1/2020 – 4/30/21 | $1.39 | $33,360.00 |
5/1/2021 – 4/30/22 | $1.43 | $34,320.00 |
Base Rent for the original Premises shall remain as set forth in Section 23 of the Lease.
6. Tenant's Building Percentage Share. Effective on the ES Rent Commencement Date, "Tenant's Building Percentage Share" shall be 66.67 percent (%) (i.e., 48,000 rsf / 72,000 rsf = 66.67%), subject to further changes pursuant to Section 1.9 of the Lease.
7. Grid-Tied Photovoltaic System. Tenant wishes to install a Grid-Tied photovoltaic system on the roof the Building consisting of two (2) arrays totaling 262 solar modules and related equipment (collectively, the “Photovoltaic System”), as more fully described in (i) the plans prepared by Realgoods Solar dated April 2, 2014 containing sheets PV-000, PVA01, PV-A01A, PV-A02, PV-A03, PV-A04, PV-E01, PV-E02, (System Placards), PV-E02 (Electrical Calcs) and PV-G01 or such other plans as may be approved in writing by Landlord, and (ii) the plans from ZFA Structural Engineers, which shall approved by Landlord in writing prior to commencement of construction (collectively, the “Specifications”).
8. Landlord Approval. Landlord hereby consents the installation of the Photovoltaic System and the Roof Coating (defined below) on the roof of the Building on the terms and conditions set forth in this Amendment.
9. Terms and Conditions. The following terms and conditions shall apply to the work contemplated in Section 7 and 8 of this Amendment:
9.1 Permits. Tenant shall obtain all permits required for the work contemplated Sections 7 and 8 above; provided that Landlord shall reasonably cooperate in procuring such permits at no cost to Landlord.
9.2 Silicone Roof Coating. In connection with the installation of the Photovoltaic System, Tenant shall install a silicone roof coating (the “Roof Coating”) over the entire roof of the Building in accordance with the specifications set forth in the proposal from Petersen Dean contractors dated May 16, 2014 containing two pages, plus walking pads for the protection of the Roof Coating (the “Walking Pads”) in locations and with specifications to be approved by Landlord, which approval shall not be unreasonably withheld, conditioned or delayed (and failure to respond with five (5) business days to a request for consent shall be deemed approval). Such coating and Walking Pads are required to (i) prevent leaks in the roof of the Building following numerous penetrations to the roof membrane that will occur in connection with the installation of the Photovoltaic System and (ii) extend the life of the roof system which after the Photovoltaic System installation would be very expensive to replace. Tenant shall use best efforts to limit its activities on the roof to the Walking Pads to protect the Roof Coating.
9.3 Maintenance. Tenant shall maintain the Photovoltaic System in good condition and repair at its sole cost and expense. By installing the Photovoltaic System, Tenant will be: (i) creating numerous penetrations of the roof membrane, (ii) adding substantial weight on the roof of the Building and (iii) accessing the roof on a more frequent basis to monitor, adjust. maintain or modify the Photovoltaic System. Tenant acknowledges that all maintenance, repair and replacement costs with respect to the roof, the Roof Coating, the roof membrane and the roof structure incurred by Landlord in connection with the installation, use, modification or removal of the Photovoltaic System will constitute Operating Expenses under the Lease. The foregoing is not intended to and shall not limit Tenant’s indemnity under Section 27 of the Lease.
9.4 Costs. Landlord shall reimburse Tenant for the out-of-pocket cost of installing the Roof Coating up to a maximum of seventy-five thousand dollars (75,000.00). Such reimbursement shall be paid within thirty (30) days following Landlord’s receipt of invoices or other documentation reasonably requested by Landlord evidencing such costs. Tenant shall be responsible for all other costs and expenses of the work performed pursuant to Section 7 and Section 8 of this Amendment, including without limitation all design, permitting, construction, maintenance, repair and replacement costs.
9.5 Applicability of Lease Section 10.2. Section 10.2 of the Lease shall apply to the work contemplated in this Amendment. Without limiting the foregoing, Tenant shall remove the Photovoltaic System, but shall have no obligation to remove the Roof Coating, at the end of the Term in accordance with Section 10.2.6 of the Lease.
9.6 Applicability of Lease Section 27. Section 27 of the Lease, including without limitation the indemnity set forth therein, shall apply to the work contemplated in Section 7 and Section 8 of this Amendment. The Photovoltaic System and the Roof Coating shall constitute “Equipment” under Section 27 of the Lease; provided that maintenance of the Roof Coating shall be performed by Landlord pursuant to Section 9.3 above and provided further that Tenant shall have no obligation to remove the Roof Coating at the end of the Term.
9.7 Changes. Any changes to the Photovoltaic System, the Roof Coating or the Specifications shall require the prior written approval of Landlord, which approval shall not be unreasonably withheld, conditioned or delayed, and if Landlord fails to respond within five (5) business days of a written request for approval and Tenant provides Landlord with written notice of such failure (a “Response Notice”), then such request shall be deemed approved unless Landlord responds to Tenant’s request within two (2) business days following receipt of the Response Notice. Without limiting the foregoing, no Equipment (except for the Roof Coating) shall be permitted within six (6) feet of the edge of the roof of the Building.
10. Entire Agreement. This Amendment represents the entire understanding between Landlord and Tenant concerning the subject matter hereof, and there are no understandings or agreements between them relating to the Lease, the Premises, or the Expansion Space not set forth in writing and signed by the parties hereto. No party hereto has relied upon any representation, warranty or understanding not set forth herein, either oral or written, as an inducement to enter into this Amendment.
11. Continuing Obligations. Except as expressly set forth to the contrary in this Amendment, the Lease remains unmodified and in full force and effect. To the extent of any conflict between the terms of this Amendment and the terms of the Lease, the terms of this Amendment shall control.
[SIGNATURES ON FOLLOWING PAGE]
IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year first above written.
|
| | | | | |
“LANDLORD” | “TENANT” | |
| | | | | |
| | | | | |
SEQUOIA CENTER LLC, | ENPHASE ENERGY, INC., |
| |
a California limited liability company | a Delaware corporation |
| | |
By: | G&W Ventures, LLC, | By: | /s/ Paul Nahi |
| a California limited liability company, | | Name: Paul Nahi |
| its Manager | | Its: President/CEO |
| | | | | |
| | | | /s/ Kris Sennesael |
| By: | /s/ Matthew T. White | | Name: Kris Sennesael |
| | Matthew T. White, Manager | | Its: CFO |
EXHIBIT A
EXPANSION SPACE
EXHIBIT B
WORK LETTER
THIS WORK LETTER AGREEMENT supplements that certain Third Amendment to Lease (the “Amendment”) dated ______________, 2014, executed by SEQUOIA CENTER LLC, a California limited liability company ("Landlord") and ENPHASE ENERGY, INC., a Delaware corporation (“Tenant"). All capitalized terms not otherwise defined herein shall have the same meaning as those capitalized terms contained in the Amendment or the Lease.
SECTION 1
LANDLORD'S WORK. The term “Landlord Work” shall include the work set forth below.
1.1 Lobby Remodel. Landlord shall make upgrades to the lobby of the Building in accordance with the plans and specifications set forth on Exhibit B-1 at Landlord’s sole cost and expense; provided that any costs and expenses of the lobby upgrade work in excess of $150,000.00 shall be paid by Tenant; and provided further that the plans and specifications set forth on Exhibit B-1 are preliminary, and the final scope of work, materials and finishes for the lobby work are subject to the review and approval of Tenant, which approval shall not be unreasonably withheld.
1.2 HVAC. Within three (3) business days following the mutual execution and delivery of this Work Letter Agreement, Landlord shall retain John Petro with Indoor Environmental Services (the “HVAC Inspector”) to perform a thorough inspection of the HVAC system serving the Expansion Space, the scope of such inspection and accompanying report to be subject to the reasonable prior review and approval of Tenant. Landlord at its sole cost and expense shall promptly cause all repairs and replacements recommended by the HVAC Inspector (the “HVAC Work”) to be performed by an HVAC repair consultant (the “HVAC Repair Contractor”) selected by Landlord subject to approval by Tenant, which approval shall not be unreasonably withheld. Landlord shall cause the HVAC Inspector to certify to Tenant in writing (the “HVAC Certificate”) that the HVAC Work has been completed by the HVAC Repair Contractor in good and workmanlike manner and in compliance with all applicable laws. Landlord shall warranty the HVAC Work for a period of twelve months after substantial completion of the HVAC Work.
SECTION 2
TENANT'S WORK
2.1 Selection of Tenant's Architect. With respect to Tenant's construction of any improvements that are to be permanently affixed to the Expansion Space (collectively, the "Tenant Improvements"), Tenant shall retain an architect ("Tenant's Architect") approved by Landlord (which approval shall not be unreasonably withheld, conditioned or delayed and failure to respond within five (5) business days to a request for approval shall be deemed approval) to prepare a complete set of architectural, structural, mechanical, electrical and plumbing working drawings for the Expansion Space (collectively, the "Working Drawings"). Landlord hereby approves Ross Drulis Cusenberry as Tenant's Architect.
2.2 Development Drawings. Tenant shall arrange for Tenant's Architect to prepare and deliver to Landlord two (2) copies of Tenant's preliminary floor plan for the Expansion Space (the "Development Drawings") prior to preparing any architectural working drawings or engineering drawings. The Development Drawings shall include a layout and designation of all offices, rooms and other partitioning, their intended use, and equipment to be contained therein. Landlord shall approve (which approval shall not be unreasonably withheld or conditioned) or disapprove of the Development Drawings by written notice to Tenant within five (5) business days after Landlord's receipt of the Development Drawings, and if Landlord fails to respond within such five (5) business day period and Tenant provides Landlord with written notice of such failure (a “Response Notice”), then the Development Drawings shall be deemed approved by Landlord unless Landlord disapproves the Development Drawings within two (2) business days following receipt of the Response Notice. If Landlord disapproves of the Development Drawings, Tenant shall promptly (i) cause the Development Drawings to be revised to correct any deficiencies or address any other matters to which Landlord has reasonably objected, and (ii) deliver the revised Development Drawings to Landlord for its review and approval. Landlord shall approve (which approval shall not be unreasonably withheld or conditioned) or disapprove of the revised Development Drawings by written notice to Tenant within five (5) business days after Landlord's receipt of the revised Development Drawings, and if Landlord fails to respond within such five (5) business day period and Tenant provides Landlord with a Response Notice regarding such failure, then the revised Development Drawings shall be deemed approved by Landlord unless Landlord disapproves the revised Development Drawings within two (2) business days following receipt of the Response Notice. The Development Drawings approved by Landlord are hereinafter referred to as the "Approved Development Drawings".
2.3 Working Drawings. After Landlord has approved the Development Drawings, Tenant shall promptly cause Tenant's Architect to complete the architectural and engineering drawings for the Expansion Space, and cause Tenant's Architect to compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings for the Expansion Space (collectively, the "Working Drawings"). The Working Drawings shall be consistent with the Approved Development Drawings. Tenant shall deliver to Landlord two (2) copies of the Working Drawings for Landlord's review and approval. Landlord shall approve or disapprove of the Working Drawings by written notice to Tenant within ten (10) business days after Landlord's receipt of the Working Drawings. If Landlord disapproves of the Working Drawings, Tenant shall promptly (i) cause the Working Drawings to be revised to correct any deficiencies or address any other matters to which Landlord has objected, and (ii) deliver the revised Working Drawings to Landlord for its review and approval. The Working Drawings approved by Landlord are hereinafter referred to as the "Approved Working Drawings".
2.4 Approved Working Drawings. After Landlord has approved the Working Drawings, Tenant shall promptly submit the same to the appropriate governmental agency or department for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord's consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Expansion Space and that obtaining the same shall be Tenant's responsibility; provided, however, that Landlord shall cooperate with Tenant in executing permit applications and performing other ministerial acts reasonably necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications or alterations to the Approved Working Drawings (including without limitation those changes, if any, required by the applicable governmental agency or department as a condition to issuing the required building permit, it being the intent of the parties that Landlord shall have an opportunity to review and reasonably dispute such required changes in good faith) may be made without the prior written consent of Landlord, which consent shall not be unreasonably withheld or conditioned, and if Landlord fails to respond within five (5) business days following receipt of a written request to approve change(s) and Tenant provides Landlord with a Response Notice regarding such failure, then the requested changes to the Approved Working Drawings shall be deemed approved by Landlord unless Landlord disapproves the requested change(s) within two (2) business days following receipt of the Response Notice.
2.5 No Liability. Landlord's review of the Development Drawings and the Working Drawings is solely for Landlord's purpose. Accordingly, Landlord shall have no liability whatsoever in connection therewith and shall not be responsible for any omissions or errors contained in the Development Drawings or the Construction Drawings.
SECTION 3
CONSTRUCTION OF THE TENANT IMPROVEMENTS
3.1 Tenant's Contractor and Tenant's Agents.
3.1.1 Tenant's Contractor. Tenant shall retain a general contractor ("Tenant's Contractor") approved in writing by Landlord to construct the Tenant Improvements. Landlord shall not unreasonably withhold, condition or delay its approval of Tenant's Contractor (and failure to respond within five (5) business days to a request for approval shall be deemed approval). Landlord hereby accepts Vila Construction, Kirby Construction or BBS Construction as Tenant's Contractor.
3.1.2 Tenant's Agents. Tenant shall provide Landlord with a list of all subcontractors, laborers, materialmen and suppliers used by Tenant (such subcontractors, laborers, materialmen and suppliers, together with Tenant's Contractor, are collectively referred to as "Tenant's Agents".
3.2 Construction of Tenant Improvements.
3.2.1 Tenant's Agents.
3.2.1.1 Landlord's General Conditions. Tenant's and Tenant's Agents' construction of the Tenant Improvements shall comply with the following: (i) the Tenant Improvements shall be constructed in strict accordance with the Approved Working Drawings; and (ii) Tenant shall abide by all of Landlord's commercially reasonable rules with respect to the storage of materials, coordination of work with the contractors of other tenants, and any other matter in connection with this Work Letter Agreement, including, without limitation, the construction of the Tenant Improvements. A copy of Landlord’s current construction rules are attached hereto as Exhibit B-2.
3.2.1.2 Indemnity. Tenant's indemnity of Landlord as set forth in the Lease shall also apply with respect to any and all costs, losses, damages, injuries and liabilities related in any way to any act or omission of Tenant or Tenant's Agents, or anyone directly or indirectly employed by any of them, or in connection with Tenant's non-payment of any amount arising out of the Tenant Improvements and/or Tenant's disapproval of all or any portion of any request for payment.
3.2.1.3 Insurance Requirements.
3.2.1.3.1 General Coverages. Tenant's Contractor shall carry worker's compensation insurance covering all of its respective employees and shall also carry public liability insurance, all with limits, in form and with companies as are reasonably required by Landlord, and Tenant shall require its Contractor to require its subcontractors, materialmen and suppliers to do the same.
3.2.1.3.2 General Terms. Tenant shall deliver to Landlord certificates for all insurance required to be carried by Tenant or Tenant's Contractor pursuant to this Section 3.2.1.3 prior to the commencement of construction of the Tenant Improvements and before the Tenant's Contractor's equipment is moved onto the site. Tenant shall use commercially reasonable efforts to cause all such policies of insurance to contain a provision that the company writing said policy will give Landlord thirty (30) days' prior written notice of any cancellation or lapse of the effective date or any reduction in the amounts of such insurance. All policies carried under this Section 3.2.1.3 shall insure Landlord, Basin Street Properties and Tenant, as their interests may appear, as well as Tenant's Contractor, as applicable. Such insurance shall provide that it is primary insurance as respects the Landlord and Basin Street Properties and that any other insurance maintained by Landlord or Basin Street Properties is excess and noncontributing with the insurance required hereunder. The requirements for the foregoing insurance shall not be construed to modify the provisions for indemnification of Landlord by Tenant under this Work Letter Agreement.
3.2.2 Governmental Compliance. The Tenant Improvements shall comply in all respects with all applicable laws, building codes, ordinances and regulations.
3.2.3 Inspection by Landlord. Landlord shall have the right to inspect the Tenant Improvements at all times, and provided further that Landlord shall not unreasonably interfere with the performance of the Tenant Improvements, provided however, that Landlord's failure to inspect the Tenant Improvements shall in no event constitute a waiver of any of Landlord's rights hereunder nor shall Landlord's inspection of the Tenant Improvements constitute Landlord's approval of the same. Should Landlord disapprove any portion of the Tenant Improvements, Landlord shall notify Tenant in writing of such disapproval and shall specify the items disapproved. Any defects in, or deviations from the Approved Working Drawings by the Tenant Improvements, shall be rectified by Tenant at no expense to Landlord.
3.3 Notice of Completion; Copy of Plans. Within ten (10) Business days after the Tenant Improvement are completed, Tenant shall cause a Notice of Completion to be recorded in the office of the Recorder of the County in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant's agent for such purpose, at Tenant's sole cost and expense. At the conclusion of construction, Tenant shall cause Tenant's Architect and Tenant's Contractor to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction and deliver to Landlord a set of the updated permitted Approved Working Drawings, in both paper and electronic formats as reasonably required by Landlord.
SECTION 4
MISCELLANEOUS
4.1 Tenant's Representative. Tenant has designated Matt Rudie as its sole representative with respect to the matters set forth in this Work Letter Agreement, who shall have full authority and responsibility to act on behalf of Tenant as required in this Work Letter Agreement.
4.2 Landlord's Representative. Landlord has designated Matt Sherrill as its sole representative with respect to the matters set forth in this Work Letter Agreement, who, until further notice to Tenant, shall have full authority and responsibility to act on behalf of Landlord as required in this Work Letter Agreement.
4.3 Time of the Essence in This Work Letter Agreement. Unless otherwise indicated, all references herein to a "number of days" shall mean and refer to calendar days. If any item requiring approval is timely disapproved by Landlord, the procedure for preparation of the document and approval thereof shall be repeated until the document is approved by Landlord.
SECTION 5
TENANT IMPROVEMENT ALLOWANCE
5.1 Tenant Improvement Allowance. Tenant shall be entitled to a one-time tenant improvement allowance (the "Tenant Improvement Allowance") of $40.00 per rentable square foot of the Expansion Space ($40.00 X 24,000 = $960,000.00) for the costs relating to the design and construction of the Tenant Improvements; provided, however, that Landlord shall have no obligation to disburse all or any portion of the Tenant Improvement Allowance to Tenant unless Tenant makes a request for disbursement pursuant to the terms and conditions of Section 5.2 below prior to that date which is twelve (12) months after the Commencement Date. In no event shall Landlord be obligated to make disbursements pursuant to this Work Letter Agreement in a total amount which exceeds the Tenant Improvement Allowance. Tenant shall not be entitled to receive any cash payment or credit against Rent or otherwise for any unused portion of the Tenant Improvement Allowance which is not used to pay for the Tenant Improvement Allowance Items (as such term is defined below).
5.2 Disbursement of the Tenant Improvement Allowance.
5.2.1 Tenant Improvement Allowance Items. Except as otherwise set forth in this Work Letter Agreement, the Tenant Improvement Allowance shall be disbursed by Landlord only for the following items and costs (collectively, the "Tenant Improvement Allowance Items"):
5.2.1.1 Payment of the fees of Tenant's Architect and the Engineers;
5.2.1.2 The payment of plan check, permit and license fees relating to construction of the Tenant Improvements;
5.2.1.3 The cost of construction of the Tenant Improvements, including, without limitation, contractors' fees and general conditions, testing and inspection costs, costs of utilities, trash removal, parking and hoists, (Landlord hereby covenants that there will be no cost or expenses charged to Tenant for after-hours freight elevator usage);
5.2.1.4 The cost of any changes to the Working Drawings or Tenant Improvements required by Code;
5.2.1.5 Sales and use taxes and Title 24 fees imposed solely as a result of the construction of the Tenant Improvements (it being understood and agreed that the provisions of the Lease regarding compliance with laws shall govern all other costs, expenses or fees payable as a result of the application of Title 24); and
5.2.1.6 Any other costs paid to Landlord in connection with the construction of the Tenant Improvements.
5.2.2 Disbursement of Tenant Improvement Allowance. Subject to Section 5.1 above, during the construction of the Tenant Improvements, Landlord shall make monthly disbursements of the Tenant Improvement Allowance for Tenant Improvement Allowance Items for the benefit of Tenant and shall authorize the release of monies for the benefit of Tenant as follows:
5.2.2.1 Monthly Disbursements. On or before the tenth (10th) day of each calendar month during the construction of the Tenant Improvements, Tenant shall deliver to Landlord: (i) a request for payment, in a form to be provided by Landlord, showing the schedule, by trade, of percentage of completion of the Tenant Improvements in the Expansion Space, detailing the portion of the work completed and the portion not completed; (ii) invoices from all of Tenant's Agents for labor rendered and materials delivered to the Expansion Space; (iii) executed mechanic's lien releases (conditional for current invoices and unconditional for prior paid invoices) from all of Tenant's Agents which shall comply with the appropriate provisions, as reasonably determined by Landlord, of California Civil Code Section 3262(d); and (iv) all other information reasonably requested by Landlord. Tenant's request for payment shall be deemed Tenant's acceptance and approval of the work furnished and/or the materials supplied as set forth in Tenant's payment request. On or before the tenth (10th) day of the following calendar month, Landlord shall deliver a check to Tenant made payable to Tenant's Contractor in payment of the lesser of (A) the amounts so requested by Tenant, as set forth in this Section 5.2.2.1, above, less a ten percent (10%) retention (the aggregate amount of such retentions to be known as the "Final Retention") and (B) the balance of any remaining available portion of the Tenant Improvement Allowance (not including the Final Retention), provided that Landlord does not reasonably dispute any request for payment based on non-compliance of any work with the Approved Working Drawings, or due to any substandard work, or for any other reason. Landlord's payment of such amounts shall not be deemed Landlord's approval or acceptance of the work furnished or materials supplied as set forth in Tenant's payment request.
5.2.2.2 Final Retention. Subject to the provisions of this Work Letter Agreement, a check for the Final Retention payable jointly to Tenant and Tenant's Contractor shall be delivered by Landlord to Tenant following the completion of construction of the Tenant Improvements in the Expansion Space, provided that (i) Tenant delivers to Landlord properly executed mechanics lien releases in compliance with both California Civil Code Section 3262(d)(2) and either Section 3262(d)(3) or Section 3262(d)(4), and (ii) Landlord has determined that no substandard work exists in the Tenant Improvements which adversely affects the mechanical, electrical, plumbing, heating, ventilating and air conditioning, life-safety or other systems of the Building, the curtain wall of the Building, the structure or exterior appearance of the Building, or any other tenant's use of such other tenant's leased premises in the Building.
5.2.2.3 Other Terms. Landlord shall only be obligated to make disbursements from the Tenant Improvement Allowance to the extent costs are incurred by Tenant for Tenant Improvement Allowance Items.
|
| |
"LANDLORD"
SEQUOIA CENTER LLC, a California limited liability company
By: G&W Ventures, LLC, a California limited liability company, its Manager
By : Matthew T. White, Manager
| "TENANT"
ENPHASE ENERGY, INC., a Delaware corporation
By: Name: Paul Nahi Its: President/CEO
|
EXHIBIT B-1
Lobby Plans and Specifications
[to be attached]
EXHIBIT B-2
Construction Rules
[to be attached]
ENPH-2014.12.31-10K-EX10.11
FOURTH AMENDMENT TO LEASE
(1400 N. McDowell Blvd.)
THIS FOURTH AMENDMENT TO LEASE (this “Amendment”) dated December 30, 2014, is entered into between SEQUOIA CENTER LLC, a California limited liability company (“Landlord”) and ENPHASE ENERGY, INC., a Delaware corporation (“Tenant”).
THE PARTIES ENTER INTO THIS AMENDMENT based upon the following facts, understandings and intentions:
A.Landlord and Tenant previously entered into that certain Redwood Business Park NNN Lease dated as of June 3, 2011, as amended by that certain First Amendment to Lease dated as of June 12, 2012, as amended by that certain Second Amendment to Lease dated January 13, 2014, and as amended by that certain Third Amendment to Lease (the “Third Amendment”) dated September 25, 2014 (collectively, the “Lease”) pursuant to which Tenant leases from Landlord 48,000 rentable square feet of space in the building commonly known as 1400 N. McDowell Boulevard, Petaluma, California. Capitalized terms used herein and not defined herein shall have the meanings set forth in the Lease in connection therewith.
B. Landlord and Tenant desire to amend the Lease as provided herein.
NOW, THEREFORE, IN CONSIDERATION of the mutual covenants and promises of the parties, the receipt and adequacy of which are hereby acknowledged, the parties hereto agree as follows:
1.Work Letter Agreement. Section 1.1 (Lobby Remodel) of the Work Letter Attached as Exhibit B to the Third Amendment (the “Work Letter”) is hereby deleted in its entirety and shall not be replaced. Tenant acknowledges that Landlord is not required to perform or pay for any work in connection with the Third Amendment or the Work Letter, except that Landlord shall perform and pay for the work set forth in Section 1.2 (HVAC) of the Work Letter and shall provide the Tenant Improvement Allowance in accordance with Section 5.1 of the Work Letter as modified by Section 1.2 below.
2.Tenant Improvement Allowance. The Tenant Improvement Allowance is hereby increased to a total of one million one hundred ten thousand dollars ($1,110,000.00), which is based on the following allocations:
| |
a) | $960,000.00 original amount per Section 5.1 of the Work Letter; and |
| |
b) | $150,000.00 additional contribution toward lobby upgrades* |
*The portion of the Tenant Improvement Allowance identified as item b above must be used for the purpose of lobby upgrades, and such allocated amounts of the Tenant Improvement Allowance shall not be used for any other purpose.
3. Entire Agreement. This Amendment represents the entire understanding between Landlord and Tenant concerning the subject matter hereof, and there are no understandings or agreements between them relating to the Lease, the Premises, or the Expansion Space not set forth in writing and signed by the parties hereto. No party hereto has relied upon any representations, warranty or understanding not set forth herein, either oral or written, as an inducement to enter into this Amendment.
4. Continuing Obligations. Except as expressly set forth to the contrary in this Amendment, the Lease remains unmodified and in full force and effect. To the extent of any conflict between the terms of this Amendment and the terms of the Lease, the terms of this Amendment shall control.
[SIGNATURES ON FOLLOWING PAGE]
IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year first above written.
|
| | | | | |
“LANDLORD” | “TENANT” | |
| | | | | |
| | | | | |
SEQUOIA CENTER LLC, | ENPHASE ENERGY, INC., |
| |
a California limited liability company | a Delaware corporation |
| | |
By: | G&W Ventures, LLC, | By: | /s/ Paul Nahi |
| a California limited liability company, | | Name: Paul Nahi |
| its Manager | | Its: President/CEO |
| | | | | |
| | | | | |
| By: | /s/ Matthew T. White | | | |
| | Matthew T. White, Manager | | | |
ENPH-2014.12.31-10K-EX10.13
FIRST AMENDMENT TO LEASE
(1420 N. McDowell Blvd.)
THIS FIRST AMENDMENT TO LEASE (this “Amendment”) dated as of January 12, 2012, is entered into between SEQUOIA CENTER LLC, a California limited liability company (“Landlord”) and ENPHASE ENERGY, INC., a Delaware corporation (“Tenant”).
THE PARTIES ENTER INTO THIS AMENDMENT based upon the following facts, understandings and intentions:
A. Landlord and Tenant previously entered into that certain Redwood Business Park NNN Lease dated as of June 3, 2011 (together with all exhibits thereto, the “Lease”) pursuant to which Tenant leases from Landlord the first floor of the building commonly known as 1200 N. McDowell Boulevard, Petaluma, California. Capitalized terms used herein and not defined herein shall have the meanings set forth in the Lease (including the Work Letter Agreement attached as Exhibit B thereto) in connection therewith.
B. Landlord and Tenant desire to make certain changes to the Lease as further provided herein.
NOW, THEREFORE, IN CONSIDERATION of the mutual covenants and promises of the parties, the receipt and adequacy of which are hereby acknowledged, the parties hereto agree as follows:
1. Estimated Commencement Date. The Estimated Commencement Date is hereby extended to (i) February 15, 2012 with respect to the second and third floors of the Building, and (ii) April 10, 2012 with respect to the first floor of the Building. Tenant acknowledges that Landlord may deliver the Premises to Tenant in the condition required by the Lease prior to the Estimated Commencement Date, and that in such event the Commencement Date shall occur prior to the Estimated Commencement Date on the date the Premises are Substantially Completed as defined in Section 13 of the Work Letter Agreement.
,
2. Approved Working Drawings. Landlord and Tenant hereby agree that the Working Drawings listed on Schedule 1 attached hereto shall be deemed the “Approved Working Drawings” under Section 2 of the Work Letter Agreement. Tenant shall either (a) modify the Approved Working Drawings to restore the roof access that would be eliminated per the Approved Working Drawings, or (b) install roof walking pads as reasonably determined by Landlord to allow full roof access from other access points, with such changes constituting a Tenant requested Change Order at Tenant's sole cost. Landlord shall have the right to direct changes to the
Approved Working Drawings to effectuate the Change Order Requests listed on Exhibit C (the "COR's"). Such changes shall be subject to Tenant's approval, which shall not be unreasonably withheld, conditioned or delayed. Such changes directed by Landlord shall not constitute Tenant requested Change Orders. By way of example, Landlord shall specify the mesh material contemplated in COR No. 31, and Tenant may suggest alternative materials but may not require a material that does not result in the savings contemplated in COR No. 31 .
3. Approved Budget. This Section 3 of this Amendment replaces and supersedes Section .3 of the Work Letter Agreement with respect to Tenant's budget approval for the Tenant Improvements to be constructed in the Premises, but the mechanism set forth in Section 3 of the Work Letter Agreement shall apply with respect to the construction of Tenant Improvements in the Expansion Space in the event Tenant exercises its expansion rights pursuant to Section 24 of the Lease. Tenant hereby approves the Tenant Improvement Summary attached hereto as Exhibit A (the “Approved Budget”), which is based on the Proposal from Vila Construction dated November 16, 2011 attached hereto as Exhibit B and the Approved Working Drawings referenced therein, as modified by the COR's (as so modified, the “Contractor Proposal”). In no event shall Tenant's Contribution (defined below) be increased because the Tenant Improvement Summary attached hereto as Exhibit A failed to include an item expressly and unambiguously required in the Approved Working Drawings, as modified by the COR's. For the purposes of clarity, the parties hereby agree that the Approved Working Drawings did not expressly and unambiguously require a water proofing membrane on the concrete slab on the first floor. The Approved Budget applies to the Premises as well as an additional 24,000 square feet of space located in the adjacent building having an address of 1400 N. McDowell Boulevard, Petaluma, California.
4. Tenant Payment for Tenant Improvements. Section 6 of the Work Letter Agreement is hereby deleted in its entirety and replaced with the following: Tenant shall pay to Landlord $1,145,521.66, which represents Tenant's contribution to the portion of the Tenant Improvements described in the Approved Working Drawings and the COR's applicable to the Premises (i.e., 75% X $l,527,362.21) as more particularly set forth in the Approved Budget ("Tenant's Contribution"). Tenant shall pay such amount on the following schedule: 50% upon the mutual execution and delivery of this Amendment, 25% within ten (10) days following the delivery of the second and third floors of the Building to Tenant in the condition required by the Lease, and 25% within ten (10) days following the delivery of the first floor of the Building to Tenant in the condition required by the Lease. Notwithstanding anything to the contrary contained in the Work Letter Agreement, Landlord shall be responsible for any and all costs to perform such work in excess of Tenant's Contribution; provided (a) that (i) any changes by Tenant to the Approved Working Drawings or the COR's listed in Exhibit C, including without limitation changes contemplated in change order requests previously approved by Tenant but not included in the COR's listed in Exhibit C, and (ii) any additional costs resulting from errors or omissions in the Approved Working Drawings, shall constitute Change Orders per Section 8 of the Work Letter Agreement, and (b) that Tenant shall be solely responsible for the cost of procuring and installing any trade fixtures, equipment, appliances, furniture, furnishings, telephone or computer equipment or wiring or other personal property. As provided in Section 9 of the Work Letter
Agreement, all delays in Substantial Completion of the Tenant Improvements beyond the Estimated Commencement Date caused by Tenant requested Change Orders (including Change Orders resulting from errors or omissions in the Approved Working Drawings) shall constitute Tenant Delays. Notwithstanding the foregoing, Landlord shall be responsible for delays and costs resulting from an error or omission in the Approved Working Drawings that both (A) would not have been avoided by a licensed architect applying the standard of care customary in the industry, and (B) Vila Construction, applying the standard of care customary in the industry, should have nonetheless taken into account when preparing the estimate reflected in the Approved Budget. As an example, the following omission in the COR's would be the responsibility of Landlord: COR No. 12 calls for the removal of perimeter column drywall encasements, which resulted in exposure of the window side of the columns to daylight. Due to the opaque quality of glass and the original condition of the drywall encasement having a dark paint finish, this condition was not contemplated by Axia as warranting application of finish paint to that side of the columns despite Axia exercising customary care in the industry with respect to such encasement removal. When direct daylight is applied, however, the columns are somewhat apparent from the exterior, and Vila Construction, exercising customary care in estimating the cost of COR No. 12, should have included (and did include) the painting of the backside of the columns. Haley Recio, Matt Rudie, Russ Sweeney and Paul Nahi shall have authority to approve Change Orders and any Change Order approved in writing or by email by any such representative shall be binding upon Tenant. As an accommodation to Tenant, Landlord shall require payment for Change Orders for which Tenant is responsible within five (5) days following Tenant's notice to proceed with a Change Order rather than requiring prepayment as previously required by the Work Letter Agreement.
5. Special Circumstances. Notwithstanding the allocation of responsibilities for costs set forth in Section 4 above, Landlord and Tenant have allocated certain costs as follows:
5.1. Toilet Partitions. So long as Tenant does not make any improvements or other modifications to the restrooms serving the Premises, Landlord shall be responsible, at its sole cost, for all work in the restrooms required by the City of Petaluma to comply with the Americans with Disabilities Act (the "ADA"). If Tenant elects to make any improvements or other modifications to the restrooms that trigger any work to comply with ADA, such work shall constitute a Change Order at Tenant's sole cost.
5.2. Stairway. The Contractor Proposal contemplates granite slab segmented treads with granite slab risers for the internal lobby stairway. Any structural upgrades to the stairway required as a direct result of the granite treads and risers that are not included in the Contractor Proposal shall be at Landlord’s sole cost. Any additional structural upgrades required to accommodate stairway components or details different from those in the Contractor Proposal shall constitute Tenant requested Change Order at Tenant's sole cost.
6. Additional Drawings. On December 15, 2011, Tenant delivered to Landlord drawings and specifications dated December 13, 2011 prepared by Axia Architects (the "December 13 Drawings"), subject to review and approval by Landlord in accordance with Section 2 of the Work Letter Agreement. Tenant acknowledges that, subject to Landlord's timely compliance with the provisions of the Work Letter Agreement requiring Landlord to respond to drawings and specifications submitted for approval, any delays in Substantial Completion of the Tenant Improvements beyond the Estimated Commencement Date caused by any changes from the Approved Working Drawings or COR's that are required in the December 13 Drawings or caused by errors or omissions in either the Approved Working Drawings or the December 13 Drawings shall constitute Tenant requested Change Orders as more fully set forth in Section 4 above.
7. Tenant Payment for Delay. Landlord and Tenant disagree as to who is responsible for the delay in the Estimated Commencement Date referenced in Section 1 above. Without either party admitting fault or liability, the parties have agreed to resolve such disagreement by Tenant paying to Landlord $184,824.99 concurrently with the execution and delivery of this Amendment. Such amount represents fifty percent (50%) of the rent that would have been payable under the Lease had the Commencement Date occurred on the original Estimated Commencement Date of November 1, 2012 rather than on the revised Estimated Commencement Date. Such calculation is set forth in Exhibit D. Tenant acknowledges that such payment is a fixed amount and shall not be subject to change if Landlord delivers the Premises to Tenant prior to the Estimated Commencement Date.
8. Tenant Payment of Advanced Base Rent. Tenant was required under Section 4.1 of the Lease to pay $72,000 in Advanced Base Rent concurrently with the mutual execution and delivery of the Lease, but through an oversight did not pay such Advanced Base Rent to Landlord until January 6, 2012, and Landlord hereby accepts such payment and waives any default in connection with such late payment.
9. Phased Termination of 201 1st Street Lease. At the time the Lease was executed, the parties anticipated Tenant relocating from its premises at 201 First Street in Petaluma, California (the “201 First Street Premises”) to the Premises and the Neighboring Building all at one time. With the staggered delivery of the Premises and portions of the Neighboring Building now anticipated, the parties anticipate Tenant moving from the 201 First Street Premises in two phases. Accordingly, Landlord shall, if requested by Tenant, deliver the termination agreement described in Section 3.1 of the Lease with respect to discrete portions of the 201 First Street Premises rather than the entire 201 First Street Premises. Portions of the 201 First Street Premises requested for termination shall be readily leasable to third parties with direct access to the common areas of the 201 First Street building and without the need for any demising walls. In the event that Landlord shall delay delivery of a fully executed termination agreement, Landlord shall pay Tenant's rent for the applicable portion
of the 201 First Street Premises directly to the owner of such Premises on a day for day basis for each day Landlord's failure to deliver the termination agreement continues.
10. Condition Precedent. Tenant making the payments required upon execution of this Amendment in Sections 4 and 7 above is a condition precedent to the effectiveness of this Amendment, and this Amendment shall be of no force or effect if such payments are not delivered by Tenant concurrently with Landlord's delivery to Tenant of a fully executed original of this Amendment.
11. Entire Agreement. This Amendment represents the entire understanding between Landlord and Tenant concerning the subject matter hereof, and there are no understandings or agreements between them relating to the Lease or the Premises not set forth in writing and signed by the parties hereto. No party hereto has relied upon any representation, warranty or understanding not set forth herein, either oral or written, as an inducement to enter into this Amendment.
12. Continuing Obligations. Except as expressly set forth to the contrary in this Amendment, the Lease remains unmodified and in full force and effect. To the extent of any conflict between the terms of this Amendment and the terms of the Lease, the terms of this Amendment shall control.
[SIGNATURES ON FOLLOWING PAGE]
IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year first above written.
|
| | | | | |
"LANDLORD" | "TENANT" | |
| | | | | |
| | | | | |
SEQUOIA CENTER LLC, | ENPHASE ENERGY, INC., |
| |
a California limited liability company | a Delaware corporation |
| | |
By: | G&W Ventures, LLC, | By: | /s/ Paul Nahi |
| a California limited liability company, | | Name: Paul Nahi |
| its Manager | | Its: President/CEO |
| | | | | |
| | | | | |
| By: | /s/ Matthew T. White | | | |
| | Matthew T. White, Manager | | | |
Schedule 1
LIST OF APPROVED WORKING DRAWINGS
| |
1. | The following sheets by Axia dated September 7, 2011 |
T1,T2,T3,T4;A1.1,A1.2, A.2.0.1A, A2.0.2A,A2.1 A, A2.2 A, A2.3 A, A4.1 A,
A5.1 A, A.2.0.1B, A2.0.2B, A2.0.3B, A2.0.4B,A2.0.5B, A2.0.6B, A2.0.7B, A2.1
B, A2.2 B, A2.3 B, A3.3 B, A3.4 B, A3.5 B, A4.1 B, A4.2 B, A4.3 B, A4.4 B, A4.5 B, A4.6B, A4.7 B, A4.8 B, A4.9 B, A5.1 B, A5.2 B, A5.3 B, A5.4 B, A8.1, A9.1, A9.2, A9.3, A9.4, A9.5
| |
2. | The following sheets by ATM Engineering dated August 31, 2011: |
S1.1, S2.1, S3.1, S3.2
| |
3. | The following sheets by Indoor Environmental Services dated August 31, 2011: |
M0.1, M0.2, M0.3, M0.4, M1.1A, M1.1B, M1.2A, M1.2B, M1.2A, M1.2B, M1.3A, M1.3B, M1.4A, M1.4B, M2.1
| |
4. | The following sheets by O’Rourke Electric Inc. dated August 10 2011: |
E0.1, E2.1, E3.1, E6.1, E6.3, E6.4, E6.5, E6.6, E6.7, E2.2, E2.3, E2.4, E3.2
E3.3, E3.4, E6.2, E6.8, E6.11
| |
5. | Responses to Requests for Information Nos. 1-10 |
EXHIBIT A
|
| | | | |
Tenant Improvement Summary | 12/15/2011 |
|
| | |
Enphase | | |
1400, 1420 N. McDowell Blvd. | Square Foot | 96,000 |
|
Petaluma, CA 94954 | | |
| | |
Description TI Expansion Costs | | Cost |
| | |
Tenant Improvements Per Vila’s 11.16.11 Bid Letter | | $ | 6,001,417.00 |
|
Reductions for Approved COR’s: | | |
COR’s #: 6,8,9,12,19,21,22,23,24,26,28,31,37, | | |
38,39,40,41,43,44,45,48,59,62,63 | | $ | (457,387.00 | ) |
Addition of “Code Only” Fire Alarm Work per Alternate: | | $ | 4,280.00 |
|
Total Contact Amount | | $ | 5,548,290.00 |
|
| | |
Less Overlaps from Prior Approvals: | | |
Ceiling Tile Removal | | $ | (5,000.00 | ) |
Demolition Costs | | $ | 113,203.00 |
|
Other Adjustments, BSP to Pay: | | |
Power during construction: BSP to cover expense | | $ | (7,500.00 | ) |
Temporary toilets: BSP to cover expense | | $ | (2,400.00 | ) |
Code only Fire alarm work | | $ | (4,260.00 | ) |
| | |
Other: | | |
BSP to perform landscape screening at transformers on balcony and one exterior considering unit (note: this cost is NOT included in the Bid Letter; no adjustment req;d) | | $ | — |
|
EMON system work to be performed as part of future TI’s, 2nd and 3rd floor of 1400 as req’d (Note: this cost is not included in Bid Letter; no adjustment req’d) | | $ | — |
|
| | |
Building Permit Fee - (Assumes no Impact Fees) | | by Tenant |
|
CM Fee | | waived |
|
1400 Handicap Parking Improvements - to be charged to | | |
2nd, 3rd Flr. TI Allowance | | $ | — |
|
Structural Engineering Re -Design Proposal - Chiller | | $ | 2,700.00 |
|
Total Costs, This Summary | | $ | 5,418,627.00 |
|
| | |
Prior Authorizations: | | |
10.20.11 1400 Demo, excl. Ceiling Tile Removal Direct Costs | | |
Plan Check Fee | | |
Furniture Mock Up Costs | | |
7.19.11 Ceiling Tile Removal/Slab Moisture Tests | | |
7.15.11 MEP Coordinator & Structural Engineer | | |
7.28.11 Demo for 1420, excluding Cell Tile Removal Costs Approved Separately | | |
7.28.11 Demo Permit costs, w/o Mark up | | $ | 1,216.47 |
|
Total TI Costs Approved to Date: | | $ | 5,590,821.21 |
|
| | |
Tenant Improvement Allowance: $40/sf | | $ | 3,840,000.00 |
|
| | |
Amount Over Tenant Improvement Allowance | | $ | 1,750,821.21 |
|
Agreed Cost Sharing By BSP | | $ | (223,459.00 | ) |
Total Construction and Other Costs Payable | | $ | 1,527,326.21 |
|
EXHBIT B
VILA PROPOSAL - 11/16/11
[attached]
|
| | | |
| Exhibit B Vila Construction Co. GENERALCONTRACTORS 590 South 33rd Street Richmond, California 94804 | |
Office Phone | |
(510) 236-9111 | |
| |
Fax | Contractor’s |
(510) 236-4979 | Lic. No. 300454 |
www.vilaconstruction.com
November16, 2011
Basin Street Properties
1383 North McDowell Blvd., suite 200
Petaluma, CA 94954
Attn: Matt Sherrill
RE: Enphase Tenant Improvement
1400 / 1420 North McDowell
Petaluma, CA
Matt,
The followinq is Our Cost Breakdown for the Enphase Tenant Improvement at 1400/1420 North McDowell Blvd., Petaluma. The costs are based on the Construction Documents from AXIA Architects, dated 5eptember7, 2011.
|
| | | | | |
| | | |
1. | General Conditions | $ | 173,600.00 |
| |
2. | Demo Work | 118,203.00 |
| |
3 | Concrete Work | 5,940.00 |
| |
4. | Pre Cast Concrete Countertops | 65,112.00 |
| *see Line item 34 |
5. | Structural Steel / Metal Fabrications | 164,814.00 |
| |
6. | Carpentry | 90,000.00 |
| |
7. | Millwork | 77,085.00 |
| |
8. | Wood Veneer Paneling | 47,522.00 |
| |
9. | Roof Patching (allowance) | 20,000.00 |
| |
10. | Doors, Frames, Hardware | 132,768.00 |
| |
11. | Glass/Glazing | 264,000.00 |
| |
12. | Glass/ Stainless Steel Railings | 80,360.00 |
| |
13. | Accordian Door | 19,930.00 |
| |
14. | Gypsum Board | 587,917.00 |
| |
15. | Ceramic Tile | 65,049.00 |
| |
16. | Acoustical Ceilings | 58,995.00 |
| |
17. | Floor Covering | 490,385.00 |
| |
18 | Painting | 163,652.00 |
| |
19. | Whiteboards (backing only) | 2,850.00 |
| |
20. | Toilet Partitions/Accesories | 29,060.00 |
| |
21. | Projector Mounts | 21,688.00 |
| |
22. | Access Floor Repair | 20,130.00 |
| |
23. | Signage | by tenant | |
| | | |
| Page 2 | | |
| | | |
24. | Interior Blinds/Motorized Shades | 33,599.00 |
| |
25. | Roof Hatches/Ships Ladders | 24,114.00 |
| |
26. | Elevator Upgrades | 5,940.00 |
| |
27. | Fire Sprinklers | 65,308.00 |
| |
28. | HVAC | 981,776.00 |
| |
29. | Hydronic Piping | 18,590.00 |
| |
30. | Plumbing | 59,205.00 |
| |
31 | Electric | 1,534,862.00 |
| |
32. | Fire Alarm System | 41,095.00 |
| |
33. | Wire Mesh Ceiling | 120,248.00 |
| |
34. | Granite Stone, Lobbles & Stairs 1&2 | 51,336.00 |
| |
| Sub Total | $ | 5,635,133.00 |
| |
| OH & P | 366,284.00 |
| |
| TOTAL LINE ITEMS | $ | 6,001,417.00 |
| |
| | | |
34. | COR #6 | 2,205.00 |
| |
35. | COR #8 | 2,327.00 |
| |
36. | COR #9 | 7,326.00 |
| |
37. | COR #12 | (7,743.00 | ) | |
|
| | | | | |
38. | COR #19 | 145.00 |
| |
39. | COR #21 | — |
| pending engineering |
40 | COR #22 | — |
| pending re-design |
41. | COR #23 | 3,972.00 |
| |
42. | COR #24 | 817.00 |
| |
43. | COR #26 | (4,350.00 | ) | |
44. | COR #28 | (134,519.00 | ) | |
45. | COR #37 | (8,288.00 | ) | |
46. | COR #38 | (34,340.00 | ) | |
47. | COR #39 | (18,813.00 | ) | |
48. | COR #40 | (14,377.00 | ) | |
49. | COR #41 | (69,522.00 | ) | |
50. | COR #43 | (35,770.00 | ) | |
51. | COR #44 | (2,455.00 | ) | |
52. | COR #45 | (5,242.00 | ) | |
53 | COR #48 | (25,246.00 | ) | |
53. | COR #59 | deducted $12,100 from the electric line item (both bldgs) |
54. | COR #63 (allowance) | (4,000.00 | ) | |
| Sub Total | $ | (339,873.00 | ) | |
| OH & P | included | |
| TOTAL COR’s | $ | 339,873.00 |
| |
| | | |
| GRAND TOTAL | $ | 5,661,544.00 |
| |
Page 3
Clarifications & Alternates
1. We do not Include any permit, architectural, or utility company fees.
2. The alternate listed below are Just a few obvious ones. We can review all VE options in our
meeting.
3. Alternate#1; Per the specification, Install R·11 insulation above the acoustical ceiling; ADD $6,805.00
4. Alternate #2; Provide and install a FM 200 fire System In the Server Room; ADD $37,625.00
5. We have not Included changing the wall texture in the exterior stairwells.
6. Electrical Items not Included in above costs, without GC markup;
|
| | |
1. | Restroom lighting over sinks, 1420, allowance | $2,600 |
| | |
2. | Training Room Upgrades | $8,000 |
| | |
3. | Fire alarm system boxes, conduit, & cabling | $55,000 |
7. Cleaning of the existing mini blinds on the exterior windows is NIC.
8. Alternate #3; Fire alarm check, if required:Add $4,260.00
Respectfully Submitted
VILA CONSTRUCTION COMPANY
Robert P. Vila
Vice President
EXHIBIT C
LIST OF CHANGE ORDER REQUESTS
[attached]
|
| | | | | |
Vila Bld Letter Line # | | Accepted CORs # | Description | COR Cost | |
34 | | 6 | move sprinkler valves in lobby | 2,205.00 | |
35 | | 8 | expose steel beam @ Stairs 3 and 4 | 2,327.00 | remove sheet rock from steel beam and paint steel |
36 | | 9 | sheet rock over small windows at Stair #4 | 7,326.00 | |
37 | | 12 | Remove sheet rock from exterior columns | (7,743.00) | |
38 | | 19 | remove sheet rock from inter. Column @wnd floor stair #2 | 145.00 | |
39 | | 21 | increase air flow at relocated board room | — | pending engineering |
40 | | 22 | rotate sodering area and move against Row A | — | pending re-design |
41 | | 23 | change wall at gridline C @ gridline 2-5 to full height wall | 3,972.00 | |
42 | | 24 | Add 230V/50Hz outlet in Engineering Chambers | 817.00 | |
43 | | 26 | Remove sheet rock from interior columns | (4,350.00) | |
44 | | 28 | delete new toilet partitions and tile work | (134,519.00) | This will delete new toilet partitions, replacement of plumbing fixtures and new tile work. ADA shower will remain |
| | | | | |
| | 31 | Delete steel mesh ceiling and install grid mesh | (73,748.00) | this will delete the custom metal mesh ceiling and add metal mesh panels in t-bar grid; new means to support glass wall is required |
| | | | | |
45 | | 37 | change roof hatch to manual | (8,288.00) | this changes the roof hatch door (1 only) to a manual operation in lieu of having an electric motor and switch |
| | | | | |
46 | | 38 | change precast concrete counters to p-lam | (34,340.00) | this will delete the precast concrete countertops at restroom replace them with P-lam |
| | | | | |
47 | | 39 | change door hardware to Dorma | (18,813.00) | |
48 | | 40 | Delete fry reglet and use L metal at sheet rock | (14,377.00) | this will delete the decorative trim at sheet rock locations |
| | | | | |
49 | | 41 | Delete steel canopy at Entry | (69,522.00) | |
50 | | 43 | Delete drywall trim detail at steel bin and metal kickers at exterior walls;run | (35,770.00) | this will delete work shown on Axia SK-1 at perimeter walls |
| | | drywall straight up wall behind beam | | |
|
| | | | | |
| | | | | |
51 | | 44 | Paint corridor walls above metal ceiling and eliminate patching of corridor walls | (2,455.00) | this will eliminate patching of fire caulking and penetrators |
52 | | 45 | change motorized shades to manual | (5,242.00) | this will change the motorized shades at the Training room to manually operated |
| | | | | |
53 | | 48 | delete 1 roof latch and ships ladder at 1400 | (25,246.00) | this will delete roof access at 1400 |
53 | | 59 | cable tray | n/a | deducted $12,100 from the electric line item (both bldgs) |
| | 62 | change the fire alarm scope to code minimus | (43,766.00) | |
54 | | 63 | Add structural steel to roof for chiller | 4,000.00 | Allowance; add structural steel to roof for chiller paint |
| | Sub Total | | (457,387.00) | |
| | OH & P | | included | |
| | TOTAL COR’s | | $(457,387.00) | |
EXHIBIT D
Base Rent and CAM
Labs on Ground Floor - 162 day delay/2=81 days
|
| | | | | | | | | | | | | | | |
Bldg | Sq. ft | Base Rent | CAM | Rent + Cam per day | Office Base Rent and CAM Owed Now |
| | | | | |
1,400 |
| 24,000 |
| $ | 1.10 |
| $ | 0.28 |
| $ | 1,088.88 |
| $ | 88,199.01 |
|
| | | | | |
| | Total Rent and CAM Owed | $ | 88,199.01 |
|
ENPH-2014.12.31-10K-EX10.15
THIRD AMENDMENT TO LEASE
(1420 N. McDowell Blvd.)
THIS THIRD AMENDMENT TO LEASE (this "Amendment") dated as of May 14, 2014, is entered into between SEQUOIACENTERLLC, a California limited liability company ("Landlord") and ENPHASE ENERGY, INC., a Delaware corporation ("Tenant").
THE PARTIES ENTER INTO THIS AMENDMENT based upon the following facts, understandings and intentions:
A. Landlord and Tenant previously entered into that certain Redwood Business Park NNN Lease dated as of June 3, 2011, as amended by that certain First Amendment to Lease dated as of January 12, 2012 and that certain Second Amendment to Lease dated as of July 3, 2012 (together with all exhibits thereto, the "Lease") pursuant to which Tenant leases from Landlord the entire building commonly known as 1420 N. McDowell Boulevard, Petaluma, California. Capitalized terms used herein and not defined herein shall have the meanings set forth in the Lease (including the Work Letter Agreement attached as Exhibit B thereto) in connection therewith.
B. Tenant desires to install solar panels on the majority of the roof space of the Building, and Landlord is willing to consent to such installation on the terms and conditions set forth in this Amendment.
C. Landlord and Tenant desire to make certain changes to the Lease as further provided herein.
NOW, THEREFORE, IN CONSIDERATION of the mutual covenants and promises of the parties, the receipt and adequacy of which are hereby acknowledged, the parties hereto agree as follows:
1. Grid-Tied Photovoltaic System. Tenant wishes to install a Grid-Tied Photovoltaic System consisting of two (2) arrays totaling 262 solar modules and related equipment (collectively, the "Photovoltaic System"), as more fully described in (i) the plans prepared by Realgoods Solar dated April 2, 2014 containing sheets PV-000, PVA01,PV• A01A,PV-A02,PV-A03,PV-A04,PV-E01,PV-E02,(System Placards), PV-E02 (Electrical Cales) and PV-G01,and (ii) the plans from ZFA Structural Engineers dated May 4, 2014 containing 5 pages (collectively, the "Specifications").
2. Landlord Approval. Landlord hereby consents the installation of the Photovoltaic System and the Roof Coating (defined below) on the roof of the Building on the terms and conditions set forth in this Amendment.
3. Terms and Conditions. The following terms and conditions shall apply to the work contemplated in this Amendment:
3.1. Permits. Tenant shall obtain all permits required for the work contemplated in this Amendment; provided that Landlord shall reasonably cooperate in procuring such permits at no cost to Landlord.
3.2. Silicone Roof Coating. In connection with the installation of the
Photovoltaic System, Tenant shall install a silicone roof coating (the "Roof Coating") over
the entire roof of the Building in accordance with the specifications set forth in the proposal from Petersen Dean contractors dated March 11, 2014 containing14 pages, plus walking pads for the protection of the Roof Coating (the "Walking Pads") in locations and with specifications to be approved by Landlord, which approval shall not be unreasonably withheld. Such coating and Walking Pads are required to (i) prevent leaks in the roof of the Building following numerous penetrations to the roof membrane that will occur in connection with the installation of the Photovoltaic System and (ii) extend the life of the roof system which after the Photovoltaic System installation would be very expensive to replace. Tenant shall use best effort to limit its activities on the roof to the Walking Pads to protect the Roof Coating.
3.3. Maintenance. Tenant shall maintain the Photovoltaic System in good condition and repair at its sole cost and expense. By installing the Photovoltaic System, Tenant will be: (i) creating numerous penetrations of the roof membrane, [ii) adding substantial weight on the roof of the Building and (iii) accessing the roof on a more frequent basis to monitor, adjust. maintain or modify the Photovoltaic System. Tenant acknowledges that all maintenance, repair and replacement costs with respect to the roof, the Roof Coating, the roof membrane and the roof structure incurred by Landlord in connection with the installation, use, modification or removal of the Photovoltaic System will constitute Operating Expenses under the Lease. The foregoing is not intended to and shall not limit Tenant's indemnity under Section 25 of the Lease.
3.4. Costs. Landlord has not agreed to provide any funding in connection with the work contemplated in this Amendment, and Tenant shall be responsible for 100% of the cost of the work performed pursuant to or in connection with this Amendment, including without limitation all design, permitting, construction, maintenance, repair and replacement costs.
3.5. Applicability of Lease Section 10.2. Section 10.2 of the Lease shall apply to the work contemplated in this Amendment. Without limiting the foregoing, Tenant shall remove the Photovoltaic System and the Roof Coating at the end of the Term in accordance with Section 10.2.6 of the Lease.
3.6. Applicability of Lease Section 25. Section 25 of the Lease, including without limitation the indemnity set forth therein, shall apply to the work contemplated in
this Amendment. The Photovoltaic System and the Roof Coating shall constitute "Equipment" under Section 25 of the Lease; provided that maintenance of the Roof Coating shall be performed by Landlord pursuant to Section 3.3 above.
3.7. Changes. Any changes to the Photovoltaic System, the Roof Coating or the Specifications shall require the prior written approval of Landlord, which approval may be withheld in Landlord's sole and absolute discretion. Without limiting the foregoing, no Equipment (except for the Roof Coating) shall be permitted within six (6) feet of the edge of the roof of the Building.
4. Entire Agreement. This Amendment represents the entire understanding between Landlord and Tenant concerning the subject matter hereof, and there are no understandings or agreements between them relating to the Lease or the Premises not set forth in writing and signed by the parties hereto. No party hereto has relied upon any representation, warranty or understanding not set forth herein, either oral or written, as an inducement to enter into this Amendment.
5. Continuing Obligations. Except as expressly set forth to the contrary in this Amendment, the Lease remains unmodified and in full force and effect To the extent of any conflict between the terms of this Amendment and the terms of the Lease, the terms of this Amendment shall control.
[SIGNATURES ON FOLLOWING PAGE]
IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year first above written.
|
| | | | | |
"LANDLORD" | "TENANT" | |
| | | | | |
| | | | | |
SEQUOIA CENTER LLC, | ENPHASE ENERGY, INC., |
| |
a California limited liability company | a Delaware corporation |
| | |
By: | G&W Ventures, LLC, | By: | /s/ Paul Nahi |
| a California limited liability company, | | Name: Paul Nahi |
| its Manager | | Its: President/CEO |
| | | | | |
| | | | | |
| By: | /s/ Matthew T. White | | | |
| | Matthew T. White, Manager | | | |
ENPH-2014.12.31-10K-EX21.1
Exhibit 21.1
SUBSIDIARIES OF REGISTRANT
|
| | |
Enphase Energy Australia Pty. Ltd., an Australian corporation. |
Enphase Energy Canada, Inc., a Canadian corporation. |
Enphase Energy S.A.S., a French corporation. |
Enphase Energy S.r.l., an Italian corporation. |
Enphase Energy New Zealand Limited, a New Zealand corporation. |
Enphase Energy UK Limited, a United Kingdom corporation. |
ENPH-2014.12.31-10K-EX23.1
Exhibit 23.1
CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
We consent to the incorporation by reference in Registration Statement Nos. 333-195694 on Form S-3, and 333-181382 and 333-187057 on Form S-8 of our report dated March 3, 2015, with respect to the consolidated financial statements of Enphase Energy, Inc. and subsidiaries appearing in this Annual Report on Form 10-K of Enphase Energy, Inc. for the year ended December 31, 2014.
/s/ Deloitte & Touche LLP
San Jose, California
March 3, 2015
ENPH-2014.12.31-10K-EX31.1
Exhibit 31.1
CERTIFICATION
I, Paul B. Nahi, certify that:
| |
1. | I have reviewed this Annual Report on Form 10-K of Enphase Energy, Inc.; |
| |
2. | Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report; |
| |
3. | Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report; |
| |
4. | The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have: |
| |
a. | designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared; |
| |
b. | designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles; |
| |
c. | evaluated the effectiveness of the registrant's disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and |
| |
d. | disclosed in this report any change in the registrant's internal control over financial reporting that occurred during the registrant's most recent fiscal quarter (the registrant's fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant's internal control over financial reporting; and |
| |
5. | The registrant's other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant's auditors and the audit committee of the registrant's board of directors (or persons performing the equivalent functions): |
| |
a. | all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant's ability to record, process, summarize and report financial information; and |
| |
b. | any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant's internal control over financial reporting. |
Date: March 3, 2015
|
| |
| /s/ Paul B. Nahi |
| Paul B. Nahi President and Chief Executive Officer (Principal Executive Officer) |
ENPH-2014.12.31-10K-EX31.2
Exhibit 31.2
CERTIFICATION
I, Kris Sennesael, certify that:
| |
1. | I have reviewed this Annual Report on Form 10-K of Enphase Energy, Inc.; |
| |
2. | Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report; |
| |
3. | Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report; |
| |
4. | The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have: |
| |
a. | designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared; |
| |
b. | designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles; |
| |
c. | evaluated the effectiveness of the registrant's disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and |
| |
d. | disclosed in this report any change in the registrant's internal control over financial reporting that occurred during the registrant's most recent fiscal quarter (the registrant's fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant's internal control over financial reporting; and |
| |
5. | The registrant's other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant's auditors and the audit committee of the registrant's board of directors (or persons performing the equivalent functions): |
| |
a. | all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant's ability to record, process, summarize and report financial information; and |
| |
b. | any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant's internal control over financial reporting. |
Date: March 3, 2015
|
| |
| /s/ Kris Sennesael |
| Kris Sennesael Vice President and Chief Financial Officer (Principal Financial Officer) |
ENPH-2014.12.31-10K-EX32.1
Exhibit 32.1
CERTIFICATION
Pursuant to the requirement set forth in Rule 13a-14(b) of the Securities Exchange Act of 1934, as amended, (the "Exchange Act") and Section 1350 of Chapter 63 of Title 18 of the United States Code (18 U.S.C. §1350), Paul B. Nahi, President and Chief Executive Officer of Enphase Energy, Inc. (the "Company"), and Kris Sennesael, Vice President and Chief Financial Officer of the Company, each hereby certifies that, to the best of his knowledge:
| |
1. | The Company's Annual Report on Form 10-K for the annual period ended December 31, 2014, to which this Certification is attached as Exhibit 32.1 (the "Report"), fully complies with the requirements of Section 13(a) or Section 15(d) of the Exchange Act; and |
| |
2. | The information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company. |
In Witness Whereof, the undersigned have set their hands hereto as of the 3rd day of March, 2015.
|
| | |
/s/ Paul B. Nahi | | /s/ Kris Sennesael |
Paul B. Nahi President and Chief Executive Officer | | Kris Sennesael Vice President and Chief Financial Officer |
This certification accompanies the Form 10-K to which it relates, is not deemed filed with the Securities and Exchange Commission and is not to be incorporated by reference into any filing of Enphase Energy, Inc. under the Securities Act of 1933, as amended, or the Securities Exchange Act of 1934, as amended (whether made before or after the date of the Form 10-K), irrespective of any general incorporation language contained in such filing.